Letter to W Tauzin from R Meserve, Forwarding Additional Agency Records Responsive to 05/24/02 Letter
ML031050038
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/09/2002
From: Meserve R
NRC/Chairman
To: Tauzin W
US HR, Comm on Energy & Commerce
References
-nr, FOIA/PA-2003-0018
Download: ML031050038 (40)


Text

cI A-UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 9, 2002 AIRIMAN The Honorable W.J. "Billy" Tauzin, Chairman Committee on Energy and Commerce United States House of Representatives Washington, D.C. 20515

Dear Mr. Chairman:

This letter forwards additional agency records responsive to your letter dated May 24, 2002, in which you requested records related to the reactor pressure vessel head degradation at the Davis-Besse Nuclear Power Station. The Nuclear Regulatory Commission (NRC) has previously provided two sets of records that were sent to your office with my letters dated June 14 and July 1, 2002. I expect that a final set of documents responsive to your request will be sent you by the end of next week.

The records that we are providing you in this and in our other responses have been identified as a result of a comprehensive and conscientious search for records by agency staff.

These records represent correspondence with the Davis-Besse licensee, communications with the nuclear industry, internal NRC notes, memoranda and e-mail, and non-documentary material (such as photographs) related to the agency's oversight of the Davis-Besse licensee and response to technical issues related to the facility's degraded reactor pressure vessel head.

As you will note from the enclosed list, some of the records are not currently available to the public because they constitute pre-decisional, intra-agency memoranda or, in a few instances, because they contain proprietary information. The unauthorized release of proprietary information in particular could result in sanctions under the Trade Secrets Act.

Non-public documents are marked as such, and I request that you restrict access to this information to Members and staff of the Committee. The NRC may determine to make some of these documents available to the public in response to a pending request under the Freedom of Information Act (FOIA). We will inform you if the status of any of these currently non-public documents changes as a result of the FOIA review.

Additionally, the NRC's Office of Investigations (01) is conducting an investigation of potential wrongdoing related to the licensee's handling of the reactor vessel head degradation matter. 01 has briefed Committee staff twice on the status of the investigation. The NRC's Inspector General is also examining issues related to the Davis-Besse matter.

rely, S

Richard A. Meserve

Enclosure:

List of Records I

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Renuaustad bv Conaressmen Tauzin & Gillmor Item No.

ReodTteEst.

Date Disposition (note 1)

Record Title Volume (note 2)

SECY-02-0046 - For the Commissioners from A-040 illiam D. Travers re: Proposed Bulletin: Reactor 15 pages 03/18/02 Public Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity A-086 Notice of Significant Licensee Meeting 2 pages 05/03/02 Public (Thursday, May 9 at 7:00 p.m. (EST))

A-1Boric Acid Corrosion of the Vessel Head 3 pages Unknown Public A-121 NUREG/CR-6245 B-002 E-mail from Lawrence Chandler re: Davis-Besse 1 page 11/07/01 Public Order E-mail from Deanna Clarke re: 11/16/01; B-002a Issuance of Orders Regarding Responses to 1 page 11/27/01 Public Nuclear Regulatory...

B-002b E-mail from Lawrence Burkhart re: Davis-Besse 1 page 11/07/01 Public Order B-004 E-mail from Lawrence Chandler re: Fwd: Davis-1 page 11/13/01 Public Besse Meeting 11/14/01 B-004a E-mail from Giovanna Longo re: Davis-Besse a page 11/13/01 Public B-004a 1es etng1/40 pages 11/13/01 Public Meeting 11/14/01 B-004b E-mail from Douglas Pickett re: Fwd: Davis-5 pages 11/13/01 Public Besse Meeting 11/14/01 B-006 E-mail from Giovanna Longo re: Results of 1 page 11/02/01 Public

_ Meeting today at 3 pm B-022 E-mail from Joseph Gray re: Fwd: Request for TA 3 pages 03/11/02 Public briefing on Davis-Besse B-022A E-mail from Lawrence Chandler re: Fwd: TA 3 pages 03/12/02 Public Briefing on Davis-Besse B-023 E-mail from L. Chandler re: Weekly CRDM Status 2 pages 03/11/02 Public

____Update B-024G E-mail from Lawrence Chandler re: Fwd: Davis-1 page 03/14/02 Public Besse Communication Plan B-026 Meeting notice of TA briefing on Davis-Besse 1 page 03/14/02 Public B-027 E-mail from Lawrence Chandler re: TA Briefing 3 pages 03/14/02 Public on Davis-Besse II Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

Est.

Disposition (note 1)

RVolume Dat (note 2)

B-027A E-mail from Dennis Dambly re: Fwd: TA Briefing 1 page 03114/02 Public on Davis-Besse B-027B E-mail from Lawrence Chandler re: Fwd: TA 1 page 03/14/02 Public Briefing on Davis-Besse___________

B-030 E-mail from L. Chandler re: Status Report 2 pages 03/15/02 Public E-Mail from T. Mayberry re: Davis-Besse PNO-111-B-031 02-006A, Significant Metal Loss In Reactor 2 pages 03/15/02 Public Vessel Head B-032 E-mail from Lawrence Chandler re: Fwd: Agenda 6 pages 03/15/02 Public for CRGR Meeting #368, March 18, 2002 B-033 E-mail from Lawrence Chandler re: Fwd: Another 2 pages 03/15/02 Public Schedule Adjustment for Mon. 3/18 Exp. ET B-037 E-mail from W. Travers re: EDO Updates 1 page 03/18/02 Public B-038 Meeting notice from Lawrence Chandler re:

1 page 03/18/02 Public Davis-Besse Bulletin w/CRGR B-039 E-mail from Giovanna Longo re: Public Meeting 1 page 03/19/02 Public oday__

B-040 E-mail from Anthony Mendiola re: Public Meeting 1 page 03/19/02 Public o-40 n Davis-Besse (3/20)

B-041 E-mail from Mitzi Young re: Public Meeting on 2 pages 03/20/02 Public Davis-Besse (3/20)

B-046 E-mail from Douglas Pickett re: Today's Toledo 3 pages 03/29/02 Public Blade B-048 E-mail from Douglas Pickett to Sally Jewell re:

1 page 03/29/02 Public Pictures B-049 E-mail from Lawrence Chandler re: Davis-Besse 7 pages 04/01/02 Public Pictures B-051 E-mail from Douglas Pickett re: Control Rod 13 pages 04/02/02 Public Relocation Lawrence C l

Tags 2i B-052 E-mail from Lawrence Chandler re: Today's 5 pages 04/02/02 Public Toledo Blade

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note 1)

ReodTteVolume Dae (note 2)

B-053 E-mail from Patricia Tressler re: ADAMS Action Green Ticket for NRR - G20020184/Ltr-02-0028 2 pages 04/03/02 Pubic B-058 E-mail from D. Pickett re: Davis-Besse Safety 1 page 04/09/02 Public Significance Assessment B-059 E-mail from Victor Dricks re: Milestone Schedule 1 page 04/09/02 Public B-060 E-mail from Brian Sheron re: Milestone Schedule 1 page 04/09/02 Public B-061 E-mail from Giovanna Longo re: ACRS Meetings 1 page 04/11/02 Public of April 9, 1 0 & li1re: Davis-Besse B01AE-mail from Lawrence Chandler re: ACRS2pae04102 Pbi B-061 A Meetings of April 9,10 & 11 re: Davis-Besse 2 pages 04/11/02 Public B-064 E-mail from T. Mayberry re: Davis-Besse PNO-3 pages 04/16/02 Public 1111-02-016 B-067 E-mail from Lawrence Chandler re: Fwd: Minutes 8 pages 04/23/02 Public of CRGR Meeting #368 B-068 E-mail from T. Mayberry re: PNO-ll1 016A 4 pages 04/24/02 Public Davis-Besse Update____

B-070 E-mail from Lawrence Chandler re: Reactor Head 1 page 05/01/02 Public B-076 E-mail from Susan Chidakel re: Results of 1 page 05/06/02 Public Meeting____

B-077 E-mail from Steven Bloom re: Reactor Vessel 1 page 05/08/02 Public

,Head Degradation Status Report B-078

-ail from Mitzi Young re: YMP Team Meeting 25 pages 05/08/02 Public 0-day (5/8/2002)

B-082 E-mail from Susan Chidakel re: Davis-Besse 1 page 05/13/02 Public Memo____

E-mail from Joseph Gray re: Committee to B-083 Examine Problems at Davis-Besse Nuclear 5 pages 05/16/02 Public Power Plant E-mail from Yvonne Edmonds re: Davis-Besse B-085 Response Ltr dtd 5/7/02 to C. Patronik - Holder 1 page 05/16/02 Public rom S. Collins on Whole Plant X-ray B-086 E-mail to Art Howell re: Fwd: Per your request 1 page 05/17/02 Public Listing of Records Concerning Vessel Head Degradation at Davis-Besse l___

Requested by Congressmen Tauzin & Gillmor Item No.

Record Title Est.

Date Disposition (note 1)

Volume (note 2)

E-mail from Lawrence Chandler re: Committee to B-088 Examine Problems at Davis-Besse Nuclear 10 pages 05/17/02 Public Power Plant B-089 E-mail from Art Howell re: Per your request 7 pages 05/17/02 Public B-090 E-mail to Art Howell re: Per your request 1 page 05117/02 Public B-091 E-mail from Art Howell re: Fwd: Per your request 1 page 05/20/02 Public B-092 E-mail from Joseph Gray re: Fwd: Davis-Besse 1 page 05/20/02 Public Lessons Learned Task Force B-093 E-mail from James Lieberman re: Fwd: Davis-1 page 05/20/02 Public Besse Lessons Learned Task Force B-094 E-mail from Art Howell re: Per your request 7 pages 05/20/02 Public B-095 E-mail from Joseph Gray re: Fwd: Davis-Besse 1 page 05/20/02 Public Lessons Learned Task Force B-096 E-mail from James Lieberman re: Davis-Besse 2 pages 05/20/02 Public Lessons Learned Task Force B-097 E-mail from L. Chandler re: Davis-Besse Lessons 1 page 05/20/02 Public Learned Task Force B-098 E-mail from Dennis Dambly re: Davis-Besse 1 page 05/20/02 Public Lessons Learned Task Force B-099 E-mail from James Lieberman re: Davis-Besse 1 page 05/20/02 Public Lessons Learned Task Force B-1 00 E-mail from Lawrence Chandler re: Davis-Besse 1 page 05/20/02 Public Lessons Learned Task Force B-101 E-mail from J. Lieberman re: Davis-Besse 1 page 05/20/02 Public Lessons Learned Task Force B-102 E-mail from J. Gray re: Davis-Besse Lessons 1 page 05/20/02 Public Learned Task Force E-mail from Giovanna Longo re: Fwd: Committee B-103 o Examine Problems at Davis-Besse Nuclear 6 pages 05/20/02 Public Power Plant B-106 E-mail from Joseph Gray re: First Energy 3 pages 05/23/02 Public Purchase of Midland Head Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Date Disposition (note 1)

Volume (note 2)

B-111 E-mail from Michael Marshall re: Vessel Head 3 pages 05/31/02 eubaic B-ill Penetration Cracking Weekly Status Report 3 page 05/3/02 Public B-i 12 E-mail from Susan Chidakel re: Davis-Besse 1 page 06/03/02 Public B-i 13 E-mail from Susan Chidakel re: Davis-Besse 1 page 06/04/02 Public B-201 e-mail from Steve Long to Beth Wetzel, subject 1 page 02/22/02 Public

'Re: INTERNAL MEETING ON CRDMS" B22e-mial from Steve Long to Andrea Lee, subject ipg 22/2 Pbi B-202

'Re: Fwd: CRDMW 1 page 02/28/02 Public B-204 e-mail from Steve Long to F. Mark Reinhart, 1 page 03/05/02 Public Subjet: Re: CRDM Writeup______

e-mail from Steve Long to Allen Hiser, Andrea B-205 Lee, Beth Wetzel, M. Reinhart and Jin Chung, 1 page 03/05/02 Public ubject: Meeting on SPSB Support for CRDM NUREG e-mail from Steve Long to Allen Hiser, Andrea B26Lee, Beth Wetzel, M. Reinhart and Jin Chung, 1 page 03/05/02 Public

Subject:

Meeting on SPSB Support for CRDM NUREG e-mail from Steve Long to Beth Wetzel and M.

B-207 Reinhart,

Subject:

Re: CONFLICT FOR 2:00 1 page 03/07/02 Public P.M. 5/7 B-208 e-mail from Steve Long to Rick Ennis,

Subject:

1 pae 03/11102 Public Re: Millstone 2 Relief Requests & Change of PM p

0 e-mail from Steve Long to Kenneth Karwoski, B-209

Subject:

Risk Slide for TA Brief with attached 2 pages 03/13/02 Public Doc. Risk Implications

-mail from Steve Long to Kenneth Karwoski, B-210 ubject: Risk Slide for TA Brief with attached 1 page 03/14/02 Public Doc. Risk Implications I

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Record Title Est.

Date Disposition Volume (note 2) e-mail from Steve Long to George Lanik

Subject:

Fwd: Dates/Times/Locations for Telecons with Davis-Besse with attached e-mail from Stephen 2 pages 03/14/02 Pubic Sands to CRDM e-mail from Steve Long to Beth Wetzel

Subject:

1pg 03402 Pbi Re: Fwd: Davis-Besse & INES Rating 1 page 03/14/02 Public e-mail from Steve Long to Jim Dyer

Subject:

E-1 page 03/14/02 Public mail from UCS e-mail from Steve Long to Beth Wetzel, Douglas Pickett, Stephen Sands, Steven Bloom,

Subject:

2 pages 03/14/02 Public Fwd: Lochbaum's E-mail "Dropped Acid at Davis-Besse' with attached E-mail e-mail from Steve Long to George Lanik,

Subject:

1 page 03/14/02 Public Re: 20314 Operating Experience Summary e-mail from Steve Long to Douglas Pickett, 1 page 03/26/02 Public

Subject:

Re: Davis-Besse Questions e-mail from Steve Long to Allen Hiser,

Subject:

DAVIS-BESSE ROOT CAUSE QUESTIONS 1 page 03/27/02 Pubic e-mail from Steve Long to Beth Wetzel,

Subject:

1 page 03/27/02 Public LOCA Size Definitions for Davis-Besse e-mail from Steve Long to Beth Wetzel,

Subject:

1 page 03/27/02 Public Re: LOCA Size Definitions for Davis-Besse e-mail from Steve Long to Douglas Pickett,

Subject:

Verifying Some Davis-Besse PRA Info 1 page 03/28/02 Pubic e-mail from Steve Long to Jin Chung,

Subject:

2 page 03/28/02 Public Re: LOCA Size Definitions for Davis-Besse e-mail from Steve Long to William Cullen, 2 page 03/28/02 Public

Subject:

Re: Fwd: More Davis-Besse Analysis e-mail from Steve Long to Jun Chung, Patrick O'Reilly,

Subject:

Re: Large LOCA Treatment in 1 page 04/01/02 Public Revision 3i SPAR Models Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note1 Record Title Volume Date (note 2) e-mail from Steve Long to Allen Hiser, Andrea Lee, Beth Wetzel, Douglas Pickett, Jin Chung, B-226 Patrick O'Reilly, Steven Bloom,

Subject:

Re: Fwd: 4 pages 04/01/02 Public erifying Some Davis-Besse PRA Info with attached E-mail from Mike Leisure e-mail from Steve Long to Patrick O'Reilly, B-227

Subject:

Re: Fwd: Verifying Some Davis-Besse 1 page 04/01/02 Public PRA Info e-mail from Steve Long to Douglas Pickett, B-228

Subject:

Revise Response for Davis-Besse 1 page 04/01/02 Public Question 33 B-229 e-mail from Steve Long to Mark Reinhart, Jin 1 page 04/10/02 Publi Chung,

Subject:

Re: Davis-Besse 1 page 04/10/02 Public B-230 e-mail from Steve Long to Mark Reinhart, Jin 1 page 04/10/02 Public

_______Chung,

Subject:

Re: Davis-Besse B-231 e-mail from Steve Long to Jin Chung,

Subject:

1 page 04/11/02 Public lRe: Davis-Besse B-232 e-mail from Steve Long to Jin Chung,

Subject:

1 page 04/11/02 Public Re: Davis-Besse B-233 e-mail from Steve Long to Mark Reinhart, Jin 1 page 04/15/02 Public C____hung,

Subject:

Re: CRDM Briefing_________

e-mail from Steve Long to Allen Hiser, et. al, B-234

Subject:

Re: Items for Today's 2:00p.m. Davis-2 page 04/15/02 Public Besse Call e-mail from Steve Long to Allen Hiser, et. al, B-235

Subject:

Re: Items for Today's 2:00p.m. Davis-1 page 04/15/02 Public esse Call B-236 e-mail from Steve Long to Beth Wetzel,

Subject:

1 page 04/15/02 Public MEETING WITH NEI/MRP RE:

e-mail from Steve Long to Jin Chung, Sonia B-237 Burgess,

Subject:

Re: Questions to Region 3 4 pages 04/15/02 Public SRA on Davis-Besse with Attached RAI wpd file e-mail from Steve Long to Sonia Burgess,

Subject:

Fwd: Questions to Region 3 SRA on B-238 Davis-Besse with attached e-mail from Jin Chung 3 pages 04/15/02 Public with questions on Davis-Besse CRDM Issues Risk-Related Issues Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor ItmN.Record Title Volum Date Disposition (note 1)

Volume (note 2) e-mail from Steve Long to Michael Parker, B-239

Subject:

Fwd: Re: Questions to Region 3 SRA on 1 page 04/15/02 Public Davis-Besse e-mail from Steve Long to Edwin Hackett, B-240

Subject:

Re: Items for Today's 2:00 p.m. Davis-1 page 04/15/02 Public Besse Call e-mail from Steve Long to Beth Wetzel, Douglas B-241 Pickett, Stephen Sands,

Subject:

Fwd: Re:

1 page 04/16/02 Public Questions to Region 3 SRA on Davis-Besse e-mail from Steve Long to Jin Chung, Michael Parker, Sonia Burgess,

Subject:

Steve's Revised B-242 Q4 for Davis-Besse PSA with attached wpd file 4 pages 04/16/02 Public Request for Additional Information Concerning he FENOC "Probabilistic Safety Assessment" for he Void in the RPV Head at Davis-Besse e-mail from Steve Long to Beth Wetzel,

Subject:

B-243 Fwd: D-B CRDM circ cracking SER with attached 2 pages 04/16/02 Public e-mail from R. Frahm e-mail from Steve Long to Bill Bateman, Chia-Fu Sheng, Christine Lipa, John Jacobson, Ronald B-244 Gardner, Stephanie Coffin,

Subject:

Re: Draft 1 page 04/23/02 Public Staff Comments on the Davis-Besse Reactor Head Repair Plan Outlines e-mail from Steve Long to Douglas Pickett, B-245

Subject:

Fwd: Davis-Besse risk assessment 2 pages 04/23102 Public telecon with attached e-mail from Sonia Burgess to Jin Chung, Steven Long e-mail from Steve Long to Michael Johnson, B-247 Peter Wilson,

Subject:

Fwd: Conceptual Basis for 1 page 04/23/02 Public an SDP for Davis-Besse Head Cavity e-mail from Steve Long to Keith Wichman, B-248

Subject:

Re: Draft Staff Comments on the Davis-1 page 04/23/02 Public Besse Reactor Head Repair Plan Outlines e-mail from Steve Long to Bill Bateman,

Subject:

B-249 Re: Draft Staff Comments on the Davis-Besse 1 page 04/23/02 Public Reactor Head Repair Plan Outlines Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note )

Record Title Volume Date (note 2) e-mail from Steve Long to Peter Wilson,

Subject:

Revised Qs for FENOC's Cavity Risk B-250 Assessment with attached Request for Additional 4 pages 04/24/02 Public Information Concerning the FENOC "Probabilistic Safety Assessment" for the Void in the RPV Head at Davis-Besse e-mail from Steve Long to Mark Caruso,

Subject:

B-251 Revised Qs for FENOC's Cavity Risk 4 pages 04/24102 Public Assessment with attached Request for Additional Information e-mail from Steve Long to Peter Wilson,

Subject:

B-252 Revised Qs for FENOC's Cavity Risk 2 pages 04/25/02 Public ssessment with attached e-mail to Mark Caruso B-253 e-mail from Steve Long to Allen Hiser,

Subject:

2 pages 04/25/02 Public B23Fwd: AFTER MEETING DISCUSSIONS2pae045/2 Pbi e-mail from Steve Long to Stephen Sands, ubject: Fwd: 05/07/2002 Meeting Notice, B-254 Meeting with Firstenergy Nuclear Operating 2 pages 04/25/02 Public ompany with attached e-mail from Jane Chimood_

e-mail from Steve Long to Allen Hiser,

Subject:

B-255 Fwd: for Meeting summary with attached e-mails 3 pages 04/26/02 Public from David Nelson (HQ-OE) e-mail from Steve Long to Douglas Pickett, B-256

Subject:

Re: Fwd: Draft Documents for FOIA 1 page 04/26/02 Public Responses

-mail from Steve Long to Douglas Pickett, B-257 tephen Sands,

Subject:

Fwd: Re: COMSECY 1 page 04/26/02 Public responses and Davis-Besse questions e-mail from Mark Caruso to John Grobe,

Subject:

B-258 Fwd: Re: COMSECY responses and Davis-Besse 1 page 04/26/02 Public questions

-mail from Micheal Johnson to Mark Caruso, B-259 ubject: Re: COMSECY responses and Davis-1 page 04/25/02 Public Besse questions B-260 e-mail from Steve Long to Stephen Sands, 1 page 04/29/02 Public

Subject:

Re: TAC Numbers for Davis-Besse e-mail from Steve Long to John Grobe, Mark B-261 aruso, Sonia Burgess,

Subject:

Fwd: Re:

1 page 04/30/02 Public COMSECY responses and Davis-Besse questions Listing of Records Concerning Vessel Head Degradation at Davis-Besse Reauested bv Conaressmen Tauzin & Gillmor

  • a

_ _ _ _ _ _ Z__

  • j a

Item No.

ReodTteEst.

Dae Disposition (note 1)

Record Title Volume Date (note 2) e-mail from Steve Long to John Grobe, Mark B-262 Caruso, Sonia Burgess,

Subject:

Fwd: Re:1 page 04/30/02 Public COMSECY responses and Davis-Besse 1pg 43/2 Pbi questions e-mail from Steve Long to Don Marksberry:

B-263 George Lanik, Patrick O'Reilly,

Subject:

ASP 2 page 05/01/02 Public insights B-264 e-mail from Steve Long to Beth Wetzel,

Subject:

1 page 05/01/02 Public Re: NEXT ACRS VISIT B-265 e-mail from Steve Long to Maggalean Weston, 1pg 50/2 Pbi

Subject:

ACRS Discussions of Davis-Besse 1 page 05/01/02 Public e-mail from Steve Long to Brent Clayton, James Heller, Joseph Ulie, OcC3, Richard Paul,

Subject:

05/01/02 Publi Input to ARB with attached e-mails from Steve Long, David Nelson (HQ-OE), Jack Strosnider e-mail from Steve Long to Michele Janicki, 0-267

Subject:

Re: Another Davis-Besse Question 1 page 05/02/02 Pubic e-mail from Steve Long to Don Marksberry, Sonia Burgess,

Subject:

Definition of SDP "Risk B-268 Question" for Davis-Besse Head Cavity with 3 pages 05/03/02 Public attached Statement of Risk Issues for SDP Analysis B-269 e-mail from Steve Long to Gary Holahan, 1 page 05/03/02 Public

Subject:

Monday mtg on Markey Qs___________

e-mail from Steve Long to Sonia Burgess, B-270

Subject:

Re: Definition of SDP "Risk Question" 1 page 05/03/02 Public for Davis-Besse Head Cavity e-mail from Steve Long to Sonia Burgess, B-271

Subject:

Fwd: Davis-Besse Risk Assessment with 4 pages 05/06/02 Public attached e-mail to Michael Johnson and Risk assessment e-mail from Steve Long to Michael Johnson, B-272

Subject:

Definition of Davis-Besse Risk Question 3 pages 05/07/02 Public and Data Needs with attachment Doc.

e-mail from Steve Long to Michael Johnson, 0-273

Subject:

Fwd: Internal Panel meeting - May 9 with attached agenda and document file on the risk 6 pages 05/08/02 Pubic question definition

- I1 -

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

Record Title Est.

Date Disposition (note 1) dVolume (note 2)

B-274 e-mail from Steve Long to Mark Caruso,

Subject:

1 page 05/08/02 Public Re: SDP for Oconee CRDM Nozzle Cracks B-275 e-mail from Steve Long to Beth Wetzel,

Subject:

1 page 05109/02 Public

-25Re: PREP. FOR ACRS MEETING 1pg 50/2 Pbi

-mail from Steve Long to Melvin Holmberg, B-277

Subject:

Re: Risk evaluation for Davis-Besse 3 pages 05/14/02 Public Nozzle Cracks e-mail from Steve Long to Beth Wetzel, B-278 Gwilkows~columbus.rr.com, subject: RE:

3 pages 05/14/02 Public MEETING WITH NEI/MRP RE:

e-mail from Steve Long to Jin Chung, Walt B-279 Rogers,

Subject:

Re: Oconee Inspection on 2 pages 05/14/02 Public RDM Crack B-280 e-mail from Steve Long to Walt Rogers,

Subject:

2 pages 05/15/02 Public Re: Oconee Inspection on CRDM Crack e-mail from Steve Long to Gery Wilkowski, B-281 Wallace Norris,

Subject:

Q's FOR DAVIS-BESSE 2 pages 05/15/02 Public w/ attached NRC Staff Comments & Questions on Davis-Besse file B-282 e-mail from Steve Long to Jin Chung,

Subject:

2 pages 05/15102 Public Oconee Inspection on CRDM Crack e-mail from Steve Long to Edwin Hackett, B-283

Subject:

E-copy of SPSB needs for Davis-Besse 2 pages 05/21/02 Public Risk Assessment with attached risk info needs.wpd B-284 e-mail from Steve Long to Beth Wetzel,

Subject:

1 page 05/21/02 Public Collateral Damage Potential Issue e-mail from Steve Long to Allen Hiser,

Subject:

B-285 Re: COMMENTS ON MRP DRAFT PROPOSED 2 pages 05/21/02 Public INSPECTION PLAN with attached MRP Inspection Plan Cmnts.wpd B-286 email from Steve Long to Stephanie Coffin, 1 page 05/23/02 Public

Subject:

CRDM Flange Seal Design_______________

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Raenuested bv Conaressmen Tauzin & Gillmor Item No.

Record Title Est.

Date Disposition (note 1)

Volume (note 2) e-mail from Steve Long to Bassbr@ornl.gov, Edwin Hackett, Gery Wilkowski, Mark Kirk, B-287 Michael Johnson, Nilesh Chokshi, Wallace 2 ages 05123/02 Public Norris,

Subject:

RE: Mike Johnson just called and 2 g

anted to discuss support fortheir Davis-Besse ignificance determination e-mail from Steve Long to George Thomas, B-288

Subject:

Re: Fwd: Reminder-Meeting with Art 1 page 05/23/02 Public Howell at 1:30 p.m. today B-289 e-mail from Steve Long to Michael Johnson, 1 page 05/23/02 Public

Subject:

Re: Fwd: Two Davis-Besse Items e-mail from Steve Long to Christine Briggs, B-290

Subject:

Re: Mike Johnson just called and 1 page 05123102 Public wanted to discuss support for their Davis-Besse significance determination e-mail from Steve Long to George Thomas, B-291

Subject:

Reminder-Meeting with Art Howell at 1 page 05/23/02 Public 1:30 p.m. today e-mail from Christine Briggs to Edwin Hackett, Gery Wilkowski, Mark Kirk, Michael Johnson, B-293 Nilesh Chokshi, Richard Bass, Steven Long, 1 page 05/23/02 Public allace Norris, Yong Yi Wang,

Subject:

Bridge Line - number for Davis-Besse Meeting on Friday e-mail from Steve long to Sonia Burgess, B-294

Subject:

Fwd: LLTF REQUEST FOR REGIONAL 4 pages 05/23/02 Public PRESENTATION with 3 e-mails upplemental Information in Response to the C-020A November 28, 2001, Meeting Regarding the 51 pages 11/30/01 Public Davis-Besse Nuclear Power Station Response to NRC Bulletin 2001-01 C-039 E-mail from FirstEnergy to NRC - Pictures 3 pages 03/29/02 Public C-040 E-mail from M. Leisure re: Sample 3 pages 04/09/02 Public Characterization Phase 1 Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor l

Item No.

Record Title Volum Date

_Dipositio (note 1)

Datee(note 2)

Letter from G. Campbell to NRC, Supplemental C-041 Information in Response to NRC Bulletin 2001-109 10/17/01 Public 1, "Circumferential Cracking of Reactor pages Pressure Vessel Head Penetration Nozzles" E-mail drwuokko ©firstenergycorp.com (D.

C-043 Wuokko, First Energy) to S. Sands, NRR, Re:

1 page 10/01/01 Public Bulletin 2001-01 (1 page)

E-mail drwuokko @firstenergycorp.com (D.

C-044 uokko, First Energy) to S. Sands, NRR, Re:

1 page 10/01/01 Public Davis-Besse/NRC Conference Call Re: Bulletin 001-01 Response (1 page)

E-mail drwuokko firstenergycorp.com (D.

C-045 Wuokko, First Energy) to S. Sands, NRR, Re:

10/01/01 Public Davis-Besse/NRC Conference Call Re: Bulletin 2001-01 on Oct. 3 (1 page)

E-mail drwuokko@firstenergycorp.com (D.

C-046 Wuokko, First Energy) to S. Sands, NRR, et al.,

3 pages 10/03/01 Public Re: Agenda and Participants for 10/03/01 Conference Call (3 pages)

E-mail drwuokko~firstenergycorp.com (D.

C-047 Wuokko, First Energy) to S. Sands, NRR, Re:

1 page 012101 Public Finite Element Gap Analysis of Davis-Besse RDM Penetrations (1 page)

E-mail drwuokko~firstenergycorp.com (D.

C-048 Wuokko, First Energy) to spsl @nrc.gov (S.

3 pages 10/12/01 Public Sands, NRR), Re: Reactor Vessel Head Nozzle

& Weld Safety Assessment (3 pages)

E-mail drwuokko©firstenergycorp.com (D.

C-051 uokko, First Energy) to D. Pickett, NRR, Re:

4 pages 10/22/01 Public Participants and Agenda (4 pages)

C-054 Letter from Bergendahl to Dyer, Unit 1 Return to 41 pages 05/21/02 Public

[Service Plan C-055 Supplemental Information in Response to NRC 23 pages 05/15/02 Public Question 24 Letter from Bergendahl @ FENOC 10 CFR 50.55 C-056 request for alternative Relief Request 23 and 50 pages 04/25/02 Public 24 Listing of Records Concerning Vessel Head Degradation at Davis-Besse Reauested bv Conaressmen Tauzin & Gillmor Item No.

Record Title Est.

Date Disposition (note 1)

R Volume D

(note 2)

C-057 Partial Response to Confirmatory Action Letter 50 pages 04/25/02 Public C-059 Confirmatory Action Letter Response 3 pages 03/27/02 Public C-061 Ohio request to observe AIT 5 pages 03/12/02 Public C-062 Relief Request 20 38 pages 02/26/02 Public NRC Review of Licensing Action Requests for the C-063 Davis-Besse Nuclear Power Station Thirteenth 5 pages 12/18/01 Public Refueling Outage Transmittal of Davis-Besse Nuclear Power C-064 tation Risk Assessment of Control Rod Drive 18 pages 11/01/01 Public Mechanism Nozzle Cracks C-065 CRDM Weld Repair Process Qualification 5 pages 10/09/01 Public NRC Bulletin 2001-01: Circumferential Cracking D-045 of Reactor Pressure Vessel Head Penetration 16 pages 08/03/01 Public Nozzles NRC Bulletin 2002-01: Reactor Pressure Vessel D-046 Head Degradation and Reactor Coolant Pressure 12 pages 03/18/02 Public Boundary Integrity (0MB Control No.: 3150-012)

Preliminary Notification of Event or Unusual D-047 Occurrence - PNO-111-02-006B - Facility: Davis-2 pages 04/05/02 Public Besse/

Subject:

Reactor Vessel Head Degradation (Second Update)

NRC Information Notice: Through-Wall Circumferential Cracking of Reactor Pressure D-048 essel Head Control Rod Drive Mechanism 6 pages 04/30/01 Public Penetration Nozzles at Oconee Nuclear Station, Unit 3 Letter to Congressman Kucinich from Richard D-049 Meserve re: the reactor pressure vessel (R PV) 4 pages 04/30/02 Public head at the Davis-Besse Nuclear Power Station (DBNPS)

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor

[IemN.

Est.

Dae Disposition1 I(te 1)

Record Title Volume l a

le (note 2)

D-050 E-mail L. Burkhart, NRR, to am~ nei.org, et al.

6pae10901 Pbi Re: Bulletin 2001-01 Public Meetings on 10/24/01 6 pages 10/19/01 Public D-051 e-mail from Steve Long to David Lochbaum, 1 page 04/01/02 Public

Subject:

Re: Davis-Besse Backgrounder 1pg 40/2 Pbi D-052 Overview of Reactor Vessel Head Degradation 2 pages 05/15/02 Public NRC Press Release IV-02-002, NRC to Conduct D-053 ugmented Inspection of Davis-Besse Vessel 2 pages 03/12/02 Public Head D-054 PNO-111-02-006 - Significant Metal Loss Observed 1 page 03/08/02 Public in Reactor Vessel Head Letter from C. Lipa to H. Bergendahl, Davis-D-055 Besse Nuclear Power Station NRC Inspection 25 pages 03/08/02 Public Report 50-346/01-16 Letter from C. Lipa to H. Bergendahl, Annual D-056 Assessment Letter - Davis-Besse Nuclear Power 4 pages 03/04/02 Public Station (Report 50-346/2002-01)

D-057 Letter from A. Mendiola to H. Bergendahl, 6 pages 02/13/02 Public Inservice Inspection Relief Request 23 Letter from C. Lipa to H. Bergendahl, Davis-D-058 Besse Nuclear Power Station NRC Inspection 22 pages 01/18/02 Public Report 50-346/01-15 Davis-Besse Nuclear Power Station, Unit 1 -

Request for Additional Information (RAI)

Regarding the Relief Request From D-059 Requirements of the American Society of 8 pages 11/14/01 Public Mechanical Engineers (ASME) Code, Section Xi, or the Third 10-Year Inservice Inspection (ISI)

Interval (TAC No. MB1607)

D-060 Meeting Notice - Forthcoming Meeting with 2 pages 11/08/01 Public FirstEnergy Nuclear Operating Company Meeting Summary of October 24, 2001, to D-061 Discuss the Licensee's Response to Bulletin 23 pages 11/06/01 Public 001-01 D-062 Letter from W. Russell to W. Rasin, Safety 12 pages 11/19/93 Public Evaluation for Alloy 600 cracking issue 12 pages 11/1/93_ubli Listing of Records Concerning Vessel Head Degradation at Davis-Besse l

Requested by Congressmen Tauzin & Gillmor Item No.

Est.

l Disposition (note 1)

Record Title Volume Date (note 2)

E-013 Letter to Mr. J. R. Strosnider from C.S. Welty, Jr.

1 page 08/28/01 Public re: Release of EPRI MRP Information Tech Reviewer's Notes Regarding Operating E-023 History and attached Failure Time Evaluation 2 pages Unknown Public curve E-039 Commitments for Resolution of Reactor Pressure 2 pages 03/12/02 Public Vessel Head Material Degradation Issue E-041 Marked Up Copy of Reactor Vessel Head 30 pages 04/10/02 Public Presentation (1-01 W/ Staff Notes)

E-042 Commissioners TA Briefing Davis-Besse Reactor 8 pages 03/14/02 Public Vessel Head (staff notes on 1-09)

Slides - Overview of Bulletin 2001-01:

1-010 Circumferential Cracking for Reactor Pressure 65 pages 11/08/01 Public Vessel Head Penetration Nozzles Meeting Notice for meeting held 3/19/02 to 1-011 iscuss with NEI and EPRI/MRP the followup 39 pages 03/19/02 Public ction with regard to the Davis-Besse reactor vessel head degradation issue.

Slides - MRP Assessment of Generic Implications 1-012 f Davis-Besse RPV Head Corrosion (MRP-NRC 12 pages 03/19/02 Public Staff Meeting) 1-013 Reactor Pressure Vessel Head Degradation 169 05/29/02 Public pages__

1-014 Bases for Issuing Orders [S. Long, NRR, WP file 5 pages 09/20/01 Public

'LT brf slides"] (5 pages) 5pgs0//1 Pul 1-015 Slides for NRR Executive Team Meeting 9 pages 09/25/01 Public w/handwritten notes (9 pages)

Executive Director for Operations Brief, 1-016 Commissioners' Technical Assistants Brief 7 pages 10/02/01 Public 10/03/01 (7 pages) 1-017 Commissioners Technical Assistants Brief (14 14 pages 10/03/01 Public

_ pages) 1-018 Committee to Review Generic Requirements 8 pages 10/11/01 Public 1-019 (CRGR) brief (8 pages) 2001 (3 pae) aes1/

1/

1-019 Director, NRR, Brief November 2001 (3 pages) 3 pages 111/01/02 1 Public Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

Record Title Est.

Date Disposition (note 1)

Volume (note 2) 1-021 Reactor Pressure Vessel Head Degradation 54 pages 04/09/02 Public 1-022 Repair Process, Nozzle 3 and Area Adjacent 4 pages 03/28/02 Public 1-023 MRP Alloy 600/82/182 Status Update 60 pages 11/27/01 Public 1-024 racking of Reactor Pressure Vessel Head 34 pages Unknown Public Penetration Nozzles 1-025 Davis-Besse 13 RFO Head Inspection Meeting 13 pages Unknown Public Handouts K-001 Press Release-Committee to Examine Problems 2 pages 05/16/02 Public at Davis-Besse Nuclear Power Plant A-006A Davis-Besse IMC 0350 Oversight Panel Charter 2 pages 04/29/02 Non-public and Process Plan (Draft of A-006)

Predecisional A-006B Davis-Besse Manual Chapter 0350 Panel Charter 5 pages Unknown Non-public

____(DRAFT)

_____Predecisional A-006C Draft Memo from Grobe to Dyer Re: Davis-Besse Non-public Manual Chapter 0350 Panel Charter 2 pages Predecisional A-006D JCDraft NRC Inspection Manual Chapter 0350 3 pages Unknown Non-public Charter Predecisional DRAFT Request for Technical Assistance - Risk N

A-007A Assessment of the Davis-Besse Reactor Head 2 pages Unknown on-pubionli A-007A_ Degradation (TIA 2002-_)

Predecisional DRAFT, Memo from J. Dyer, Augmented Non-public A-017A Inspection Team Charter-Davis-Besse Reactor 2 pages 03/12/02 Predecisional essel Head Material Loss Note to Commissioner Assistants from John Craig re: Status of Dialogue Between NRC and Non-public A-036 Licensees Regarding Circumferential Cracking of 5 pages 10/31/01 Predecisional Reactor Pressure Vessel Head Penetration Nozzles Status Report - Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles - Plants with Refueling N

A-038 Outages Spring 2002/Meeting planned with 11 pages 02/15/02 on-public industry, NEI, EPRI and MRP on 2/20 and 2/21 to iscuss Status of CRDM Issue and Fracture Mechanics Methodologies Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

Record Title Est.

Date Disposition (note 1)

R Volume (note 2)

Status Report - Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles - Plants with Refueling A-039 Outages Spring 2002/Circumferential Cracking of 14 ages 02/22/02 Non-public RPV Head Penetration Nozzles is on the Agenda pagsPredecisional or Next Weeks Regulatory Information Conference. The Session is scheduled for 8:00 m Wednesday, March 6.

A-041 Note to Commissioner Assistants from John W.

6 pages 03/25/02 Non-public Craig re: Davis-Besse Reactor Vessel Head Predecisional Status Report - Bulletin 2002-01, Reactor Non-public A-042 Pressure Vessel Head Degradation and Reactor 2 pages 04/05/02 Predecisional Coolant Pressure Boundary Integrity A 044 WITS Input Form - White Paper re: Davis-Besse 2

05/07/02 Non-public Midland Head Replacement pages Predecisional A-045 Task Basis Number 200202002 - White Paper re: 5 pages 05/09/02 Non-public Davis-Besse Midland Head Replacement Predecisional Memorandum to Anthony Mendiola from Jon Non-public A-050 Hopkins re: Davis-Besse Nuclear Power Station - 3 pages 06/04/02 Predecisional Reactor Vessel Head Replacement Status Report - Bulletin 2001-01, Circumferential A-051 Cracking of Reactor Pressure Vessel Head 9 pages 06/07/02 Non-public Penetration Nozzles - Plants with Refueling Predecisional Outages Spring 2002 Draft memo S. Sands, NRR, to File, Re: Davis-Non-public A-052 Besse Receipt of draft letter identifying 8 pages Unknown Predecisional commitments A-053 Draft inserts "On August 3,2001, the staff issued 2 pages Unknown Non-public Bulletin 2001 -01.."

Predecisional Draft Re: Status of the staff's review of Non-public A-054 FirstEnergy Nuclear Operating Company's 2 pages Unknown Predecisional (FENOC'S) bulletin 2001-01 response Draft NRC orders Davis-Besse to shut down by Non-public A-055 December 31 to perform reactor vessel head 2 pages Unknown Predecisional penetration nozzle inspections Listing of Records Concerning Vessel Head Degradation at Davis-Besse Reniaueted bv Conaressmen Tauzin & Gillmor Ace.a-___I_-_------J..

Item No.

ReodTteEst.

Date Disposition (note RecordTitle Volume (note 2)

A Draft inserts "NRC staff has completed its review 1 page Unknown Non-public o-056 f licensee response to Bulletin 2001-01 1 page Unknown"Predecisional Draft Davis-Besse Bulletin 2001-01, "

A 057 Circumferential Cracking of Reactor Pressure 2 pages Unknown Non-public Vessel Head Penetration nozzles," Response Predecisional and Staff Interaction with the Licensee Outline for phone calls with licensees for: Davis-Non-public A-058 Besse, H.B. Robinson, North Anna Unit 2 & Surry 2 pages Unknown Predecisional Unit 2 A-059 Current status of high susceptibility plants that 3 pages Unknown Prdecisional may receive orders re A-060 NRR Notification of Significant Licensing Action 3 pages Unknownredecisional A-061 Draft graphs for flaw curves and stress intensity 3 pages Unknown Non-public factors Predlecisional A-062 Curve for Davis-Besse Conditions 1 page Unknown Non-public Predecisional A-063 Memo W. Jensen, NRR, to S. Dinsmore, NRR, 4 pages 08/01/01 Non-public Re: CRDM Thimble Rupture Sensitivity Study Predecisional A-064 Resource Estimates for VHP Bulletin Response 2 pages 08/01/01 Non-public Review & Additional Supports Predecisional Memo J. Strosnider, NRR, & M. Mayfield, RES, to A-065 S. Collins, NRR, Re: Results of Independent 10 pages 09/07/01 Non-public Evaluation of Recent Reactor Vessel Head Predecisional Penetration Cracking (10 pages)

White Paper-Policy for Issuance of Orders to Utilities Licensed to Operate Nuclear Power 12 ages 09/10/01 Non-public A-066 Generation Facilities [S. Long, NRR, WP file 1

g Predecisional "NRC Policy for Issuing Orders R6] (12 pages)

A-067 Plants with Cracking/Leaking history (BIN 1) and 2pages 10/10/01 Non-public A-067 high susceptibility plants (BIN 2) (2 pages) 2 pages Predecisional A-068Draft RAI on Davis-Besse Response to the 2 pages 10/12N01 Non-public A-6 ulletin (2 pages) 2 ae 01/1Predlecisional AO Plants with Cracking/Leaking history (BIN 1) and 2 pages 10/15/01 Non-public high susceptibility plants (BIN 2) (2 pages)

Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

Record Title Est.

Date Disposition (note 1)

Volume (note 2)

E-mail from J. Zimmerman to S. Rosenberg Draft Paper, Re: Davis-Besse Bulletin 2001-01, Non-public A-070

'Circumferential Cracking of Reactor Pressure 2 pages 10/16/01 Predecisional essel Head Penetration Nozzles," Response nd Staff Interaction with the Licensee (2 pages)

A-071 Plants with Cracking/Leaking history (BIN 1) and 2 pages 10/17/01 Non-public high susceptibility plants (BIN 2) (2 pages)

Predecisional A-072 Plants with Cracking/Leaking history (BIN 1) and 3 pages 10/18/01 Non-public high susceptibility plants (BIN 2) (3 pages)

Predecisional A-073 Plants with Cracking/Leaking history (BIN 1) and 3 pages 10/22/01 Non-public high susceptibility plants (BIN 2) (3 pages)

Predecisional Memo to J. Zimmerman, NRR, to NRR Project A-074 Directors, Re: Completion of staff reviews of 7 pages 10/26/01 Non-public elected moderate low susceptibility ranked plant Predecisional responses to bulletin 2001-01 (7 pages)

A 075 Plants with Cracking/Leaking history (BIN 1) and 2 ages 11105/01 Non-public high susceptibility plants (BIN 2) (2 pages) 2 p Predecisional A-076 Davis-Besse IMC 0350 Panel Process Plan 7 pages 06/06/02 Non-public Predecisional Region IlI's Draft Responses to Selected 100 Non-public A-077 Questions from Reps. Markey and Kaptur (with pages 05/24/02 Predecisional attachments) p (in part)

Minutes of Internal Meeting of the Davis-Besse Non-public A-078 Nuclear Power Station IMC 0350 Panel (held on 4 pages 05/23/02 Predecisional May 14, 2002)

A-079 Inspection Plan Davis-Besse Boric Acid Extent of 3 pages 05/23/02 Non-public Condition Inspection Report # 50-346/02-009 Predecisional A-080 Inspection Plan Davis-Besse Follow Up 2 ages 05/23/02 Non-public Inspection Report # 50-346/02-08 pagsPredecisional A-081 DRAFT, Inspection Plan, Davis-Besse Follow-Up 1 page 05/23/02 Non-public Inspection, 50-346/02-08 Predecisional Minutes of Internal Meeting of the Davis-Besse Non-public A-082 Nuclear Power Station IMC 0350 Panel (held on 4 pages 05/21/02 Predecisional May 6, 2002)

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition

( e Volume Date (note 2)

DRAFT, Memo from J. Grobe, Special Inspection Non-public A-083 Charter - Davis-Besse Reactor Vessel Head 1 page 05/14/02 Predecisional Material Loss D-84 avis-Besse CRDM Nozzle Integrated 2 ae 51/2 Non-public A-084 2 s J

pages 05/13/02 Predecisional Investigation Status Summary rdcsoa A-085 EDO Bullets - 5/10/02 2 pages 05/10/02 Non-pubPis Davis-Besse Reactor Vessel Head Degradation 4 pages 05102102 Non-public A-088 Lessons-Learned Task Force Document Request Predecisional Minutes of Internal Meeting of the Davis-Besse Non-public A-089 Nuclear Power Station IMC 0350 Panel (held on 4 pages 05/02/02 Predecisional pril 30, 2002)

A-090 Davis-Besse CRDM Nozzle Integrated 1 page 05/01/02 N

Non-public Investigation Status SummaryPrdcsoa A-091 Davis-Besse IMC 0350 Oversight Panel 3 pages 04/29/02 Predecisional A-092 Request for Additional Information Regarding the 4 pages 04/25/02 Non-public Degraded Reactor Vessel Head at Davis-Besse rdcsoa A-093 EDO Bullets - 4/19/02 2 pages 04/19/02 Non-public Predecisional A-094 Draft Communication Plan Davis-Besse MC 0350 8 pages 04/17/02 Non-public ctivities Predecisional A-094A Davis-Besse Manual Chapter 0350 Panel 4 pages Unknown Non-public ominunication Plan (DRAFT)

Predecisional A-095 Davis-Besse NRC AIT 02-03 (draft) 40 pages 03/25/02 Non-public Predecisional A-096 SDP Phase 1 screening Worksheet for IR, MS 3 pages 03/18/02 Non-public nd B Cornerstones Predecisional A-097 DRAFT, Inspection Plan, Davis-Besse Special 4 pages 03/11/02 Non-public Inspection, Inspection Report 50-346-02-03 Predecisional A-098 DRAFT, Memo from J. Jacobson, Special Inspection Charter for Davis-Besse Reactor 2 pages 0i3/ 1/uZ Non-public Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

Record Title Est.

Date Disposition 1 (note 1)

Volume (note 2)

Vessel Head Cavity Discovered on March 6, 2002 A-099 Event Report Worksheet # 38757 2 pages 03/08/02 Non-public Predecisional A-100 Event Report No. 38732 2 pages 02/27/02 Non-public EPredecisional Inspection Plan Davis-Besse Inservice Inspection Non-public A-101 Activities (biennial review) Inspection Report #

5 pages 01/08/02 Predecisional 50/346-2001016(DRP) Prep Activities Only Status Report: NRC Bulletin 2001-01:

A-102 Circumferential Cracking of Reactor Pressure 9 pages Unknown Predecisional Vessel Head Penetration Nozzles (Non Identical)

A-103 Table 1 Categories of Initiating Events for Davis-6 pages 11/28/00 Non-public Besse Unit 1 Predecisional Baseline Inspection Plan Davis-Besse Safety Non-public A-104 System Design and Performance Capability 9 pages 06/27/00 Predecisional Inspection Report # 50-346-2000-007 (DRS)

A-105 Inspection Planner Davis-Besse 346-2000008 1 page 06/03/00 Non-public Predecisional A-106 Pressurizer spray valve RC-2 Information 32 pages 05/24/98 Non-public Predecisional A-1 07 Internal Status Reports on Bulletin Responses 88 pages 11/16/01 Non-public (from 11/16/01 thru 5/24/02)

Predecisional A-108 8:15 News Minutes 17 pages 02/26/02 Non-public Predecisional A-109 Davis-Besse Plant Performance Summary 4 pages Unknown Predecisional Draft Memo from J. Grobe to J Jacobson and C.

A-110 Lipa Re: Davis-Besse Vessel Head Material Loss 2 pages Unknown Predecisional Follow Up Inspections A-i111 Draft Inspection Plan Davis-Besse Special S pages Unknown Non-public Inspection 50-346/02-007 Predecisional A-111A raft Inspection Plan Davis-Besse Special 7 pages Unknown Non-public Inspection 50-346/02-007 Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Date Disposition (note 1)

Volume (note 2)

A111B Inspection Plan Special Inspection 50-346/02-007 8 pages Unknown Non-public A-i 11

  • Predecisional A-112 Planned Outline for Tuesday, May 7, 2002 NRC 1 page Unknown Non-public FirstEnergy Root cause Analysis Report Meeting Predecisional Draft Memo from Matthews to Eltawila Re:

A-113 Proposed Abnormal Occurrences and "Other 4 pages Unknown Non-public Events of Interest" for the Second Quarter of Predecisional Fiscal Year 2002 Draft Memo from Matthews to Eltawila Re:

A-i 3A Proposed Abnormal Occurrences and "Other 6 pages Unknown Non-public Events of Interest" for the Second Quarter of Predecisional Fiscal Year 2002 A-i 1 3B Proposed Abnormal Occurrence for the Second 2 pages Unknown Non-public Quarter FY 2002 Predecisional A-114 Draft Inspection Plan Davis-Besse Special 2 pages Unknown Non-public Inspection Report #50-346/02-08 Predecisional Draft Memo from Grobe to Jacobson and Lipa Non-public A-115 Re: Special Inspection Charter Davis-Besse 2 pages Unknown Predecisional Vessel Head Material Loss Draft Memo from Grobe to Jacobson and Lipa Non-publi A-1 15A Re: Special Inspection Charter Davis-Besse 2 pages Unknown Predecisional essel Head Material Loss (revision)

Draft Memo from Grobe to Jacobson and Lipa Non-public A-1 15B Re: Special Inspection Charter Davis-Besse 2 pages Unknown Predecisional Vessel Head Material Loss (revision 1)

A-1 6 Davis-Besse 0350 Panel Agenda for 1st Internal 1 page Unknown Non-public Meetings rdcsoa Unknown Non-public A-117 Davis-Besse DRS input (draft) 14 pages Unknown Predecisional A-ii8edNon-publi A-118 Inspection Davis-Besse Licensed Operator 11 pages 10/10/00 Non-public equalification Program 2Predecisonal A-119 Status Report 6 pages 04/18/02 Non-public Predlecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note1)

Record Title Volume Date (note 2)

A-120 Communication Plan Significant Metal Loss 17 pages 03/28/02 Non-public Observed in Reactor Vessel Head Predecisional A-122 Davis-Besse Reactor Vessel Head (talking points 1 page 03/14/02 Non-public for TA briefing on 3/14/02)

Predecisional A-123 Memo to C.S.Thomas, from D.Simpkins Re:

3 pages 12/04/01 Non-public Davis-Besse Outage dates moved Predecisional Non-public A-124 Head Repair Schedule 3 pages Unknown Predecisional Non-pubionli A-125 Nozzle #3 Cavity Formation Theory 2 pages Unknown Non-public Predecisional E-mail from Lawrence Burkhart FWD: Risk Word 5 11/07/01 Non-public B-002c mods for Latest Davis-Besse Order pages Predecisional B03E-mail from Lawrence Chandler re: EDO Staff 2 ae 11/1 Non-public B-003 Comments on Orders 2 pages 11/19/01 Predecisional B-003a E-mail from Mitzi Young re: EDO Staff Comments 2 pages 11/19/01 Non-public on Orders Predecisional B-005 E-mail from Mitzi Young re: Bulletin 2001-01 ET 10 pages 09/25/01 Non-public Briefing Slides Rescheduled Predecisional B-007 E-mail from Jacob Zimmerman re: Daily Status 8 pages 11/16/01 Non-public Report on Bulletin 2001-01 Predecisional B-008 E-mail from Lawrence Burkhart re: Daily Status 9 pages 11/19/01 Non-public Report - DSR (email only)

Predecisional B-009 E-mail from Allen Hiser re: EDO Staff Comments 2 pages 11/19/01 Non-public on Orders Predecisional B-010 E-mail from Lawrence Burkhart re: Daily Status 10 pages 11/20/01 Non-public Report for 1 1/20/01 Predecisional B-Oil E-mail from Lawrence Burkhart re: Daily Status 10 ages 11/21/01 Non-public B-11Report for Wednesday 11/21/01 1pae11201Predecisional B-012 E-mail from Lawrence Burkhart re: Daily Status 10 pages 11/27/01 Non-public Report for 11/27/01 (Bulletin 2001- 01 Issues)

Predecisional B-013 E-mail from Lawrence Chandler re: Davis-Besse 1 page 11/29/01 Non-public Mtg Postponed til 1 p.m. due to fog I

9 Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Reauested bv Conaressmen Tauzin & Gillmor Item No.

Est.

Disposition (note 1)

Record Title Volume Date (note 2) ma B-014 E-mail from Jacob Zimmerman re: Bulletin 2001-9 pages 11/30/01 Non-public 01 Status Report

_____Predecisional B-015 E-mail from Jacob Zimmerman re: Bulletin 2001-9 pages 12/07/01 Non-public 01 Status Report Predecisional B-01 6 E-mail from Jacob Zimmerman re: Bulletin 2001 -

9 pages 12/14/01 N on-public 01 Status Report Predecisional B-017 E-mail from Jacob Zimmerman re: Bulletin 2001- -

5 paged 01/10/02 Non-public 1 Status Report Predecisional B-018 E-mail from Jacob Zimmerman re: Bulletin 2001-11 pages 01/25/02 Non-public 1 Status Report Predecisional B-01 E-mail from Beth Wetzel re: Bulletin 2001 10 pages 0/0102 Non-public B09Status Update 1pae021/2Predecisional B-024 E-mail from Beth Wetzel re: Weekly CRDM 1 page 02113102 Non-public B20Status Report 1pae028/2Predecisional B-024 E-mail from Beth Wetzel re: Weekly CRDM 16 pages 0311302 Non-public B-024C 15s omncainPa pages 03/08/02 Non-publisc Status Update Predecisional B-024A E-mail from Lawrence Chandler re: Fwd: Davis-1 page 03/13/02 Non-public Besse Communication Plan Predecisional B-024B E-mail from Lawrence Chandler re: Fwd: Davis-16 pages 03/13/02 Non-public Besse Communication Plan Predecisional B-2CE-mail from Lawrence Chandler re: Fwd: Davis-2 ae 31/2 Non-public B-024C

]S_

es 2 pages 03/14/02 Predecisional Besse Communication Plan Predecisional B-024D E-mail from Lawrence Chandler re: Fwd: Davis-16 pages 03/14/02 Non-public Besse Communication Plan Predecisional B-024E E-mail from Lawrence Chandler re: Fwd: Davis-2 pages 03/14/02 Non-public Besse Communication Plan Predecisional B-024F E-mail from Lawrence Chandler re: Fwd: Davis-2 pages 03/14/02 Non-public Besse Communication Plan Predecisional B-024H E-mail from Brian Sheron re: Fwd: Davis-Besse 2 pages 03/14/02 Non-public Communication Plan Predecisional B-025 E-mail from Joseph Gray re: Fwd: March 14 Sr 3 pages 03/14/02 Non-public PO___Stf Summary

________Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse l____

Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Date Disposition (note 1)

Volume (note 2)

B-028 E-mail from Steven Crockett re: Urgent Bulletin 2 pages 03/14/02 Non-public on Davis-Besse Predecisional B-029 E-mail from Joseph Gray re: March 14 Sr Staff 3 pages 03/14/02 Non-public B-ummapges031402Predecisional B04E-mail from Kenneth Karwoski re: Draft Bulletin 22 pages 03/15/02 Predecisbona B-034 on RPV Head Degradation Predecisional B05E-mail from Steven Crockett re: Draft Bulletin on 2pae031/2 Non-public B-035 RPV Head Degradation m22pages 03/15/02 Predecisional B-036 E-mail from Beth Wetzel re: Status Report 15 pages 03/15/02 Predecisional B-042 E-mail from Douglas Pickett re: Latest Davis-1 page 03/27/02 Non-public Besse Communication Plans Predecisional B-04 E-mail from Dennis Dambly re: Latest Davis-N p

pagec 03/28/02 Non-public Besse Communications Plan rdcsoa B-044 From Douglas Pickett re: Davis-Besse 1 page 03/28/02 Non-public Communications Plan 1 page Predecisional B-045 E-mail from Beth Wetzel re: CRDM Status 16 pages 03/29/02 Non-public

-045 1e pages 03/29/02 Predecisional B-047 JE-mail from Steven Bloom re: Bulletin 2002-01 N

pages 03/29/02 Non-public 8-047 3hrceiaio hs pages 03/29/02 Predecisional Status Report rdcsoa B-062 E-mail from L. Chandler re: Bulletin 2002- 01 pages 04/1/02 Non-public Status Report rdcsoa B-063 E-mail from Lawrence Chandler re: Davis-Besse 4 pages 04/04/02 Non-public

-04 uestion of Quarantine 4 ae 40/2Predecisional 8-055 E-mail from Beth Wetzel re: Bulletin 2001 -01 8 pages 04/05/02 Non-public Status Report Predecisional E-mail from Steven Bloom re: Reactor Vessel Non-public B-056 ead Degradation Status Report pages 04/05/02 Predecisional 8-057 JE-mail from D. Pickett re: Sample 1 page 04/09/02 No-ubi Characterization Phase 1 rdcsoa B02E-mail from Beth Wetzel re: Weekly Bulletin 8 ae 41/2 Non-public 802 001-01 Status Report 8 ae 41/2Predecisional E-mail from Steven Bloom re: Reactor Vessel Non-public 8-063 edDgaainSauReot5 pages 04/12/02 Predecisional E-mail from Steven Bloom re: Reactor Vessel 5 ae 41/2 Non-public Head Degradation Status Report I_____re_____is________

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note1 Record Title Volume Date (note 2)

B-066 E-mail from Beth Wetzel re: Weekly Bulletin 8 pages 04119/02 Non-public 2001 -01 Status Report Update Predecisional B-069 E-mail from Steven Bloom re: Reactor Vessel 9 pages 04/26/02 Non-public Head Degradation Status Report Predecisional B-071 E-mail from Joseph Gray re: Davis-Besse 2 pages 05/01/02 Non-public B-071 E-mail from Joseph Gray re: Davis-Besse 2 pages 05/01/02 Predecisional B-072 E-mail from Joseph Gray re: Davis-Besse 2 pages 05/02/02 Non-public

_______ Status Update 8pagesPredecisional E-mail from Trip Rothschild re: Davis-Besse 1

05/03/02 Non-public B-073Head Exgrt Sport page Predecisional B-074 E-mail from Beth Wetzel re: Bulletin 2001 -01 8 pages 05/0/02 Non-public Status Update

_________Predecisional B075 E-mail from Steven Bloom re: Reactor Vessel 5 pages 05/03/02 Non-public Head Degradation Status Report Predecisional B09E-mail from Beth Wetzel re: Bulletin 2001-01 8 ae 5112 Non-public B-079 8-alfo aieMoer:DvsBseMm pages 05/10/02 Predecisional Status Update rdcsoa E-mail from Steven Bloom re: Reactor Vessel 5

es 0510/02 Non-public

-084 Head Degradation Status Report pages0 00 Predecisional B-081 E-mail from Janice Moore re: Davis-Besse Memo 1 page 05/13/02 Non-public Penetrao CPredecisional E-mail from Steven Bloom re: Reactor Vessel Non-public B-084 Head Degradation Status Report 4 pages 05/16/02 Predecisional B-087 E-mail from Beth Wetzel re: Bulletin 2001 -01 8 pages 05/17/02 Non-public Status Update portP_9 Predecisional B-1 04 E-mail from James Lieberman re: State of Ohio 1 page 05/23/02 Prodecisiona B-lOS5 E-mail from James Lieberman re: State of Ohio 4 pages 05/23/02 Non-public Predecisional B-107 E-mail from Michael Marshall re: Vessel Head 9 pages 05/24/02 Non-public Penetration Cracking Weekly Status Report Predecisional E-mail from Steven Bloom re: Reactor Vessel 7

es 05/24/02 Non-public B-108Head Degradation Status Report pag Predecisional B-1 09 E-mail from Michael Marshall re: Vessel Head 9 pages 05/31/02 Non-public Penetration Cracking Weekly Status Report

____Predecisional B-i110 E-mail from Steven Bloom re: Reactor Vessel 7 pages 05/31/02 Non-public Head Degradation Status Report Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Date Disposition (note 1)

Record TitlVolume (note 2)

B-114 E-mail from Steven Bloom re: Reactor Vessel 6 pages 06/07/02 Non-public Head Degradation Status Report Predecisional B-1 E-mail from Michael Marshall Re: Vessel Head 10 ages 06/07/02 Non-public Penetration Cracking Weekly Status Report pg Predecisional E-mail W. Shack, Argonne National Lab, to C.

Non-public B-116 Nilesh, E. Hackett, & W. Norris, RES, Re: CRDM 13 pages 08/27/01 Predecisional Probabilistic Analysis E-mail J. Zimmerman, NRR, to PWR PMs &

Non-public B-117 Management, Re: Bulletin 2001-01 Project 20 pages 08/31/01 Predecisional Manager Guidance E-mail from M. Kotzalas, NRR, to A. Heiser, Non-publi B-118 NRR, et. al., Re: Staff Comments on Davis-3 pages 09/12/01 Predecisional Besse Bulletin Response (3 pages)

B-119 E-mail from 1. Jung, NRR, to A. Heiser, NRR, et.

2 pages 09/12/01 N on-public al., Re: Table (2 pages)

Predecisional B-120 E-mail from 1. Jung, NRR, to A. Heiser, NRR, et.

2 pages 09/13/01 Non-public al., Re: Modified Table (2 pages)

Predecisional E-mail from A. Hiser, NRR to CRDM Reviewers, Non-public B-121 Re: Summary of staff review of bulletin 5 pages 09/18/01 Predecisional responses (5 pages)

E-mail from J. Zimmerman, NRR, to R. Barrett, Non-public B-122 NRR, et. al., Re: Draft Slides for 9/25/01 ET 11 pages 09/24/01 Predecisional Briefing on Bulletin 2001-01 (11 pages)

E-mail S. Long, NRR, to J. Chung, NRR, Re:

Non-public B-123 dequate Protection insert for Medoff's CRDM 3 pages 09/27/01 Predecisional White Paper (3 pages)

E-mail F. Reinhart, NRR, to B. Bateman, J.

Non-public B-124 Medoff, NRR, Re: Forwarding of Pre-decisional, 2 pages 10/02/01 Predecisional Draft orders to Brian Sheron for review (2 pages)

B-1 25 E-mail A. Hiser, NRR, to B. Bateman, NRR, Re:

1 page 10111/01 Non-public Observed CRDM Cracking (1 page)

Predecisional 12 E-mail A. Hiser, NRR, to B. Bateman, et al., Re:

1 age 10112/01 Non-public Relevant CRDM Numbers (1 page) 1 p Predecisional B-127 E-mail from L. Burkhart, NRR, to S. Rosenberg, 4 pages 10/15/01 Non-public EDO, Re: Fwd: CRDMs (4 pages)

Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note 1)

Record Title Volume Date (note 2)

E-mail J. Strosnider, NRR, to L. Burkhart, NRR, Non-public B-128 Re: Revised Response to EDO Questions (3 3 pages 10/15/01 Predecisional 1pages)

B-129 E-mail L. Burkhart, NRR, to B. Sheron, NRR, Re: 6 pages 10N15/01 Predec Answers to EDO Questions (6 pages)

Predecisional B-130 E-mail L. Burkhart, NRR, to B. Sheron, NRR, Re:

1 page 10/15/01 Non-public Initiating Event Frequencies (1 page)

Predecisional E-mail A. Hiser, NRR, to M. Reinhart, NRR, Re:

Non-public B-131 Fwd: Finite Element Gap Analysis of Davis-Besse 1 page 10/15/01 Predecisional CRDM Penetrations (1 page)

E-mail D. Pickett, NRR, to A. Hiser, B. Bateman, B-132 t al., NRR, RE: Fwd: Finite Element Gap 1 page 10/15/01 Non-public nalysis of Davis-Besse CRDM Penetrations (1 Predecisional age)

E-mail D. Pickett, NRR, to A. Hiser, B. Bateman, Non-public B-133 t al., Re: Fwd: Crack Growth Rate Calculations 1 page 10/15/01 Predecisional (1 page)

E-mail A. Hiser, NRR, to M. Reinhart, NRR, Re:

Non-public B-134 Fwd: Reactor Vessel Head Nozzle & Weld Safety 1 page 10/15/01 Predecisional ssessment (1 page)

E-mail D. Pickett, NRR, to A. Hiser, B. Bateman, Non-public B-135 et al., NRR, Re: Fwd: Reactor Vessel Head 1 page 10/15/01 Predecisional Nozzle & Weld Safety Assessment (1 page)

E-mail F. Reinhart, NRR, to 1. Jung, J. Chung, S.

Non-public B-136 Long, NRR, Re: Fwd: Reactor Vessel Head 1 page 10/16/01 Predecisional Nozzle & Weld Safety Assessment (1 page)

E-mail F. Reinhart, NRR, to 1. Jung, J. Chung, S.

Long, NRR, Re: Fwd: Finite Element Gap 1 page 10/16/01 Non-public Analysis of Davis-Besse CRDM Penetrations (1 Predecisional page)

B-8E-mail A. Hiser, NRR, to A. Lee, et al., Re:

1pg 10701 Non-public Davis-Besse Report (1 page)

Predecisional B-139 E-mail F. Reinhart, NRR, to A. Hiser, NRR, Re:

1 page 10/17/01 Non-public B-3 Als for Davis-Besse (1 page) 1 Iag 10170 Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Reraueted bv Conaressmen Tauzin & Gillmor Item No.

ReodTteEst.

Date Disposition (note 1)

Volume (note 2)

B-140 E-mail A. Hiser, NRR, to A. Lee, NRR, et al., Re:

7 pages 10/18/01 Non-public

- RDM Scorecard (7 pages)

Predecisional B-141 E-mail D. Pickett, NRR, to A. Hiser, NRR, et al.,

1 page 10/18/01 Non-public Re: Docketed Responses Here (1 page)

Predecisional B-1442 E-mail L. Burkhart, NRR, to R. Croteau, OCM, et 3 pages 10/18/01 Non-public aI., Re: Bulletin 2001 -01 Tables (3 pages)

Predecisional E-mail J. Strosnider, NRR, to B. Bateman, NRR, Non-public B-143 et al., Re: Request from EDO on Bulletin 2001-01 1 page 10/18/01 Predecisional (1 page)

E-mail A. Hiser, NRR to J. Chung, NRR, Re:

1 10/18/01 Non-public B-144 Davis-Besse RAIs (1 page) page Predecisional E-mail F. Reinhart, NRR, to 1. Jung, J. Chung, S.

Non-public B-145 Long, NRR, Re: Fwd: Davis-Besse Questions (1 1 page 10/18/01 Predecisional page)

E-mail A. Hiser, NRR, to S. Long, NRR, Re:

Non-public B-146 Davis-Besse Questions (1 page) 1 page 10/18/01 Predecisional B17E-mail J. Chung, NRR, to A. Hiser, NRR, Re: RAI!

ae1/80 Non-public B-147 or Davis-Besse (1 page) 1 page 10/18/01 Preecisional E-mail John Zwolinski, NRR, to A. Hiser, NRR, et al., Re: Fwd: Crack Growth Rate Calculations 3

10/19/01 Non-public B-148

/att 10/19/01 e-mail D. Wuokko, First Energy, to pages Predecisional D. Pickett, NRR (3 pages)

E-mail L. Burkhart, NRR, to A. Hiser, NRR, et al.,

Non-public B-149 Re: Non-public Predecisional Meetings with 1 page 10/19/01 Predecisional Davis-Besse and Robinson (1 page)

E-mail L. Burkhart, NRR, to D. Pickett, NRR, et 1 page 10/19/01 Non-public al., Re: Meetings Next Week (1 page)

Predecisional E-mail J. Zimmerman, NRR, to L. Burkhart, NRR, 1 10/19/01 Non-public B-151 Re: Bulletin 2001-01 (1 page) page Predecisional E-mail A. Hiser, NRR, to J. Chung, NRR, Re:

1 age 10/19/01 Non-public B-152 Davis-Besse RAls (1 page) 1 p Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note Record Title Volume Date (note 2)

E-mail B. Bateman, NRR, to L. Burkhart, NRR, Non-public B-153 Re: Fwd: Re: Request from EDO on Bulletin 1 page 10/22/01 Predecisional 2001-01 (1 page)

B-154 E-mail L. Burkhart, NRR, to J. Strosnider, NRR, 1 page 10/22/01 Non-public et al., Re: Bulletin 2001-01 (1 page)

Predecisional B-155 E-mail L. Burkhart, NRR, to D. Loveless, RGN-IV, 1 page 10/22/01 Non-public Re: Bulletin 2001-01 (1 page)

Predecisional B-156 E-mail D. Pickett, NRR, to A. Hiser, NRR, et al.,

1 page 10/23/01 Non-public Re: Fwd: Participants and Agenda (1 page)

Predecisional B-157 E-mail D. Pickett, NRR, to A. Hiser, et al., NRR, 1 page 10/23/01 Non-public Re: Fwd: Proprietary Documents (1 page)

Predecisional B18E-mail J. Zwolinski, NRR, to L. Burkhart, NRR, 1pg 102/1 Non-public B-158 Re: Products Needed (1 page) 1 page 10/24/01 Predecisional B-159 E-mail from A. Hiser, NRR, to A. Lee, NRR, et.

4 pages 10/25/01 Non-public al., Re: Fwd: products needed (4 pages)

Predecisional B-1 60 E-mail D. Pickett, NRR, to L. Burkhart, NRR, et 1 page 10/25/01 Non-public Il., Re: Info (1 page)

Predecisional E-mail D. Pickett, NRR, to L. Burkhart, NRR, et 1 page 10/25101 Non-public B-161 al., Re: RAI Request (1 page)

Predecisional E-mail J. Zwolinski, NRR, to L. Burkhart, NRR, Non-public B-162 Re: Fwd: Re: CRDM Summary (1 page) 1 page 10/26/01 Predecisional E-mail J. Zimmerman, NRR, to S. Rosenberg, Non-public B-163 EDO, Re: Status of Bulletin 2001-01 Issues (5 5 pages 10/30101 Predecisional pages)

B-164 E-mail D. Pickett, NRR, to L. Burkhart, NRR, Re:

1 page 10/30/01 Non-public Draft Orders (1 page)

Predecisional E-mail G. Edison, NRR, to L. Burkhart, NRR, Re:

Non-public B-1 65 Draft Orders (1 page) 1 page 10/30/01 Predecisional E-mail J. Zwolinski, NRR, to L. Burkhart, NRR, 1 page 10/30/01 Non-public B-166 Re: Draft Orders (1 page)

Predecisional E-mail J. Zimmerman, NRR, to L. Burkhart, NRR, et al., Re: Davis-Besse Responses to RAI, 1 page 10/31/01 Non-public B-167 Results of Rx Vessel CRDM Visual Exam, etc. (1 Predecisional page)

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note 1)

Volume (n

E-mail J. Strosnider, NRR to A. Hiser, NRR, et 2

11/01/01 Non-public al., Re: CRDM Order (2 pages)

Predecisional B-i 69 E-mail A. Lee, NRR, to A. Hiser, NRR, et al., Re:

5 pages 11/01/01 Non-public Slide Input for 11 -05 ET Brief (5 pages)

Predecisional E-mail K. Johnson, NRR to L. Burkhart, NRR, Re:

Non-public B-170 Meeting Re: Orders Rescheduled to Friday at 9 1 page 11/01/01 Predecisional AM (1 page)

E-mail S. Sands, NRR, to L. Burkhart, NRR, Re:

Non-public B-171 Meeting Re: Orders Rescheduled to Friday at 9 1 page 11/01/01 Predecisional AM (1 page)

E-mail J. Zimmerman, NRR, to CRDM Comm.

Non-public B-172 eam Re: 11/08/01 Meeting with NEI, MRP, &

1 page 11/01/01 Predecisional PWR Licensees on CRDMs (1 page)

E-mail A. Lee, NRR, to A. Hiser, NRR, et al., Re:

Non-public B-173 Slide Input for 11 -05 EDO Brief (Revised) (5 5 pages 11/02/01 Predecisional pages)

E-mail J. Strosnider to J. Zimmerman re: Final 3

es 11/03/01 Non-public

-174Agenda for 11/09/01 briefing pag Predecisional E-mail L. Burkhart, NRR, to J. Strosnider, NRR, 1

11/04/01 Non-public 8-175 Re: Fwd: Revised Davis-Besse Order (1 page) page Predecisional B-176 E-mail J. Strosnider, NRR, to A. Hiser, NRR, et 1 age 11/04/01 Non-public al., Re: CRDM Documents (1 page)

Predecisional E-mail A. Lee, NRR, to A. Hiser, NRR, et al., Re:

I I 1 Non-public B-177 Latest Version of Order for D-B (1 page) 1 page 11/05/0 Predecisional E-mail D. Pickett, NRR to G. Dick, NRR, et al.,

Non-public B-178 Re: Copies of Photos for EDO Brief Today (1 1 page 11/05/01 Predecisional page)

E-mail A. Hiser, NRR, to J. Zimmerman, NRR, 7 ages 11/05/01 Non-public Re: Slides for EDO Brief (7 pages)

P

_Predecisional B-1 80 E-mail L. Burkhart, NRR, to A. Hiser, NRR, et al., 3 pages 11/05/01 Non-public Re: Updated Tables (3 pages)

Predecisional B-181 E-mail L. Burkhart, NRR, to A. Hiser, NRR, et al., 3 pages 11/05/01 Non-public Re: Updated Order (3 pages)

Predecisional Listing of Records Concerning Vessel Head Degradation at Davis-Besse Renuested bv Conaressmen Tauzin & Gillmor ItmN.

ReodTteEst.

Date Disposition

1)

Record Title Volume (note 2)

B-182 E-mail L. Burkhart, NRR, to D. Pickett, NRR, Re:

1 page 11/05/01 Non-public oday's Briefing (1 page)

Predecisional E-mail L. Burkhart, NRR, to A. Hiser, NRR, et al.,

Non-public B-183 Re: Fwd: Further Discussions re: Davis-Besse 1 page 11/05/01 Predecisional Order (1 page) 8-184 E-mail L. Burkhart, NRR, to A. Hiser, NRR, et al.,

1 page 11/05/01 Non-public Re: Brief re: Status of Orders (1 page)

Predecisional E-mail B. Sheron, NRR, to L. Burkhart, NRR, Re:

Non-public B-185 Fwd: October 31st Note Regarding CRDM 1 page 11/05/01 Predecisional Cracking (Questions from EDO) (1 page)

E-mail D. Pickett, NRR, to A. Hiser, NRR, et al.,

1 page 11/05/01 Non-public Re: Davis-Besse Shutdown Costs (1 page)

Predecisional E-mail S. Bajwa, NRR, to L. Burkhart, NRR, Re:

Non-public B-187 Fwd: Further Discussions Re: Davis-Besse Order 1 page 11/05/01 Predecisional 1 page)

-1 88 E-mail S. Long, NRR, to L. Burkhart, NRR, Re:

1 page 11/05/01 Non-public SPSB Words for Davis-Besse Order (1 page)

Predecisional E-mail J. Chung, NRR, to L. Burkhart, NRR, Re:

Non-public B-189 Fwd: Further Discussions re: Davis-Besse Order 1 page 11/06/01 Predecisional (1 page)

B-190 E-mail D. Pickett, NRR, to B. Bateman, NRR, Re:

1 page 11/06/01 Non-public Davis-Besse Photos (1 page)

.Predecisional B-191 E-mail D. Pickett, NRR, to L. Burkhart, NRR, Re:

1 page 11/06/01 Predecisional Davis-Besse Order (1 page)

____________l E-mail B. Sheron, NRR, to B. Bateman, NRR, et Non-public B-192 I., Re: Call from S. Moffit @ Davis-Besse (1 1 page 11/06/01 Predecisional age)

B-193 E-mail S. Bajwa, NRR, to A. Hiser, NRR, et al.,

1 page 11/06/01 Non-public Re: Davis-Besse Videotapes (1 page)

Predecisional E-mail J. Zimmerman, NRR, to PWR PMs &

Non-public B-194 Management, Re: Staff's Technical Assessment 24 pages 11/06/01 Predecisional f VHP Nozzle Cracking (24 pages)

E-mail J. Zimmerman, NRR, to S. Long, NRR, 8195 Re: Pre-Meeting to discuss 1/8 Tech.

4 pages 11/06/01 Non-public Assessement Meeting & 11/9 ACRS Meeting (4 Predecisional pages)

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

X Est.

Date Disposition (note 1)

Volume D

(note 2)

E-mail F. Reinhart, NRR, to J. Chung, S. Long, N

B-196 NRR, Re: Fwd: Call from S. Moffit @ Davis-1 page 11/06/01 Predecisional Besse (1 page)

B E97

-mail A. Hiser, NRR, to J. Chung, NRR, Re:

1 ae 11/06101 Non-public Fwd: Revised Section (1 page)

Predecisional e-mail from Steve Long to Andrea Lee, subject B-203

'Steve's Suggested Input to CRDM NUREG vol 1 6 pages 02/28/02 Non-public (general section) with attached WordPerfect file Predecisional named "StevesNUREGl inputs.wpd" e-mail from Steve Long to Andrea Lee,

Subject:

Non-public B-216 Re: Davis-Besse WORDS (SEE TEXT IN E-1 page 03/19/02 Predecisional

_ MAIL) e-mail from Steve Long to George Lanik,

Subject:

301 Non-ublic B-217 Boric Acid Corrosion with attached file Boric Acid 03/20/02 Nopuic orrosion Guidebook, Revision 1 pages Proprietary e-mail from Steve Long to Sonia Burgess, B-246

Subject:

Conceptual Basis for an SDP for Davis-4 pages 04/23/02 Non-public Besse Head Cavity with attached SDP Phase 3 Predecisional wpd file B-276 e-mail from Steve Long to Mark Caruso,

Subject:

4 pages 05/09/02 Non-public Markey Q19 Draft answers with attached file Predecisional e-mail from Steve Long to Anthony Mendiola, Non-public B-292

Subject:

Markey Q 1 9b Resp. Rev. with attached 2 pages 05/23/02 Predecisional ile C-013A Safety Assessment of the Davis-Besse Unit 1 50 pages 04/08/02 Non-public Reactor Pressure Vessel Head Degradation Proprietary Supplemental Information in Response to the C-020 November 28, 2001, Meeting Regarding the 102 11/30/01 Non-public Davis-Besse Nuclear Power Station Response to pages Proprietary NRC Bulletin 2001-01 C-2AResponse to Request for Additional Information 36 pages Unknown Non-public concerning NRC Bulletin 2001-01 Proprietary Letter to Dr. Brian Sheron from Alexander Marion Non-public C-038 re: Generic Information for Use by Licensees in 44 pages 08/21/01 Proprietary Response to NRC Bulletin 2001-01 Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item Record Title Est.

Date Disposition (note 1)

ReodTteVolume Dae (note 2) l-Ltr W. Shack, Argonne National Lab, to N.

Non-public C-042 Chokshi, RES, Re: Estimates of the probability 8 pages 07/29/01 Predecisional f failure of CRDM nozzles E-mail W. Shack, Argonne National Lab, to A.

Non-public C-049 Hiser, et al., NRR, Re: Reconsideration of the 2 pages 10/17/01 Predecisional Davis-Besse Analysis (2 pages)

E-mail W. Shack, Argonne National Lab, to A.

Non-public C-050 Hiser, et al., NRR, Re: Davis-Besse Report (2 2 pages 10/17/01 Predecisional ages)

E-mail W. Shack, Argonne National Lab, to A.

Non-public C-052 Hiser, NRR; E. Hackett, RES, et al., Re: More 1 page 10/30/01 Predecisional numerology (1 page) 0-053 E-mail W. Shack, Argonne National Lab, to A.

1 ages 11/04/01 Non-public C053 Hiser, NRR, Re: One Last Shot (11 pages) 100 Predecisional 5

04/5/02 Non-public C-058 Freedom of Information Act Request 2002-0226 5 pages 042502 Predecisional DRAFT-Technical Evaluation on the Non-public C-060 Environment in the Crevice between a Leaking 16 pages 03/24/02 Predecisional RDM Nozzle and the Reactor Vessel Head D-002A Draft Letter from Dyer to Bergendahl Re:

5 aes Unknown Non-public Revised Confirmatory Action Letter - Davis-Besse pgPredecisional DRAFT, Letter from J. Dyer, Confirmatory Action Non-public D-002B Letter Addendum - Davis-Besse Nuclear Power 4 pages Unknown Predecisional Station D-025C Confirmatory Action Letter 3 pages Unknown Non-public

________Predecisional Draft Itr S. Sands, NRR, to G. Campbell, First Non-public D-032A Energy, Re: Davis-Besse Response to NRC 4 pages Unknown Predecisional Bulletin 2001-01 Draft Itr S. Sands, NRR, to G. Campbell, First Non-public D-033A Energy, Re: Davis-Besse Request for additional 8 pages Unknown Predecisional information Draft Itr S. Sands, NRR, to G. Campbell, First Non-public D-034A Energy, Re: Davis-Besse Documentation of 4 pages Unknown Predecisional conference call of November 15, 2001

.- 6

_ai-es NR AlT..02-03.(draft) 35..age....kn.wn.Non-pul.c D-063 Davis-Besse NRC AIT 02-03 (draft) 35 pageslUnknown Non-public Listing of Records Concerning Vessel Head Degradation at Davis-Besse l_____

Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.

Dae Disposition (note 1)

Record Title Volume D

(note 2)

Predecisional D-064 Davis-Besse NRC AIT 02-03 (draft) 32 pages Unknown Non-public nPredecisional D-065 Davis-Besse NRC AIT 02-03 (draft) 43 pages Unknown Predecisional Non-pubionli D-066 Davis-Besse NRC AlT 02-03 (draft) 35 pages Unknown Predecisiona E-012 NRR Leadership Team Meeting 22 pages 08/20/01 Non-public Predecisional E-01 4 E-mail from James Medoff re: Mtg tomorrow at 1 page 08/28/01 Non-public am re: CRDM stuff!

Predecisional E-015 NRR Executive Team Meeting 6 pages 09/26/01 Non-public Predecisional Email from Jacob Zimmerman re: EDO &

9 10/01/01 Non-public E-016 Commissioners TA Briefing on Bulletin 2001-01 pages Predecisional Meeting Notice for meeting on 11/8/01 to discuss NRC Staffs technical assessment for vessel head penetration nozzle cracking associated w/ NRC 11108101 Non-public E-017 Bulletin 2001-01, Circumferential Cracking of 1 page Predecisional Reactor Pressure Vessel Head Penetration Nozzles E-018 Slides - Status of NRC Staff Review of FENOCs 5 ages 11/29/01 Non-public Bulletin 2001-01 Response for Davis-Besse pag Predecisional E-019 Slides - Status of NRC Staff Review of FENOCs 6 pages 11/30/01 Non-public Bulletin 2001-01 Response for Davis-Besse Predecisional E-020 Table - Plants with Cracking or Leakage History 1 page Unknown Non-public (Bin 1) and High Susceptibility Plants (Bin 2)

Predecisional D-21 raft Staff Criteria for Evaluating Licensee 1 aeUkonNon-public E-021 nspection1 page Unknown Predecisional Dates of Davis-Besse Interactions and Non-public E-022 handwritten technical notes Re: crack growth 1 page Unknown Predecisional rates G-24 raphs: Cumulative POF, Failure Frequency 3 pages Unknown Non-public E-024eatinsPredecisional I

Listing of Records Concerning Vessel Head Degradation at Davis-Besse Reauested by Congressmen Tauzin & Gillmor Est.

Disposition Record Title Volume Date (note 2)

Summary of Davis-Besse Risk Assessment of 1 page Unknown Non-public 3RDM Crackings I

Predecisional Handwritten notes from briefing on CRDM issue 4 pages 08/01/01 Non-public HandwittenPredecisional E-mail J. Medoff, NRR, to D. Nelson, OE; J.

Zimmerman, NRR, et al., RE: Room for Today's 1

09104/01 Non-public Meeting of the Orders Task Group w/handwritten page Predecisional notes (1 page)

Considerations for "Adequate Protection" Non-public Arguments on CRDM Nozzle Cracking Issue [S.

1 page 09/12/01 Predecisional Long, NRR, WP file "ad protect consid"] (1 page)

Basis for Order to Perform Adquate Inspection of Non-public CRDM Nozzles for SCC [S. Long, NRR, WP file 2 pages 09/19/01 Predecisional "order logic"] (2 pages) }______

White Paper Insert [S. Long, NRR WP file "white 2 pages 09/26/01 Non-public paper insert"] (2 pages)

Predecisional Notes from Davis-Besse Phone call with NRC 1 page 10/03/01 Non-public taff 1pg 100/1Predecisional ommission Technical Assistant Briefing (4 4pages 10/11/01 Non-public pages) 4 ae 01/1Predecisional Potential for the Plant's Core Damage to Rise [S.

1 10/16/01 Non-public Long, NRR, WP file "ad prot insert"] (1 page) page Predecisional Draft Memo from Grobe to Zwolinski Re:

Request for Technical Assistance - Risk 2 pages Unknown Non-public ssessment of the Davis-Besse Head Predecisional Degradation Phase 3 Significance Determination for Cavity in 3 pages 04/23/02 Non-public Davis-Besse Reactor Pressure Vessel Head Predecisional Commissioners' Technical Assistants Brief -w-11 pages 10/03/01 Non-public Staff Comments Predecisional E-037 nspector Notes on Potential RCS Leakage Sources 1 page Unknown Non-public Predecisional I

_I

_J Listing of Records Concerning Vessel Head Degradation at Davis-Besse Requested by Congressmen Tauzin & Gillmor Item No.

ReodTteEst.,

Dt Disposition (note1Dateume(note 2)

E-038 Green Ticket G20020265 (Marked Up Copy) 12 pages 05/16/02 Non-public Predecisional Letter from FirstEnergy to USNRC Re:

Supplemental Information in Response to the Non-public E-040 November 28, 2001 meeting Regarding the 6 pages 11/30/01 Predecisional Davis-Besse response to NRC Bulletin 2001 w-staff notes H-007 Reactor Plant Event Notification 38757 2 pages 03/08/02 Non-public I-0 Predecisional NRC Bulletin 2001-01 Circumferential Cracking Non-public H-008 of Reactor Pressure Vessel Head Penetration 15 pages 08/03/01 Predecisional Nozzles 1-009A Slides from Commissioners TA Briefing - Davis-15 pages 03/14/02 Non-public Besse Reactor Vessel Head Predecisional 1-020 NRC Augmented Inspection Team Exit Meeting 24 pages 04/05/02 Non-public Predecisional J-001 Davis-Besse Diagrams (fax) 2 pages 03/06/02 Non-public Predecisoa Note 1 :The first letter in the item number represents the following:

A - NRC internal memorandum or document B - NRC e-mails C - Incoming correspondence D - Outgoing correspondence E - NRC staff notes F - Pictures/photographs G - Video tapes H - Licensee documents I - Meeting handouts J - Drawings K - Media Documents Note 2:Records identified as "public" are those for which the NRC requests no special handling and includes documents already in NRC's public document room.

Non-public documents on this listing contain one or more of the following types of information that are not routinely released to the public.

Proprietary information - Trade secret or other confidential financial or commercial information; unauthorized disclosure is prohibited by the Trade Secrets Act.

Predecisional interagency or intragency memoranda or letters where the information is not released in the final form considered as part of the agency's deliberative process before a final decision is made.