Attachment - Table 1 Summary of Relief Requests
ML030790426
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 03/20/2003
From: John Nakoski
NRC/NRR/DLPM/LPD2
To: Gordon Peterson
Duke Energy Corp
References
TAC MB3923
Download: ML030790426 (1)


Text

CATAWBA NUCLEAR POWER STATION, UNIT 2 Page 1 of 1 Second 10-Year ISI Interval TABLE 1

SUMMARY

OF RELIEF REQUESTS Relief

'TLR I

I..

Request RR System or Exam.

Required Lionsee Pro posed Relief Request Number Sec.'

Component Category Item No.

Volume or Area to be Examined Method Alternative Disposition,01-003 2.1 Pressurizer B-D B3.11 100% of full penetration welds in Volumetric Use achieved 48%

Granted vessel-to-nozzles, Weld 2PZR-W1 volumetric coverage 10 CFR 50.55a nozzle weld (g)(6)(i)01-003 2.2 RCS piping B-J B9.31 100% of full penetration welds in Volumetric and Use achieved 22.87%

Granted branch piping, Weld 2NC13-WN9 Surface volumetric and 100%

10 CFR 50.55a connection surface coverage (g)(6)(i) weld 01-003 2.3 Steam C-B C2.21 100% of full penetration welds in Volumetric and Use achieved 75%

Granted generator nozzles, Weld 2SGB-06A-18 Surface volumetric and 100%

10 CFR 50.55a vessel-to-surface coverage (g)(6)(i) nozzle weld 01-003 2.4 Containment C-B C2.21 100% of full penetration welds in Volumetric and Use achieved 49.03%

Granted spray heat nozzles, 2BNSHX-3-N1 and Surface volumetric and 100%

10 CFR 50.55a exchanger 2BNSHX-3-N2 surface coverage (g)(6)(i) nozzle-to vessel welds01-003 2.5 RCP seal C-F-1 C5.21 100% of pull penetration welds in Volumetric and Use achieved 61.09%

Granted return line piping, Weld 2NV20-5 Surface volumetric and 100%

10 CFR 50.55a pipe-to-surface coverage (g)(6)(i)

I__

valve weld