Category:E-Mail
MONTHYEARML23271A1542023-09-28028 September 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23208A3072023-07-27027 July 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23136A2782023-05-0505 May 2023 Email to R Coffey Point Beach SLRA Second Annual Update - Request for Additional Information Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22291A3692022-10-18018 October 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Use Beacon Power Distribution Monitoring System ML22249A0052022-09-0202 September 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment and Exemptions Regarding Risk-Informed Approach to Address GSI-191 ML22229A1052022-08-17017 August 2022 Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment ML22229A1022022-07-18018 July 2022 Original Request - Questions Regarding Point Beach Nuclear Power Plant ML22196A0062022-07-15015 July 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4b ML22094A0802022-04-0404 April 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-366 ML22006A2762022-01-0606 January 2022 SLR - FW: Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML22006A1952022-01-0606 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A2012022-01-0606 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A1672022-01-0404 January 2022 SLR - Ref: Point Beach ML22004A3192022-01-0404 January 2022 SLR - FW: Point Beach ML22004A0012022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22006A1942022-01-0404 January 2022 SLR - (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, Docke ML22004A3212022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A3202022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A1732022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A3182022-01-0404 January 2022 SLR - FW: EPA Comment Letter - Point Beach SEIS ML22006A1992022-01-0303 January 2022 SLR - (External_Sender) Comments of Michael J Keegan on Dseis Point Beach ML22004A3172021-12-21021 December 2021 SLR - (External_Sender) EPA Comment Letter - Point Beach SEIS ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML22006A2752021-12-0202 December 2021 SLR - (External_Sender) Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML21341A6102021-11-16016 November 2021 SLRA Safety RAI Set 12 Final Email ML21314A4212021-11-10010 November 2021 Fws to NRC, Concurrence with ESA Determination for Point Beach Subsequent License Renewal ML21307A1522021-11-0909 November 2021 NRC to Fws, Request for Concurrence with Endangered Species Act Determinations for Point Beach Subsequent License Renewal ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21279A1202021-10-0505 October 2021 Email: Wi Shpo Review Point Beach Nuclear Plant SLR ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21273A0232021-09-0202 September 2021 SLRA Safety RAI Set 9 Final Email ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2462021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final Email ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 ML21242A2232021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 Email ML21242A2192021-08-20020 August 2021 SLRA Safety RAI Set 7 Final Email ML21242A2132021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft Email ML21242A2142021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft ML21242A2042021-08-12012 August 2021 SLRA Safety RAIs Set 5 Final Email ML21224A2042021-08-12012 August 2021 LTR-21-0225-1-RIII. Time Sensitive: Request for Further Inspection ML21242A0142021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A2382021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A0112021-08-0909 August 2021 SLRA Draft Safety RAIs Set 6 Email 2023-09-28
[Table view] |
Text
I* L k I 1"*1 I I--I
=-....
-a Iioger L~1nlKsDUry - _NOJv ResponseCola" cationu Lutt ..
From: BFlentje Fritzie" <F itzie.Flentje@nmcco.com>
To: <PLL@nrc.gov> Vi4"L* UctcQ.r --
Date: 09/26/2002 3:04:34 PM
Subject:
NOV Response Clarification Letter Here is the promised letter. It was signed out today.
<<NRC 2002-0086.pdf>>
NMC] Point Beach Nuclear Plant 6610 Nuclear Road Commtted to NulearExcellence Two Rivers, WI 54242 NRC 2002-0086 10 CFR 2.201 September 26, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Ladies/Gentlemen:
Dockets 50-266 and 50-301
.-- Point Beach-Nuclear Plant,-Units 1 -and 2 Clarification of Reply to a Notice Of Violation (EA-02-03 1)
NRC Special Inspection Reports. 50-266/01-17 (DRS); 50-301/01-17 (DRS)
By letter dated July 12, 2002, the Nuclear Regulatory Commission (NRC) forwarded the final results of its significance determination and Notice of Violation (NOV) for the Red finding identified in Inspection Reports 50-266/01-17 (DRS) and 50-301/01-17 (DRS). NMC replied to the NOV via letter dated August 12, 2002. In'that letter we concurred with the violation of 10 CFR 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings." NMC also acknowledged the aspect of the violation attributed to 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action."
During the week of September 23, 2002, a follow-up inspection was conducted by the NRC to determine whether the Red finding meets the guidelines of an old design issue as described in NRC Manual Chapter 0305. During the course of this inspection, it was recognized there was some ambiguity in our discussion regarding reclassification of the open function of the auxiliary feedwater pump recirculation flow valves to safety-related. This letter serves to clarify the identified ambiguity.
Reclassification of the open function of the recirculation flow control valves as safety-related provides greater assurance that minimum flow will be available to provide internal auxiliary feedwater pump cooling. The pneumatic backup supply to the recirculation flow control valves is limited. Therefore, Point Beach will also continue to specify operator action to manually open these valves. Point Beach has one common recirculation flow path from all of the auxiliary feedwater pumps to the condensate storage tanks. Although not all of the recirculation flow path is safety related, operability of the auxiliary feedwater pumps will be dependent upon the availability of the flow path to provide minimum recirculation flow. The open function of the recirculation valves was reclassified as safety-related on September 12, 2002.
L
NRC 2002-0086 Page 2 A second question that arose during the course of the inspection was related to our plans to continue the use of PRA to enhance the safety of the facility. We stated that we plan to continue to factor PRA insights into both operating procedures and operator training. This action has already been fully implemented. We also stated, but did not define as a regulatory commitment, that the PRA update project is planned to be completed by 2004. To provide further assurance to the Commission of our intent regarding this project, the following commitment is made:
- 1. The PointBeach PRA updateproject will be completed by the end of 2004.
We trust these clarifications eliminate the potential ambiguity that were identified in our response to the NOV dated August 12, 2002.
Sicrly, -ý.- ~ .. .- .
A. J. Cayia Site Vice President FAF/kmnd cc: NRC Regional Administrator NRC Resident Inspector NRC Project Manager PSCW Director, Office of Enforcement