ML030790014

From kanterella
Jump to navigation Jump to search
February 2003 Monthly Operating Report for Watts Bar Nuclear Plant
ML030790014
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/14/2003
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030790014 (5)


Text

Tennessee Valley Authonty, Post Office Box 2000, Spring City, Tennessee 37381-2000 MAR 1 4 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 Gentlemen In the Matter of

)

Docket No 50-390 Tennessee Valley Authority

)

WATTS BAR NUCLEAR PLANT (WBN) - FEBRUARY 2003 MONTHLY OPERATING REPORT Enclosed is the February 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4. If you have any questions concerning this matter, please call me at (423) 365-1824 Sincerely, P L Pace Manager, Site Licensing and Industry Affairs Enclosure cc See page2 Prnted om recycled pepea

U.S. Nuclear Regulatory Commission Page 2 MAR 1 11 2003 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. K. N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT FEBRUARY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Docket No.

50-390 Unit Name:

WBN Unit 1 Date:

March 7, 2003 Completed By:

P. P. Salkeld Telephone:

(423) 365-3635 Reporting Period:

February 2003

1.

Design Electrical Rating (MWe-Net):

1155

2.

Maximum Dependable Capacity (MWe-Net):

1125 Month Year-to-Date Number of Hours Reactor was Critical 672 1416 Hours Generator On-Line 672 1416 Unit Reserve Shutdown Hours 0.0 0.0 Net Electrical Energy Generated (MWh) 788422 1662803 Cumulative 54582 54316 0.0 60128872 E-2

3.
4.
5.

6.

UNIT SHUTDOWNS DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-390 WBN-1 March 7, 2003 P. P. Salkeld (423) 365-3635 REPORT PERIOD: February 2003 No.

Date Type1 Duration Reason 2 Method of Licensee System Component Cause and Corrective Action to (Hours)

Shutting Event Code4 Code4 Prevent Recurrence Down Report No.

_____Reactor

'F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Exanunation F-Adimnistrative G-Operational Error (Explain)

H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry shcets for Licensee Event Report (LER)

(NUREG - 1022)

Summary:

WBN Unit 1 operated at or near 100% power for the entire month of February 2003. There were no challenges to the pressurizer power operated rehefvalves or pressurizer safety valves during the month.

E-3