AmerGen.
AmerGen Energy Company, LLC An Exelon/BtAIsh Energy Company Oyster Creek US Route 9 South PO Box 388 Forked River, NJ 08731-0388 March 14, 2003 2130-03-20078 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - February 2003 Enclosed is the February 2003 Monthly Operating Report for the Oyster Creek Generating Station.
The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
If any additional information or assistance is required, please contact Mr. John Rogers of my staff at 609.971.4893.
Very truly yours, Ernest J. Harkness P.E., Vice President Oyster Creek Generating Station EJHI/JJR Enclosure cc:
Administrator, Region I NRC Senior Project Manager Senior Resident Inspector
APPENDIX A Operating Data Report Docket No:
Date:
Completed By:
Telephone:
50-219 03/11/03 Roger Gayley (609) 971-4406 Reporting Period:
February 2003 Design values have no "Year to Date" or "Cumulative" significance.
YEAR TO MONTH DATE CUMULATIVE 1
DESIGN ELECTRICAL RATING (MWe NET).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
650
- 2.
MAXIMUM DEPENDABLE CAPACITY (MWe NET).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal 619 conditions minus the normal station service loads.
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
672 1416 211,337.1
- 4.
HOURS GENERATOR ON LINE.
(Service Hours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus. The sum of the hours that the generator 672 1416 207,143.2 was on line plus the total outage hours should equal the gross hours in the reporting period.
- 5.
UNIT RESERVE SHUTDOWN HOURS.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or 0
918.2 similar reasons but was available for operation.
- 6.
NET ELECTRICAL ENERGY (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine generator minus the normal station service 403,181 876,582 118,015,010 loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
Appendix B Unit Shutdowns Docket No:
Date:
Completed By:
Telephone:
50-219 03/11/03 Roger Gayley (609) 971-4406 Reporting Period:
F Forced S Scheduled I
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
Il-Other (Explain)
February 2003 2
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)
During February, Oyster Creek generated 403,181 net MWh electric, which was 96.9% of its MDC rating.
No.
Date Type*
Duration Reason' Method of Cause & Corrective Action to (Hours)
Shutting Down Prevent Recurrence Reactor2 There were no reactor shutdowns during this reporting period.
Summary: