ML030850355
| ML030850355 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/25/2003 |
| From: | Milano P NRC/NRR/DLPM/LPD1 |
| To: | |
| References | |
| TAC MB5296 | |
| Download: ML030850355 (5) | |
Text
Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with:
- a.
Actual pressurizer water level
- 58.3% in MODES 1 and 2 or < 90% in MODE 3; and
- b.
Two groups of pressurizer heaters OPERABLE with the capacity of each group ; 150 kW and capable of being powered from an emergency power supply.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Pressurizer water A.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> level not within reactor trip breakers
- limit, open.
AND A.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.
One required group of B.1 Restore required group 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pressurizer heaters of pressurizer heaters inoperable, to OPERABLE status.
C.
Required Action and C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B AND not met.
C.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Amendment 216 I
I INDIAN POINT 3 3.4.9-1
Pressurizer 3.4.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Verify actual pressurizer water level is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> S58.3%
in MODES 1 and 2 OR < 90% in MODE 3.
SR 3.4.9.2 Verify capacity of each required group of 24 months pressurizer heaters is. 150 kW.
Amendment 216 INDIAN POINT 3 3.4.9-2
DC Sources - Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources - Operating LCO 3.8.4 The following four DC electrical power subsystems shall be OPERABLE:
Battery 31 and associated Battery Charger; Battery 32 and associated Battery Charger; Battery 33 and associated Battery Charger; and Battery 34.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
DC electrical power A.1 Declare Inverter 34 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> subsystem 34 inoperable and take inoperable.
Required Actions specified in LCO 3.8.7, Inverters Operating.
B.
One DC electrical B.1 Restore DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem (31 or power subsystem to 32 or 33) inoperable.
OPERABLE status.
C.
Required Action and C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Associated Completion Time not met.
AND C.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Amendment 216
- 0.
I INDIAN POINT 3 3.8.4 - 1
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage on float charge 31 days is within the following limits:
- a.
> 125.7 V for battery 31;
- b.
> 123.5 V for battery 32; and
- c.
> 127.8 V for batteries 33 and 34.
NOTE----------------
This Surveillance shall not be performed in MODE 1, 2, 3, or 4.
Verify each battery charger supplies its 24 months associated battery at the voltage and current adequate to demonstrate battery charger capability requirements are met.
NOTES----------------
This Surveillance shall not be performed in MODE 1, 2, 3, or 4.
Verify battery capacity is adequate to supply, 24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test or a modified performance discharge test.
(continued)
Amendment 216 F.
- /'
I I
INDIAN POINT 3 3.8.4 - 2
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.4.4
NOTE----------------
This Surveillance shall not be performed in MODE 1, 2, 3, or 4.
Verify battery capacity is
- 80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified AND performance discharge test.
12 months when battery shows degradation or has reached 85%
of expected life with capacity
< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected life with capacity
Ž 100% of manufacturer's rating SR 3.8.4.5 Verify battery cells, cell plates, and racks 24 months show no visual indication of physical damage or abnormal deterioration.
Amendment -216 INDIAN POINT 3 3.8.4 - 3