Text
Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0032 GL 97-02 April 7, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 MONTHLY OPERATING REPORTS Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 2003.
Sincerely, A. J. Cayia Site Vice President KML Attachment cc: J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager L94 6590 Nuclear Road
- Two Rivers, Wisconsin 54241 Telephone: 920.755 2321
UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 4/02/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: March 2003 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G. Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit I average daily power for the month of March was 5511.2 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in March:
ii)
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 04/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD March - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 233,759.4
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 2,160.0 230,218.5
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 380,351.5 1,098,774.5 106,650,083.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
I It UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 4/02/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: March 2003 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G .Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 2 average daily power for the month of March was 517.4 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in March:
A OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 04/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD March - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 227,913.1
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 2,160.0 224,925.7
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
- 6. NET ELECTRICAL ENERGY (MWH) 384,955.5 1,109,964.5 105,897,768.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
Text
Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0032 GL 97-02 April 7, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 MONTHLY OPERATING REPORTS Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 2003.
Sincerely, A. J. Cayia Site Vice President KML Attachment cc: J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager L94 6590 Nuclear Road
- Two Rivers, Wisconsin 54241 Telephone: 920.755 2321
UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 4/02/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: March 2003 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G. Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit I average daily power for the month of March was 5511.2 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in March:
ii)
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 04/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD March - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 233,759.4
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 2,160.0 230,218.5
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 380,351.5 1,098,774.5 106,650,083.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
I It UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 4/02/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: March 2003 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G .Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 2 average daily power for the month of March was 517.4 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in March:
A OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 04/02/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD March - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 227,913.1
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 2,160.0 224,925.7
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2