ML030920331
| ML030920331 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 03/20/2003 |
| From: | Warner M Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NYN-03028 | |
| Download: ML030920331 (2) | |
Text
0FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 March 20, 2003 Docket No. 50-443 NYN-03028 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Seabrook Station Request for Review and Issuance Date Change for Refueling Outage Related License Amendment Requests 02-03, 02-04, 02-05, 02-06. 02-07, and 02-08 FPL Energy Seabrook, LLC (FPLE Seabrook) has rescheduled its 2003 Refueling Outage (OR09) to commence on October 4, 2003, one week earlier than the previous date of October 11, 2003. In order to support the orderly conduct of the refueling outage, FPLE Seabrook requests NRC issuance of the following License Amendment Requests (LAR) by September 15, 2003:
License Amendment Request Letter Number Title LAR 02-03 NYN-02095 Changes to Technical Specifications Associated with Nuclear Instrumentation LAR 02-04 NYN-02093 Revision to Technical Specifications Associated with Pressure/Temperature Curves and Low Temperature Overpressure Protection Limits LAR 02-05 NYN-02094 Relocation of Technical Specifications Associated with Boration Systems and Chemistry, Revision of Certain Technical Specifications Associated with the Reactor Coolant System LAR 02-06 NYN-02103 Revision to Technical Specifications Associated with Reduction of Decay Time for Core Offload LAR 02-07 NYN-02089 Changes to TS 3.9.4 Containment Building Penetrations LAR 02-08 NYN-03006 Changes to Technical Specification Associated with Secondary Coolant Specific Activity
bo
U. S. Nuclear Regulatory Commission NYN-03028/Page 2 Should you have any questions regarding this letter, please contact Mr. James M. Peschel, Regulatory Programs Manager, at (603) 773-7194.
Very truly yours, FPL Energy Seabrook, LLC Mark E. Warner Site Vice President cc:
H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G. T. Dentel, NRC Senior Resident Inspector Mr. Donald Bliss, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord,NH 03301