March 20, 2003 MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel /RA/

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE OVERSIGHT PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held on January 31, 2003. Attached for your information are the minutes from the internal meeting of the Davis-Besse Oversight Panel and the Open Action Items List.

Attachments: As stated cc w/att: H. Nieh, OEDO J. Dyer, RIII J. Caldwell, RIII M. Parker, RIII DB0350

MEMORANDUM TO: Davis-Besse Nuclear Power Station IMC 0350 Panel FROM: John A. Grobe, Chairman, Davis-Besse Oversight Panel

SUBJECT:

MINUTES OF INTERNAL MEETING OF THE DAVIS-BESSE OVERSIGHT PANEL The implementation of the IMC 0350 process for the Davis-Besse Nuclear Power Station was announced on April 29, 2002. An internal panel meeting was held on January 31, 2003. Attached for your information are the minutes from the internal meeting of the Davis-Besse Oversight Panel and the Open Action Items List.

Attachments: As stated cc w/att: H. Nieh, OEDO J. Dyer, RIII J. Caldwell, RIII M. Parker, RIII DB0350 DOCUMENT NAME: G:\Davis-Besse 0350\internalmtgminutes\internalmtgminutes0131.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII RIII NAME DPassehl:klg CLipa JGrobe DATE 03/11/03 03/11/03 03/20/03 OFFICIAL RECORD COPY

MEETING MINUTES: Internal IMC 0350 Oversight Panel Meeting Davis-Besse Nuclear Power Station DATE: January 31, 2003 TIME: 1:00 p.m. Central ATTENDEES:

J. Grobe D. Passehl J. Collins B. Dean M. Phillips D. Hills J. Hopkins J. Jacobson C. Lipa C. Thomas Agenda Items:

1. Discuss Plant Status and Inspector Insights
  • Integrated Safety Features Actuation Systems test was performed for train #1.

Discrepancies included #3 Service Water Pump not starting and the suction valve for #1 Decay Heat Pump not operating properly. Troubleshooting and retesting is scheduled for the weekend.

  • The emergency sump screens are being prefabricated.
  • The schedule was moving on key inspection items. The Normal Operating Pressure test is scheduled for March 13, 2003.
2. Discuss Allegation Status M. Phillips provided a summary to the DBOP of all allegations made on Davis-Besse since January 2002 for review. A summary of the results indicated 29 concerns were identified in a nine month span. Approximately 50% were substantiated. A total of 20 chilled environment issues were raised with 8 substantiated, 4 being reviewed, and three limited in review due to individuals not wishing to communicate with the NRC.

The Davis-Besse Oversight Panel (DBOP) took actions to identify items for restart. An effort was deemed necessary to determine if the problems were fixed, currently ongoing or both. A review was agreed upon for current effects of these issues. Major areas of emphasis were noted in personnel integrity, equipment operability, discrimination and safety conscious work environment. The possible drafting of a chilled effect letter to the licensee was discussed.

3. Discuss/Approve Special Inspection Plan for Resident Inspector Activities This item was reviewed and comments produced by the DBOP.
4. Discuss End-of-Cycle Document This item was reviewed and comments produced by the DBOP.
5. Discuss Items from 1/21/03 Panel Meeting which were identified during the 1/9/03 Inspection Scheduling Meeting SSDI - The consensus of the 0350 panel members was that the SSDI scope had been sufficiently covered in the system health inspection and therefore completion of the SSDI could be credited and the currently scheduled one can be removed from the schedule. This is documented with todays minutes.

Heat Sink Inspection - After a briefing by Marty Farber, the consensus of the 0350 panel members was that the heat sink inspection scope had been sufficiently covered in the system health inspection and therefore the completion of the heat sink inspection could be credited and the currently scheduled one can be removed from the schedule. This is documented with todays minutes.

Modification/50.59 Inspection - Marty Farber was tasked with looking more closely at what was covered in the system health inspection and determining whether the scope of the modifiction/50.59 inspection was already completed. He then needs to come back to the 0350 panel with his recommendation. Action item added to track this.

Problem Identification and Resolution Inspection - The 0350 panel members agreed that if the Corrective Actions Team (CAT) inspection is scoped appropriately then it should capture the scope of the P&IR inspection. Therefore, this inspection can be removed from the current schedule. When Zelig Falevits picks up the CAT inspection, he should ensure it is scoped accordingly. Action item added to track this.

Once DRS has developed a draft CY-2004 baseline inspection schedule for Davis Besse (in conjunction with the upcoming regional inspection planning meeting), the 0350 panel members requested that DRS brings this back to the 0350 panel for review.

Action item added to track this.

Discuss Appendix R Meeting - Need to factor the results of R. Gardners meeting with licensee so that the Panel can factor this into the inspection plans for the corrective action team inspection and restart readiness team inspection. Action item added for Ron Gardner to brief the DBOP on Appendix R inspection plans before restart.

6. Discuss Action Items Items discussed as attached.
7. Discussion of Licensing Issues and Actions The DBOP discussed licensees actions to meet TS 4.5.2.h. It was determined that the licensee verified pump flow at 0 psig and then used pump curves to extrapolate the pump performance at higher pressures. Item to be added to the RAM for tracking.
8. Discuss/Update Milestones and Commitments The following items were discussed by the DBOP:
  • 2/4 - Commission Briefing
  • 2/11 - Public Meeting C 2/12 - End-of-Cycle Meeting C 2/19 - Brief S. Collins on End-of-Cycle meeting results. Expectations limited due to frequent updates ongoing through the Davis Besse Oversight Process.
  • 2/27 - Brief the State Government of Ohio on Davis-Besse Oversight Status C 3/5 - Annual Assessment Letter Due
9. Other The DBOP discussed a letter from A. Dunlop to C. Lipa, Davis-Besse Licensing Basis Issue with Respect to Generic Letter 97-01. Determination on this item was tracking and closeout through the RAM.

G. Wright briefed the DBOP on the activities of his inspection group to evaluate the framework of Davis-Besse and Dr. Habers SCWE and Safety Culture reviews.

Item Action Item (Date Assigned to Comments Number generated) 24a Discuss making Panel Discuss by June 30, after safety information related to significance assessment complete.

HQ/licensee calls publicly 6/27 - Invite Bateman to panel mtg.

available To discuss what else is needed to closeout the CAL (i.e. quarantine plan). 7/2 - NRR not yet ready to discuss. 7/16 - See if procedures have changed on CAL closeout -

does JD need to send letter? 7/18

- Discussed - is there an applicable regional procedure? 8/6 -

Discussed. Need to determine the final approach on the core removed from the head and the final approach on the head before the quarantine can be lifted. 8/22 -

Revisit action item after letter sent to licensee confirming plans with old vessel head (head may be onsite longer than originally anticipated) 8/29 - Memo to be sent to Region, with a letter to go out next week. 10/01- Discussed.

1) Conduct NRC staff survey-due 10/7 2)Memo to NRR - due 10/11
3) Region to issue letter 11/07-Letter required from NRR on head quarantine status. 11/19 - Letter in draft 01/03 - A. Mendiola to look at phone conference writeups on quarantine decision making to determine if they can be released to the public. 01/07 - discussed 01/21 - discussed. 01/31- A.

Mendiolas action

Item Action Item (Date Assigned to Comments Number generated) 54a Review TSP amendment D. Pickett 7/9 - Discussed. Will wait for and advise the panel on response from licensee. 7/16 -

the need for a TIA on Discussed - added action item 54b.

Davis-Besse (7/2) 8/6 - Sent to the licensee on7/22 and a response is due by 8/22.

8/22 - Discussed - need to check if response has been received. 8/27

- Received response - DRS is reviewing - will fax to NRR for 54b.

8/29 - Discussed, DRS report of response to be issued to panel prior to item 54b. 10/1-Discussed.

DRS coordinating with NRR 11/07-Discussed - On hold for draft with specific information. 12/10 - B.

Dean believed B. Bateman thought a calculation for sufficient volume of TSP was completed to technical specification value. However questions whether the calculation was to technical specification or actual TSP level remain. 01/03 -

Item under NRR review.

Calculation completion expected on Jan 17. Allegation issue in RIII domain.

01/07 - Allegation Item #3 under NRR Review for Resolution. 01/21

- Item #3 is under Region III control for final letter, holding for NRR input.

Item Action Item (Date Assigned to Comments Number generated) 73 Send feedback form on Lipa 8/6 - Generate feedback after IMC 0350 procedure to Mendiola panel meetings reduced to once IIPB (8/6) per week. 8/29 - Discussed - no change. 10/1 - Discussed. 11/7 -

D Passehl sent email to C Carpenter and D Coe indicating that we would be able to perform a review of the draft IMC 0350 during the first quarter of 2003.

12/3- discussed. 01/03 - 2 parts, short part- C. Lipa with P. Harris, long part- B. Dean.

01/07 - 2nd larger response will require meeting between all parties. 01/21 - Communications with P. Harris 01/31-Meeting with P. Harris on Feb 4 74 Matrix strategy for UCS Lipa 8/13 - Discussed. 8/22 -

and other requests. (8/8) Discussed - matrix is being developed 8/29 - Discussed -

matrix has been started. 10/1&

10/15 Discussed. 11/07 - A top ten list will be created to prioritize strategy 01/03 - Insp Meet 01/09 01/07 - most items mapped out in RAM, some letters need to be entered. 01/31- RAM inclusion M.

Phillips, NRR coord G. Dick 88 Develop draft proposal on Burgess 8/27 - Working to a due date of how to assess 8/30 to present to the panel next significance/respond to week. 10/1 - Discussed. 11/07 -M.

TIA (8/20) Reinhart rewriting draft. Due from NRR to RIII 11/30. 12/3 -

Discussed. 12/10 - TIA received 12/06. 01/03 - Package Ready Mid January, SERP expected in Feb.

01/07 - Package Ready January 17, SERP expected February 6.

12/31 - SERP on Feb 6 97 Bulletins 2002-01 and NRR 11/07 - Discussed, further 2002-02 response and research and discussion required.

acceptance (9/5) 01/07 - RAI response expected Mid February. 01/31- On track

Item Action Item (Date Assigned to Comments Number generated) 99 Bring to panel all Jacobson/ 9/24 - Decision for C. Lipa to 95002/95003 attributes Lipa discuss item with J. Jacobson; (9/5) 10/1 - Discussed. Due 10/11; 10/15 - Discussed; 11/07 - RAM item inclusion for discussion at 11/19 panel meeting; 12/19 -

Week of Jan. 6th Inspection plan mtg; 01/07 - Factoring into the RAM; 01/31- Item Closed Review LLTF report for Mendiola/

125 01/07 - In progress 0350 issues / SMRT team Lipa 126 Review Davis- Strasma Besse/Vessel Head Degradation web site content for ease of use by the public. (11/07) 127 Decision of the extent of B. Dean 12/10 - Completion date requested the needs for resolution of 12/19 - Discussed - Est. delivery the technical root cause Jan. 31st, put in Jan-Feb report 03-(11/19) 02. 01/31 - On track 130 Action to Make rec on C. Lipa EOC package (12/19) 131 OE/OI decision logic B. Clayton 01/03 - J. Grobes flowchart to be (12/19) discussed in meeting week of Jan 6 - 10 01/31 - Item submitted and discussed 132 Consolidate RAM (12/19) C.Lipa/ Due Fri 1/17. 01/31 - Item open A.Mendiola 133 12/29 Taping of debate J.Collins/ 01/03 - Licensee to deliver tape to D.Simpkins J. Strasma 136 NRR acceptance of W. Dean 01/07 - Item discussed. Meeting NOP/NOT criterial and summary of November 26, 2002 method (01/03) meeting has notation of NRR staff impressions of test plan. Once drafted, issue will be surveyed to staff to determine if consciences is correct. 01/21 - Meeting summary to discuss Fluse System, Test agreement, and future inspections.

1/31 - T. Chan fwd to J. Hopkins.

Item Action Item (Date Assigned to Comments Number generated) 137 Review of Restart D. Passehl 01/31 - Closed Checklist to verify numbering scheme (01/07) 138 Evaluate the effectiveness A. Mendiola, 01/31 - Ongoing of the Comm Plan (01/07) C. Lipa 139 Licensing Actions Review J. Hopkins 01/21 - Moved to next internal for DBOP internal meeting meeting. 01/31 - Moved on 01/21/03 (01/07) 140 Present all LERs, since D. Passehl 01/21 - Moved to next internal the discovery of the meeting. 01/31 - Do as part of degradation, to the Panel RAM - Item Closed so that they can be considered for restart (01/07) 141 Develop a special S. Thomas 01/31 - Complete and closed inspection plan for using IP 93812 in the routine resident inspector report.

(01/09) 142 Properly reassign past C. Lipa 01/31 - In progress inspection hours charged to TAC W90086 into the Reactor Program System (RPS). Prepare a memo to JDyer to reassign hours. (01/09) 143 Prepare a special J. Jacobson inspection plan for the NOP/NOT test. (01/09) 144 Prepare a special D. Hills 01/31 - Working Z. Falevits and R.

inspection plan for the Gardner corrective action team inspection. (01/09) 145 Prepare a special D. Passehl inspection plan for the restart readiness team inspection. (01/09)

Item Action Item (Date Assigned to Comments Number generated) 146 Arrange a Panel briefing D. Passehl 01/31 - open by RLangstaff to get insight into the scope and depth of 10 CFR 50 Appendix R and EOP issues at Davis-Besse so that the Panel can factor this into the inspection plans for the corrective action team inspection and restart readiness team inspection. (01/09) 147 Generate a list of items to D. Passehl 01/31 - working consider after restart as well as transition back to the normal 0350 when terminating the 0350 Panel. The items should include plans to augment inspection of corrective actions, inservice inspection, and safety culture monitoring.

(01/09) 148 Provide DIE hours from 01/21 - Item Closed 2/2/02 - 12/31/02 to Jack Grobe. (01/09) 149 SRI to coordinate with S. Thomas 01/31 - open GWright inspection of corrective actions that have been completed by the resident staff. The intent is to find ways to allow GWrights inspection to take credit for what the resident staff already accomplished. (01/09)

Item Action Item (Date Assigned to Comments Number generated) 150 SBurgess to develop a S. Burges position paper on the state of plant risk when the plant attains Mode 4 for the first time. The purpose is to support NRC scheduling of major inspections until closer to Mode 2. (01/09) 151 Develop a plan to assess G. Wright the safety culture at the plant to close Restart Checklist Item 4.b, effectiveness of corrective actions. Discuss at next 0350 internal Panel meeting. (01/09) 152 Dave Hills to bring to ARB D. Hills recommendation for closure of the 50.9 issues.

(01/09) 153 Discuss with Ken OBrien D. Hills which corrective actions will be inspected and addressed in his programmatic effectiveness report so that items which warrant inspection which will not be addressed in Kens report get addressed during the corrective action inspection. (01/09) 154 Marty has action to M. Farber followup by 1/21 with licensee to understand licensees actions to address common mode failure issues (i.e., topical issues) and brief Panel.

Then develop inspection plan to address topical issues. (01/09)

Item Action Item (Date Assigned to Comments Number generated) 155 Get resources to supplant C. Lipa resident inspector staff vacancies in February.

SRI has military leave and the RI had househunting scheduled. (01/09) 156 Read Generic Safety J. Hopkins 01/21 - Determine status of GSI-Issue-191, "Assessment of 191 Debris Accumulation on PWR Sump Pump Performance" (01/09) 157 Have resident inspection S. Thomas 01/31 - Special Inspection Plan staff address whether the inclusion licensee is correctly classifying and categorizing their backlog relative to work orders, corrective actions, and modifications to hardware.

(01/09) 158 In Ken OBriens D. Hills programmatic inspection plan, add to the summary page the addition of Restart Checklist Item 3.i, Process for Ensuring Completeness and Accuracy of Required Records and Submittals to the NRC, and deletion of Item 3.h, Radiation Protection Program.

(01/09) 159 Document closure of J. Hopkins 01/21 - Feb 1. 01/31 - One open Restart Checklist Items 6, item, send to S. Thomas for licensing issue resolution, inclusion in report.

in the resident inspector report. (01/09) 160 Draft fragnet of inspection C. Lipa 01/21 - Fragnet-time line. 01/31 -

resources, plans, and Names needed schedules. (01/09) 161 Update the RAM. (01/09) J. Jacobson M. Phillips

Item Action Item (Date Assigned to Comments Number generated) 162 Modified Containment P. Lougheed Walkdown List assessment to look into effects on ILRT and NOP/NOT tests. (01/21) 163 Flag Allegations requiring M. Phillips action prior to restart (01/21) 164 Discuss the need for a M. Phillips 01/31 - Pre-work and then ARB Chilling Effect Letter with Bruce Berson (01/21) 165 Ensure the CAT inspection Z. Falevits is scoped accordingly (01/31) 166 Once DRS has developed Panel a draft CY-2004 baseline inspection schedule for Davis-Besse (in conjunction with the upcoming regional inspection planning meeting), DRS will present this to the 0350 panel for review. (01/31) 167 R. Gardner to brief panel R. Gardner on Appendix R inspection requirements prior to restart.