Table 6.1 - Station Emergency Plan Minimum Staffing Requirements
ML030840171
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/24/2003
From:
NRC/NRR/DLPM
To:
References
TAC MB6300, TAC MB6301
Download: ML030840171 (4)


Text

Table 6.1 STATION EMERGENCY PLAN MINIMUM STAFFING REQUIREMENTS Canabilitv for Additions Major Functional Area Major Tasks Position Title or Expertise On Shift 60 min 90 min Plantloperations and Assessment Shift Manager (SRO) 1 ....

of Operational Aspects Unit Supervisor (SRO) 1## - -

Plant Control Operators 3@- -

Non-Ucensed Operators 4 ....

Emergency Direction and Control Emergency Director 1* 1 -

(Emergency Director)

Notification/Communication Notify licensee, State, Local, and Communicators 1 2 1

.... 1 Federal personnel & maintain communication EOF Support Supervisor NRC Communicator 1 I Radiological Accident Assessment Emergency Operations Facility (EOF) Recovery Manager and Support of Operational Director Accident Assessment Radiaion Protection & Dose Radiation Protection Assessment Coordinator -- 1 -

Dose Assessment Supervisor .... 1 Rad Assessment Staff

...................................... P...................

1 .................

2 O.ffsite.Surveys(Field te.[pIt9 f tlant"Teams) .yI...........u e.m.P.e.*o...el.....................:...........

.. Personnel


Survey

-(H-------ch_ Team - ...... 2# 1......... ....... 1..........

'nie--- _ureyg Team Personnel -- 1 1 Radiation Protection & Dose Assessment: HP Technicians 2 3 3

a. Access Control
b. HP coverage for repair, corrective actions, search and rescue, first aid, &firefighting
c. Personnel Monitoring
d. Dosimetry
e. Dose Assessment
f. In-Plant Surveys Chemistry/Radiochemlstry Chemistry Technicians 1 1--

Note: The Capability for Additions column refers to reporting times. Reporting location may be the OSC, TSC, or EOF.

Rad monitoring team personnel (see Figure 6.3) - 2 are dispatched from the vicinity of the plant within 60 minutes.

  • Indicates the minimum number of Individuals onshift with the capabilities of performing these functions. These Individuals may also fulfill other responsibilities I Identified in this table.
    1. As a result of having a common control room, the Unit Supervisor Is shared between the two units. I

@ Onb PCO will be assigned to the unaffected unit.

Table 6.1 (cont'd)

Caoabilitv for Additions Major Functional Area Major Tasks Position Title or Expertise On Shift 60 min 90 mrin Plant System Engineering Technical Support Shift Technical Advisor 1 - -

Operations Coordinator -- 1 -

Core/Thermal Hydraulics -- 1 -

Electrical -- 1 Mechanical 1 -

Technical Support Coordinator -- 1 -

Severe Accident Management Coordinator 1 Engineering Support Supervisor

-- - 1 Repair and Corrective Actions Management of Damage Control Teams Damage Control Team Coordinator OSC Coordinator -- 1 -

Communications with In-plant Teams TSC Radio Communicator -- 1 -

Repair and Corrective Actions Mechanical MaIntenance/ 1"-1 (onshift requirements may be fulfilled by Rad Waste Operator NLOs) ** Electrical Maintenance/ 1* 1 Instrument and Control Technician Firefighting Fire Brigade Local per Technical Support Requirements Manual Rescue Operations and First Aid -- 2* Local Support Site Access Control and Security, firefighting Security Personnel All per Personnel Accountability communications, personnel Secudty plan accountability Security Coordinator -- 1 -

15 24 14 plus fire brigade and security plan required personnel Note: The Capability for Additions column refers to reporting times. Reporting location may be the OSC, TSC, or EOF.

Rad monitoring team personnel (see Figure 6.3) - 2 are dispatched from the vicinity of the plant within 60 minutes.

Indicates the minimum number of Individuals onshift with the capabilities of performing these functions. These Individuals may also fulfill other responsibilities I

identified in this table.

    • Fulfilled by NLOs on-shift to provide Initial damage control repair activities until additional support arrives. Such activities Include racking breakers, changing fuses, manipulating valves, moving equipment, and starting equipment locally.

TSC ORGANIZATION "EMERGEN'CY

-ý`DIRECTOR*

Susquehanna Steam Electric Station Units I and 2 Emergency Plan TSC ORGANIZATION Designates minimum requirements inaccoroance wttn lalwe ,i or ot-minute responsetj FIGURE 6 2 Individuals may be-----.

located in the OSC, TSC, or Field.

  • Designates positions required for TSC activation.

EOF ORGANIZATION DOSE E:oF,surpo6Rtt'r:1 PUBLIC IASSESSMENTI ........ ......

ESUPERVPSOR*T: INFORMATION VISOR SURI

  • ';' S JMANAGER Susquehanna Steam Electric Stabon Units I and 2 Emergency Plan biiate-ammniu requirements In accordance wtW 6a Wo EOF ORGANIZATION 90 minute resposinsrequird fo.

Designates positions required for EOF activation. FIGURE 6 3