ML030840588
| ML030840588 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/19/2003 |
| From: | AmerenUE |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 503812 EIP-ZZ-00226, Rev 33 | |
| Download: ML030840588 (2) | |
Text
DATE: 03/19/03 TIME: 09:11:11 AMEREN/UE DOCUT'NT CONTROL SYSTEM DO&JM-NT TRANSMITTAL PAGE:
ARDC8801 TRANSMITTAL NUMBER:
503812 TO CONTROL NUMBER: 338U TITLE: OTHER DEPT: NUCLEAR REGULATORY COMM.
LOCATION: USNRC WASH DC TRANSMITTAL DATE:
20030319 TRAN DOC CODE TYPE DOCUMENT NUMBER R
PROC EIP-ZZ-00226 APPI RETURN ACKNOWLEDGED TRANSMITTAL AND SUPERSEDED DOCUMENTS (IF APPLICABLE)
TO:
ADMINISTRATION RECORDS AMEREN/UE CALLAWAY PLANT P.O.
BOX 620
- FULTON, MO 65251 RET ALT ALT REV REV MED COPY MED COPY AFFECTED DOCUMENT 033 C
1 ACKNOWLEDGED BY:
39 DATE:
+1ý045
° oEIP-ZZ-00226 "03/06/03 FIRE BRIGADE MOBILE EQUIPMENT STORAGE LOCATIONS AND TOWING INFORMATION RFR 007678A RFR 020067B Emergency Vehicle (Fire Truck) (Note 1)
Normal Operations Alternative 1 Alternative 2-(Note 4)
Alternative 3-(Note 4)
Back-up Trailer (Note 1)
Normal Operations Alternative 1 Foam Trailer Normal Operations Alternative 1 Alternative 2(Note 4)
Alternative 3 (Note 4)
Hazmat Trailer Normal Operations Alternative 1 Towing Information Hazmat Trailer (Pintle Hitch)
OMF truck bay Turbine Building Truck Bay Plant West of the Turbine Building UHS Plant South-East along fence UHS Plant South-East along fence Plant west of the Turbine Building Demin Building OMF Truck Bay UHS Plant Southeast along fence Plant West of the Turbine Building Turbine Building Plant West UHS Plant South-East along fence
"* The Fire Truck will tow the Hazmat Trailer around the PA and through the Main Gate.
"* A 3/4 ton or larger truck will tow the Hazmat Trailer around the PA and through the Plant South gate (Gate 16).or Main Gate
"* Back-up Trailer (2" Ball Hitch)
"* Any vehicle with a 2" ball will tow the back-up trailer.
Foam Trailer (Pintle Hitch)
"* The Fire Truck will tow the Foam Trailer around the PA and through the Main Gate.
"* A 3/4 ton or larger truck will tow the Foam Trailer around the PA and through the Plant South gate (Gate 16) or Main Gate.
Note 1 -
Truck and back-up trailer cannot be stored in the same area.
Note 2 -
The Fire Protection Engineers or Fire Marshall can approve temporary alternate areas. A FPIP should be generated.
Note 3 The Fire Brigade Storage Shed (UHS Plant South Shed) should be used to temporarily store items from equipment being sent off-site for maintenance.
Note 4-Due to AFFF foam, the truck and foam trailer should be stored in a heated structure when the outside
,2 _
temperature is below freezing.
Fire((larshall / Date APPENDIX 1
References:
Page 1 of I