ML030790572

From kanterella
Jump to navigation Jump to search
Oyster Creek Annual Assessment Invitational Letters
ML030790572
Person / Time
Site: Oyster Creek
Issue date: 03/18/2003
From: Roxanne Summers
NRC/RGN-I/DRP/PB7
To: Avery A, Beam B, Block C, Broome G, Condos A, Connors C, Connors L, Corby R, Costa L, Crowley J, Greitz G, Hauswirth R, Hershey P, Larson J, Laureigh V, Lettman T, Little G, Moran J, Morris H, Nelson J, Parker J, Picard P, Reid B, Renner J, Richards J, Ruppert W, Saxton H, Siddons D, Starodub R, Terranova P, Thornstrom D, Tosch K, Vanpelt D, Varano J, Vill J, Waldron B, Weiss J
- No Known Affiliation, Barnegat, NJ, Borough of Beachwood, NJ, Borough of Island Heights, NJ, Borough of Ocean Gate, NJ, Borough of Pine Beach, NJ, Borough of Seaside Heights, NJ, Borough of Seaside Park, NJ, Borough of South Toms River, NJ, Borough of Surf City, NJ, Coldwell Banker-Joe Connell Realty, Lacey Township, NJ, League of Women Voters of Ocean County, NJ, Monmouth-Ocean Development Council, Ocean County, NJ, Pinelands Preservation Alliance, State of NJ, State of NJ, Dept of Environmental Protection, State of NJ, Office of Emergency Mgmt, Township of Barnegat, NJ, Township of Berkeley, NJ, Township of Greater Lacey, NJ, Township of Stafford, NJ, Women's Club of Lacey, NJ
Shared Package
ml030720108 List:
References
Download: ML030790572 (36)


Text

March 18, 2003 Ms. Veronica Laureigh, Municipal Clerk Lacey Township 818 West Lacey Road Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Laureigh:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Ms. Doris Thornstrom Women's Club of Lacey P.O. Box 777 Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Thornstrom:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Daniel Van Pelt Mayor, Ocean Township 50 Railroad Avenue Waretown, NJ 08758 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Van Pelt:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. John Crowley P.O. Box 186 Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Crowley:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. John Nelson Ocean Nature and Conservation Society 35 Sandbar Drive Bayville, NJ 08721 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Nelson:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. George Broome Township of Lacey Economic Development Commission 818 West Lacey Road Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Broome:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Ms. Phyllis Picard League of Women Voters - Ocean County P.O. Box 437 Pine Beach, NJ 08741 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Picard:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Jerry Renner NJ State Police Office of Emergency Mgmt.

P.O. Box 7068, River Road West Trenton, NJ 08628-0068 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Renner:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Richard Starodub, CTF Chairman Lacey Township Schools 200 Western Blvd., Box 216 Lanoka Harbor, NJ 08734 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Starodub:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Gerry Little District 9 620 Lacey Road Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Little:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Ms. Janet Larson Ocean County Nature &

Conservation Society 21 Winding River Drive Toms River, NJ 08755 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Larson:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Alan W. Avery, Jr.

Ocean County Planning Board P.O. Box 2191 Toms River, NJ 08754-2191 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Avery:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Ms. J. Richards Rep. H. James Saxton 7 Hadley Avenue Toms River, NJ 08753 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Richards:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Stafford, Carl W. Block Township of Stafford 260 E. Bay Avenue Manahawkin, NJ 08050 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Block:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Lacey Township Committeeman, John C. Parker Township of Lacey 818 West Lacey Road Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Committeeman Parker:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Barnegat, Joseph E. Vill Township of Barnegat 900 West Bay Avenue Barnegat, NJ 08005 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Vill:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Berkeley, Joseph J. Varano Township of Berkeley P.O. Box "B", Pinewald-Keswick Rd Bayville, NJ 08721 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Varano:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Island Heights, David M. Siddons Borough of Island Heights P.O. Box AH, East End & Van Sant Aves.

Island Heights, NJ 08732 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Siddons:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Pine Beach, Russell K. Corby Borough of Pine Beach P.O. Box 425, 599 Pennsylvania Ave Pine Beach, NJ 08741 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Corby:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of South Toms River, George J. Greitz, Jr.

Borough of South Toms River 144 Mill Street South Toms River, NJ 08753 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Greitz:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Beachwood, Harold R. Morris Beachwood Borough 1600 Pinewald Rd.

Beachwood, NJ 08722 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Morris:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Lacey, Brian Reid Township of Lacey 818 W. Lacey Road Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Reid:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Ocean Gate, Peter A. Terranova Borough of Ocean Gate 151 E. Longport Avenue Ocean Gate, NJ 08740 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Terranova:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Seaside Park, Alexander B. Condos Borough of Seaside Park 1115 South Ocean Avenue SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Seaside Park,

NJ 08752:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Seaside Heights Borough P. Kenneth Hershey 901 Boulevard P.O. Box 38 Seaside Heights, NJ 08751 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Hershey:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mayor of Surf City, Leonard T. Connors, Jr.

Borough of Surf City 813 Long Beach Blvd Surf City, NJ 08008 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Connors:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Wayne Ruppert Ocean County Sheriff's Dept.

Emergency Management Division P.O. Box 2191 Toms River, NJ 08754 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Ruppert:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Ms. Theresa Lettman Pinelands Preservation Alliance 114 Hanover Street Pemberton, NJ 08068 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Lettman:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Kent Tosch NJBNE/NJDEP C.N. 415 Trenton, NJ 08625 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Tosch:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Larry Costa Coldwell Banker-Joe Connell Realty 1055 West Lacey Road Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Costa:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Richard Hauswirth The Greater Lacey Township Chamber of Commerce P.O. Box 306 Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Hauswirth:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Brian Beam NJ Board of Public Utilities Bureau of Emergency Management/Security 2 Gateway Centerr Newark, NJ 07101 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Beam:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 NJ Assemblyman Jeffrey Moran 620 West Lacey Road Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Assemblyman Moran:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. David Weiss Lacey Township Schools Western Boulevard P.O. Box 197 Lanoka Harbor, NJ 08734-0197 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Weiss:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 Mr. Benjamin Waldron Monmouth-Ocean Dev. Council 2520 Highway 35 Suites 205 & 206 Manasquan, NJ 08736-1908 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Waldron:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects

March 18, 2003 NJ Assemblyman Christopher J. Connors 620 West Lacey Road Forked River, NJ 08731 SUBJECT OYSTER CREEK NUCLEAR POWER PLANT - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Assemblyman Connors:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and AmerGen Energy Company in which the NRC staff will discuss with AmerGen our annual assessment of the safety performance of the Oyster Creek Nuclear Power Station.

The meeting will be held at 10:00 a.m. on March 28, 2003, at the Lacey Township Municipal Building, Forked River, New Jersey and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with AmerGen our assessment of their safety performance of Oyster Creek and their response to our assessment.

The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Oyster Creek and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Oyster Creek Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to the AmerGen Energy Company on March 4, 2003. The letter can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/oc_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Oyster Creek Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 28, 2003. In the interim, please do not hesitate to contact me at (610) 337-5109 if I can be of further assistance to you.

Sincerely,

/RA/

Robert J. Summers, Acting Chief Projects Branch 7 Division of Reactor Projects