ML030790167
| ML030790167 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/20/2003 |
| From: | Thadani M NRC/NRR/DLPM/LPD4 |
| To: | Cottle W South Texas |
| Jaffe D, NRR/DLPM, 415-1439 | |
| References | |
| TAC MB5155, TAC MB5156 | |
| Download: ML030790167 (6) | |
Text
March 20, 2003 Mr. William T. Cottle President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - SECOND CORRECTION OF ADMINISTRATIVE ERRORS RE: AMENDMENTS ON RELOCATION OF SHUTDOWN MARGIN LIMITS TO CORE OPERATING LIMITS REPORT (TAC NOS. MB5155 AND MB5156)
Dear Mr. Cottle:
On February 4, 2003, the Commission issued Amendment No. 150 to Facility Operating License No. NPF-76 and Amendment No. 138 to Facility Operating License No. NPF-80 for the South Texas Project, Units 1 and 2, respectively. The amendments relocated the shutdown margin limits from the Technical Specifications (TSs) to the Core Operating Limits Report and modified certain boration requirements consistent with NUREG-1431.
Through an administrative error, changes previously made to TS index pages iv and xi in Amendment Nos. 145 and 133 for South Texas Project, Units 1 and 2, respectively, were not captured in Amendments 150 and 138. The revised pages are enclosed.
Sincerely,
/RA/ DJaffe for Mohan C. Thadani, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
Corrected TS pages cc: See next page
March 20, 2003 Mr. William T. Cottle President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - SECOND CORRECTION OF ADMINISTRATIVE ERRORS RE: AMENDMENTS ON RELOCATION OF SHUTDOWN MARGIN LIMITS TO CORE OPERATING LIMITS REPORT (TAC NOS. MB5155 AND MB5156)
Dear Mr. Cottle:
On February 4, 2003, the Commission issued Amendment No. 150 to Facility Operating License No. NPF-76 and Amendment No. 138 to Facility Operating License No. NPF-80 for the South Texas Project, Units 1 and 2, respectively. The amendments relocated the shutdown margin limits from the Technical Specifications (TSs) to the Core Operating Limits Report and modified certain boration requirements consistent with NUREG-1431.
Through an administrative error, changes previously made to TS index pages iv and xi in Amendment Nos. 145 and 133 for South Texas Project, Units 1 and 2, respectively, were not captured in Amendments 150 and 138. The revised pages are enclosed.
Sincerely,
/RA/ DJaffe for Mohan C. Thadani, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
Corrected TS pages cc: See next page DISTRIBUTION:
PUBLIC RidsNrrLAMMcAllister PDIV-1 r/f RidsNrrPMMThadani G. Hill (2)
RidsNrrPMMHoncharik RidsNrrDripRorp (R. Dennig)
RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn4MailCenter (B.Johnson)
RidsNrrDlpmLpdiv (H. Berkow)
ACCESSION NO: ML030790167 NRR-106 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/PM PDIV-1/SC NAME MHoncharik MMcAllister DJaffe for MThadani RGramm DATE 3/19/2003 3/19/2003 3/19/2003 3/20/2003 OFFICIAL AGENCY RECORD
September 2002 South Texas, Units 1 & 2 cc:
Mr. Cornelius F. OKeefe Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Mr. M. T. Hardt Mr. W. C. Gunst City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Mr. C. A. Johnson/R. P. Powers AEP - Central Power and Light Company P. O. Box 289 Mail Code: N5022 Wadsworth, TX 77483 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 D. G. Tees/R. L. Balcom Texas Genco, LP P. O. Box 1700 Houston, TX 77251 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. T. J. Jordan, Vice President Engineering & Technical Services STP Nuclear Operating Company P. O. Box 289 Wadsworth, TX 77483 S. M. Head, Manager, Licensing Nuclear Quality & Licensing Department STP Nuclear Operating Company P. O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 Environmental and Natural Resources Policy Director P. O. Box 12428 Austin, TX 78711-3189 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, TX 78205 Arthur C. Tate, Director Division of Compliance & Inspection Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326
South Texas, Units 1 & 2 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 G. R. Bynog, Program Manager/
Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157, Capitol Station Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109
SOUTH TEXAS - UNITS 1 & 2 iv Unit 1 - Amendment No. 9, 27, 145, 150 Unit 2 - Amendment No. 1, 17, 133, 138 INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.0 APPLICABILITY 3/4 0-1 3/4.1 REACTIVITY CONTROLS SYSTEMS 3/4.1.1 BORATION CONTROL Shutdown Margin 3/4 1-1 Moderator Temperature Coefficient 3/4 1-6 FIGURE 3.1-2a BOL MTC VERSUS POWER 3/4 1-7a Minimum Temperature for Criticality 3/4 1-8 3/4.1.2 (This specification not used) 3/4.1.3 MOVEABLE CONTROL ASSEMBLIES Group Height 3/4 1-16 TABLE 3.1-1 ACCIDENT ANALYSIS REQUIRING REEVALUATION IN THE EVENT OF AN INOPERABLE FULL-LENGTH ROD 3/4 1-18 Position Indication Systems - Operating 3/4 1-19 Rod Drop Time 3/4 1-21 Shutdown Rod Insertion Limit 3/4 1-22 Control Rod Insertion Limits 3/4 1-23
SOUTH TEXAS - UNITS 1 & 2 xi Unit 1 - Amendment No. 43, 47, 154, 150 Unit 2 - Amendment No. 32, 36, 48, 133, 138 INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.9.11 WATER LEVEL - STORAGE POOLS Spent Fuel Pool 3/4 9-12 In-Containment Storage Pool 3/4 9-13 3/4.9.12 FUEL HANDLING BUILDING EXHAUST AIR SYSTEM 3/4 9-14 3/4.9.13 SPENT FUEL POOL MINIMUM BORON CONCENTRATION 3/4 9-17 3/4.10 SPECIAL TEST EXCEPTIONS 3/4.10.1 SHUTDOWN MARGIN 3/4 10-1 3/4.10.2 GROUP HEIGHT, INSERTION, AND POWER DISTRIBUTION LIMITS 3/4 10-2 3/4.10.3 PHYSICS TESTS 3/4 10-3 3/4.10.4 REACTOR COOLANT LOOPS 3/4 10-4 3/4 10.5 (This specification not used) 3/4-10.6 (This specification not used) 3/4.10.7 (This specification not used) 3/4.11 RADIOACTIVE EFFLUENTS 3/4.11.1 LIQUID EFFLUENTS Liquid Holdup Tanks 3/4 11-1 3/4.11.2 GASEOUS EFFLUENTS Gas Storage Tanks 3/4 11-3 3/4.11.3 (This specification not used) 3/4.11.4 (This specification not used)