Twenty-Day Response to Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
ML030860281
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/26/2003
From: Scarola J
Progress Energy Carolinas
To:
NRC/SECY/RAS
References
HNP 03-023
Download: ML030860281 (2)


Text

C40n&James Scarola U Progress Energy Harris Nuclear Plant Prmgres Energy Carolinas, Inc Serial: HNP 03-023 10 CFR 2.203 FEB 2 6 2003 Secretary, Office of the Secretary of the Commission U. S. Nuclear Regulatory Commission ATIN: Rulemakings and Adjudications Staff Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 TWENTY-DAY RESPONSE TO ORDER FOR ESTABLISHING INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS Ladies and Gentlemen:

On February 11, 2003, the Nuclear Regulatory Commission issued an Order letter,

Subject:

"Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors." In the order,Section V, the Nuclear Regulatory Commission requires that, within 20 days the licensee must, and any other person adversely affected by the Order may, submit an answer to the Order, and may request a hearing on the Order. In accordance with Section V of the Order, the Licensee may consent to the order or pursue alternate actions as described in the Order.

The Harris Nuclear Plant has reviewed the order and by this letter consents to the requirements therein. As clarified by the NRC in the public meeting held on February 24, 2003, in response to questions submitted by NEI, the scope of the bare metal visual inspection includes "the RPV head penetration nozzles and related areas of the RPV head that may be subject to external sources of boric acid." It does not include areas of the head not subject to external sources of boric acid, including, but not limited to, areas such as the inside of the head studs, the inside the lifting lug bolt holes, or the underside of the head.

P0 Box 165 New Hill, NC 27562 T>919 362 2502 F >919 362 2095

U. S. Nuclear Regulatory Commission Serial: HNP 03-023 Page 2 Please refer any questions regarding this submittal to John Caves (919) 362-3137.

Sincely RTG James Scarola, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief, and the sources of his information are employees, contractors, and agents of Progress Energy Carolinas, Inc.

Notary (Seal)

My commission expires:

-V I -

0 0 05" c:CO Mr. J. B. Brady, NRC Sr. Resident Inspector Ms. Beverly Hall, Section Chief, Radiation Protection Section, N.C. DENR Mr. C. P. Patel, NRC Project Manager Mr. L. A. Reyes, NRC Regional Administrator Director, Office of Nuclear Reactor Regulation Assistant General Counsel for Materials Litigation and Enforcement