ML030980721
| ML030980721 | |
| Person / Time | |
|---|---|
| Site: | Robinson (DPR-023) |
| Issue date: | 04/04/2003 |
| From: | Fredrickson P NRC/RGN-II/DRP/RPB4 |
| To: | Moyer J Carolina Power & Light Co |
| Shared Package | |
| ML030980715 | List: |
| References | |
| Download: ML030980721 (6) | |
Text
April 4, 2003 Carolina Power & Light Company ATTN:
Mr. J. W. Moyer Vice President H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550
SUBJECT:
MEETING
SUMMARY
- ANNUAL ASSESSMENT MEETING H. B. ROBINSON NUCLEAR PLANT
Dear Mr.Moyer:
This refers to the open annual assessment category 1 public meeting that was conducted at our request at the Hartsville Memorial Library on March 27, 2003, to present the results of the 2002 annual assessment. The topics discussed included the reactor oversight process, the NRCs action matrix and the performance of the Robinson Nuclear Plant. A list of attendees and a copy of the presentation handout are enclosed.
It is our opinion that this meeting was beneficial.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact us.
Sincerely,
/RA/
Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-261 License No. DPR-23
Enclosures:
- 1. List of Attendees
- 2. Presentation Handout cc w/encls: (See page 2)
2 CP&L cc w/encls:
Chris L. Burton Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution T. P. Cleary Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution James W. Holt, Manager Performance Evaluation and Regulatory Affairs CPB 9 Electronic Mail Distribution C. T. Baucom, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution B. L. Fletcher III, Manager Regulatory Affairs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
S. C. Department of Health and Environmental Control Electronic Mail Distribution Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution William D. Johnson Vice President & Corporate Secretary Carolina Power & Light Company Electronic Mail Distribution John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Distribution w/encls: (See page 3)
3 CP&L Distribution w/encls:
C. Patel, NRR RIDSNRRDIPMLIPB PUBLIC PUBLIC DOCUMENT (circle one): YES NO OFFICE DRP/RII SIGNATURE GTM NAME GMacDonald:as DATE 04/04/2003 E-MAIL COPY?
YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030980721.wpd List of Attendees NRC Attendees P. Fredrickson, Branch Chief, Division of Reactor Projects (DRP), Region II B. Desai, Senior Resident Inspector, Robinson, DRP, RII D. Jones, Resident Inspector, Robinson, DRP, RII Julia Bell, Robinson Site Secretary, DRP, RII Licensee Attendees J. Moyer, Site Vice President, Robinson Nuclear Plant (RNP)
C. Burton, Director Site Operations, RNP T. Cleary, Plant General Manager, RNP C. Baucom, Supervisor Licensing/Regulatory Programs, RNP C. Church, Manager Engineering, RNP D. McNeill, Supervisor Communications, RNP