ML030790564

From kanterella
Jump to navigation Jump to search
Summary of Annual Assessment Meeting with FPL Energy Seabrook
ML030790564
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 03/20/2003
From: Brian Mcdermott
NRC/RGN-I/DRP/PB6
To:
Shared Package
ml030650398 List:
References
Download: ML030790564 (3)


Text

March 20, 2003 MEETING

SUMMARY

LICENSEE: FPL ENERGY SEABROOK, LLC FACILITY: SEABROOK STATION

SUBJECT:

SUMMARY

OF MARCH 17, 2003, ANNUAL ASSESSMENT MEETING WITH FPL ENERGY SEABROOK On March 17, 2003 at 6:00 p.m., an annual assessment meeting was conducted at the Seabrook Community Center in Seabrook, New Hampshire between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook. The NRC presented and discussed its assessment of the safety performance of Seabrook Station for the period between January 1 through December 31, 2002.

The NRC presented a summary of national plant performance and discussed the annual assessment results for Seabrook Station. An update on NRC actions to enhance nuclear plant security was also presented. At the end of the meeting between the NRC and FPL Energy Seabrook, public attendees were offered the opportunity to ask questions of NRC officials.

Questions raised by local media were addressed by the NRC. There were no feedback forms submitted by the public immediately following the meeting. The attendance list is enclosed (Enclosure 1). The presentation slides can be located in the Agencywide Documents Access and Management Systems (ADAMS) by referring to Accession No. ML030780346. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Brian McDermott, Chief Projects Branch 6 Division of Reactor Projects

Enclosure 1 NRC Attendees: B. McDermott, Chief Reactor Projects Branch 6, Region I J. White, Chief, Radiation Safety and Safeguards, Region I G. Dentel, Senior Resident Inspector J. Brand, Resident Inspector V. Nerses, Senior Project Manager, NRR N. Sheehan, Public Affairs Officer, Region I Licensee Attendees: A. Stall, FPL Senior Vice President, Nuclear & CNO M. Warner, Site Vice President G. St. Pierre, Station Director P. Freeman, Engineering Director P. Stroup, Services Director Meeting Observers:

FPL Energy Seabrook, LLC 3 DOCUMENT NAME: G:\BRANCH6\ROP Assessments\ROP3 End of Cycle\Seabrook-Meeting Summary 3-17-03.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME MBarillas/MCB/ BMcDermott/BJM/

DATE 03/20/03 03/20/03 03/ /03 03/ /03 OFFICIAL RECORD COPY