July 2002 Monthly Operating Report for Point Beach Units 1 & 2
ML022330300
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/12/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2002-0066
Download: ML022330300 (6)


Text

NMC Committed to Nuclear Excellence>

Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 920.388 2560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wl 54241 920 755 2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0066 GL 97-02 August 12,2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of July 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc:

J. D. Loock, PSCW NRC Region III NRC Senior Resident Inspector NRC Project Manager

ýý'qq

Docket 50-266 and 50-301 NRC-2002-0066 ATTACHMENT I Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated August 12, 2002 Re: Monthly Operating Report -July 2002

I,

.\\

OPERATING DATA REPORT DOCKET NO.

50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 08/06/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD July - 2002

1.

2.

DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 515.0 510.0 NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVER SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH)

MONTH 744.0 744.0 0.0 370,464.5 YEAR TO DATE 5,087.0 5,087.0 0.0 2,558,834.5 CUMULATIVE 228,696.8 225,181.0 846.9 104,134,354.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

3.
4.
5.

6.

?

e UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORTING PERIOD:

50-266 Point Beach, Unit 1 08/06/2002 Kim M. Locke 755-6420 (1) Reason (2) Method A. Equipment Failure (Explain)

I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction

4. Continuation E. Operator Training/license Examination F.Administrative
5. Other (Explain)

G. Operational Error (Explain) H.Other (Explain)

SUMMARY

Unit 1 average daily power for the month of June was 497.9 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

July 2002 (Month/Year)

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

1I OPERATING DATA REPORT DOCKET NO.

50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 08/06/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD July - 2002

1.

2.

DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 515.0 512.0 NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVER SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH)

MONTH 744.0 744.0 0.0 376,384.5 YEAR TO DATE 4,298.4 4,262.6 0.0 2,127,812.5 CUMULATIVE 222,080.1 219,092.7 302.2 102,911,321.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

3.
4.
5.

6.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-301 Point Beach, Unit 2 08/06/2002 Kim M. Locke 755-6420 REPORTING PERIOD:

July 2002 (Month/Year)

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason A. Equipment Failure (Explain)

B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)

(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram

4. Continuation
5. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of June was 505.9 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.