ML030940506
| ML030940506 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/04/2003 |
| From: | Shukla G NRC/NRR/DLPM/LPD4 |
| To: | Stephen Dembek NRC/NRR/DLPM/LPD4 |
| Shukla G, NRR/DLPM,415-8439 | |
| References | |
| Download: ML030940506 (5) | |
Text
April 4, 2003 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Girija Shukla, Project Manager, Section 2 Project Directorate IV
/RA/
Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY DATE & TIME:
Tuesday, April 15, 2003 10:30 a.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-14B8 Rockville, Maryland PURPOSE:
To discuss steam generator issues for Diablo Canyon (see attached agenda).
CATEGORY*:
This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC PG&E D. Duvigneaud S. Ketelsen L. Lund J. Arhar C. Khan T. Baldwin E. Murphy T. Pitterle (Westinghouse)
K. Karwoski B. Keating (Westinghouse)
J. Fleck (Framatome)
J. Begley (Framatome)
Docket Nos. 50-275 and 50-323
Attachment:
Agenda (Accession No. ML030940506) cc w/att: See next page MEETING CONTACT: Girija Shukla, (301) 415-8439 Gss@nrc.gov
- Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, 67 FR 36920, May 28, 2002.
April 4, 2003 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Girija Shukla, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY DATE & TIME:
Tuesday, April 15, 2003 10:30 a.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-14B8 Rockville, Maryland PURPOSE:
To discuss steam generator issues for Diablo Canyon (see attached agenda).
CATEGORY*:
This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC PG&E D. Duvigneaud S. Ketelsen L. Lund J. Arhar C. Khan T. Baldwin E. Murphy T. Pitterle (Westinghouse)
K. Karwoski B. Keating (Westinghouse)
J. Fleck (Framatome)
J. Begley (Framatome)
Docket Nos. 50-275 and 50-323
Attachment:
Agenda (Accession No. ML030940506) cc w/att: See next page MEETING CONTACT: Girija Shukla, (301) 415-8439 Gss@nrc.gov
- Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, 67 FR 36920, May 28, 2002.
OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME GShukla EPeyton AWang for:
SDembek DATE 4/4/03 4/4/03 4/4/03 OFFICIAL RECORD COPY
DISTRIBUTION FOR MEETING NOTICE WITH PACIFIC GAS AND ELECTRIC COMPANY ON APRIL 15, 2003 Hard Copy:
PUBLIC PDIV-2 Reading GShukla Receptionist OWFN/TWFN E-Mail:
RidsNrrAdpt (BSheron / RAuluck)
RidsNrrDlpm (JZwolinski / TMarsh)
RidsNrrDlpmLpdiv (HBerkow)
SDembek RidsNrrPMGShukla RidsNrrLAEPeyton RidsNrrPMDDuvigneaud RidsNrrAdpt (KJohnson)
RidsOpaMail RidsOgcMailCenter RidsAcrsAcnwMailCenter LLund (NRR/DE/EMCB)
EMurphy (NRR/DE/EMCB)
CKhan (NRR/DE/EMCB)
MKotzalas (NRR/PMAS)
BMcDermott, EDO BHenderson, Region IV AHowell, Region IV PMNS
AGENDA MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY APRIL 15, 2003 1.
Introduction and
Background:
2.
Technical Discussion:
a.
Pulled tube results and effect on correlations b.
Alternate repair criteria (ARC) analysis conservatisms and responses to NRC probability of prior cycle detection (POPCD) questions c.
Alternative methods to demonstrate acceptability of full cycle operation PUBLIC COMMENTS 3.
Conclusion PUBLIC COMMENTS
Diablo Canyon Power Plant, Units 1 and 2 cc:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Mr. Pete Wagner Sierra Club California 2650 Maple Avenue Morro Bay, California 93442 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Christopher J. Warner, Esq.
Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 Mr. David H. Oatley, Vice President and General Manager Diablo Canyon Nuclear Power Plant P.O. Box 56 Avila Beach, CA 93424 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 Mr. Ed Bailey, Radiation Program Director Radiologic Health Branch State Department of Health Services P.O. Box 942732 (MS 178)
Sacramento, CA 94234-7320 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA 95814 Mr. James R. Becker, Vice President Diablo Canyon Operations and Station Director Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, CA 93424 Mr. Gregory M. Rueger Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, CA 93424