Peter E. Katz Vice President Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 410 495-3500 Fax Constellation Energy Group March 12, 2003 U. S. Nuclear Regulator Washington, DC 20555 ATTENTION:
SUBJECT:
-y Commission Document Control Desk Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Core Operating Limits Report for Unit 2, Cycle 14, Revision 3 Pursuant to Calvert Cliffs Nuclear Power Plant Technical Specification 5.6.5, the attached Core Operating Limits Report for Unit 2, Cycle 14, Revision 3 (Attachment 1) is provided for your records.
Please replace the Unit 2 Core Operating Limits Report in its entirety, with the attached Revision 3.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Veryt ly yours, PEKfDJM/bjd
Attachment:
(1) Core Operating Limits Report for Unit 2, Cycle 14, Revision 3 cc:
(Without Attachment)
J. Petro, Esquire H. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector, NRC Director, Project Directorate I-1, NRC R. I. McLean, DNR G. S. Vissing, NRC 01o
ATTACHMENT (1)
CORE OPERATING LIMITS REPORT UNIT 2, CYCLE 14, REVISION 3 Calvert Cliffs Nuclear Power Plant, Inc.
March 12, 2003
CALVERT CLIFFS NUCLEAR POWER PLANT CORE OPERATING LIMITS REPORT for UNIT 2, CYCLE 14 REVISION 3 ESP::Z LE ENGINEER n
DATE S..
-t-,.*
.",._1 I a#'*~lrar*
D,*
1 *'"}/
Pý(.
Calvert CillS 2, C.,ycle 1,- 1-L-,I.
- a. 6ý*
.I r..-z
CORE OPERATING LIMITS REPORT CALVERT CLIFFS UNIT 2, CYCLE 14 The following limits are included in this Core Operating Limits Report:
Specification Title Page Introduction...........................................................................................................
4 Definitions..............................................................................................................
5 Shutdown M argin (SDM )........................................................................................
6 M oderator Temperature Coefficient (M TC)..........................................................
6 Control Element Assembly (CEA) Alignm ent....................................................
6 Regulating Control Element Assembly (CEA) Insertion Limits............................
6 Linear Heat Rate (LHR)........................................................................................
6 Total Planar Radial Peaking Factor (F 7T).............................................................
7 Total Integrated Radial Peaking Factor (FT).........................................................
7 Axial Shape Index (ASI).......................................................................................
7 Reactor Protective System (RPS) Instrumentation - Operating............................
7 Boron Concentration...............................................................................................
8 List of Approved M ethodologies........................................................................
21 The following figures are included in this Core Operating Limits Report:
Title Page Figure 3.1.1 Figure 3.1.4 Figure 3.1.6 Figure 3.2.1-1 Figure 3.2.1-2 Figure 3.2.1-3 Figure 3.2.2 Figure 3.2.3 Figure 3.2.5 Figure 3.3.1-1 Figure 3.3.1-2 Figure 3.3.1-3 Shutdown Margin vs. Time in Cycle......................................................................
9 Allowable Time To Realign CEA Versus T
Initial Total Integrated Radial Peaking Factor (F,)............................................
10 CEA Group Insertion Limits vs. Fraction of Rated Thermal Power....................
11 Allowable Peak Linear Heat Rate vs. Time in Cycle...........................................
12 Linear Heat Rate Axial Flux Offset Control Limits.............................................
13 T
Total Planar Radial Peaking Factor (F.y ) vs.
Scaling Factor (N-Factor)....................................................................................
14 Total Planar Radial Peaking Factor (Fy T) vs. Allowable Fraction of Rated Therm al Pow er......................................................................................................
15 Total Integrated Radial Peaking Factor (FT) vs.
Allowable Fraction of Rated Thermal Power.....................................................
16 DNB Axial Flux Offset Control Limits..............................................................
17 Axial Power Distribution - High Trip Setpoint Peripheral Axial Shape Index vs. Fraction of Rated Thermal Power..................
18 Thermal Margin/Low Pressure Trip Setpoint - Part 1........................................
19 Thermal Margin/Low Pressure Trip Setpoint - Part 2........................................
20 Calvert Cliffs 2, Cycle 14 COLR Page 2 of 24 Rev. 0 3.1.1 3.1.3 3.1.4 3.1.6 3.2.1 3.2.2 3.2.3 3.2.5 3.3.1 3.9.1 Number Calvert Cliffs 2, Cycle 14 COLR Page 2 of 24 Rev. 0
UNIT 2 CORE OPERATING LIMITS REPORT LIST OF EFFECTIVE PAGES Page No.
Rev. No.
1 3
2 0
3 3
4 3
5 0
6 0
7 2
8 3
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 2
17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
Calvert Cliffs 2, Cycle 14 COLR Page 3 of 24 Rev. 3 Calvert Cliffs 2, Cycle 14 COLR Page 3 of 24 Rev. 3
INTRODUCTION This report provides the cycle-specific limits for operation of Calvert Cliffs Unit 2, Cycle 14. It contains the limits for:
Moderator Temperature Coefficient (MTC)
Control Element Assembly (CEA) Alignment Regulating Control Element Assembly (CEA) Insertion Limits Linear Heat Rate (LHR)
Total Planar Radial Peaking Factor (F,,T)
Total Integrated Radial Peaking Factor (FrT)
Axial Shape Index (ASI)
Reactor Protective System (RPS) Instrumentation - Operating Boron Concentration In addition, this report contains a number of figures which give limits on the parameters listed above. If any of the limits contained in this report are exceeded, corrective action will be taken as defined in the Technical Specifications.
This report has been prepared in accordance with the requirements of Technical Specifications.
The cycle specific limits have been developed using the NRC-approved methodologies given in the "List of Approved Methodologies" section of this report and in the Technical Specifications.
COLR Revision 0 Initial Release of Unit 2 Cycle 14 COLR (Safety Evaluations SE00451 and SE00452).
COLR Revision 1 3.9.1 Boron Concentration was revised to include a Refueling Boron Concentration Limit crediting no CEAs for a Post-Refueling Upper Guide Structure (UGS) lift or Reactor Vessel Head Lift. Safety Evaluation SE00452 provided justification for this revision.
COLR REVISION 2 Figure 3.2.3 is revised to implement a more restrictive FrT due to ROPM issues discovered mid-cycle (SE00472, Rev. 0).
COLR REVISION 3 Replaced the 0 Credited CEA option in Section 3.9.1 with an option that credits > 17,775 MWd/MT Burnup without crediting CEAs Calvert Cliffs 2, Cycle 14 COLR Page 4 of 24 Rev. 3 Calvert Cliffs 2, Cycle 14 COLR Page 4 of 24 Rev. 3
DEFINITIONS Axial Shape Index (ASI)
ASI shall be the power generated in the lower half of the core less the power generated in the upper half of the core, divided by the sum of the power generated in the lower and upper halves of the core.
ASI = lower - upper = YE lower + upper The Axial Shape Index (Y1) used for the trip and pretrip signals in the Reactor Protection System (RPS) is the above value (YE) modified by an appropriate multiplier (A) and a constant (B) to determine the true core axial power distribution for that channel.
Yr=AYE + B Total Integrated Radial Peaking Factor - FT The Total Integrated Radial Peaking Factor is the ratio of the peak pin power to the average pin power in an unrodded core.
Total Planar Radial Peaking Factor - FyT The Total Planar Radial Peaking Factor is the maximum ratio of the peak to average power density of the individual fuel rods in any of the unrodded horizontal planes.
Calvert Cliffs 2, Cycle 14 COLR Page 5 of 24 Rev. 0 Calvert Cliffs 2, Cycle 14 COLR Page 5 of 24 Rev. 0
CYCLE SPECIFIC LIMITS FOR UNIT 2, CYCLE 14 3.1.1 Shutdown Margin (SDM) (SR 3.1.1.1)
Tavg > 200 'F - Modes 3 and 4:
The shutdown margin shall be equal to or greater than the limit line of COLR Figure 3.1.1.
Tav, <:200 0F-Mode 5:
The shutdown margin shall be > 3.0% Ap.
3.1.3 Moderator Temperature Coefficient (MTC) (SR 3.1.3.2)
The Moderator Temperature Coefficient (MTC) shall be less negative than -3.0 x 10-4 ApPF at rated thermal power.
3.1.4 Control Element Assembly (CEA) Alignment (Action 3.1.4.B.1)
The allowable time to realign a CEA may be provided by the full core power distribution monitoring system (Better Axial Shape Selection System - BASSS) or COLR Figure 3.1.4, "Allowable Time to Realign CEA Versus Initial Total Intedrated Radial Peaking Factor (F2T)." If COLR Figure 3.1.4 is used, the pre-misaligned F, value used to determine the allowable time to realign the CEA shall be the latest measurement taken within 5 days prior to the CEA misalignment. If no measurements have been taken within 5 days prior to the misalignment and the full core power distribution monitoring system is unavailable then the time to realign is zero (0) minutes.
3.1.6 Regulating Control Element Assembly (CEA) Insertion Limits (SR 3.1.6.1 and SR 3.1.6.2)
The regulating CEA groups insertion limits are shown on COLR Figure 3.1.6.
3.2.1 Linear Heat Rate (LHR) (SR 3.2.1.2 and SR 3.2.1.4)
The linear heat rate shall not exceed the limits shown on COLR Figure 3.2.1-1.
The axial shape index power dependent control limits are given in COLR Figure 3.2.1-2.
When using the excore detector monitoring system (SR 3.2.1.2):
The alarm setpoints are equal to the ASI limits, therefore when the alarms are adjusted, they provide indication to the operator that ASI is not within the limits.
The axial shape index alarm setpoints are shown as a function of fraction of thermal power on COLR Figure 3.2.1-2. A scaling factor (N-Factor) vs. Fx7 is shown in COLR Figure 3.2.1-3. The fraction of thermal power shown in COLR Figure 3.2.1-2 must be scaled by the N-Factor to determine the axial shape index alarm setpoints as a function of fraction of rated thermal power.
Calvert Cliffs 2, Cycle 14 COLR Page 6 of 24 Rev. 0 Calvert Cliffs 2, Cycle 14 COLR Page 6 of 24 Rev. 0
CYCLE SPECIFIC LIMITS FOR UNIT 2, CYCLE 14 When usina the incore detector monitoring system (SR 3.2.1.4):
The alarm setpoints are adjusted to protect the Linear Heat Rate limits shown on COLR Figure 3.2.1-1 and uncertainty factors are appropriately included in the setting of these alarms.
The uncertainty factors for the incore detector monitoring system are:
- 1.
A measurement-calculational uncertainty factor of 1.062,
- 2.
An engineering uncertainty factor of 1.03,
- 3.
A linear heat rate uncertainty factor of 1.002 due to axial fuel densification and thermal expansion, and 4.a For measured thermal power less than or equal to 50 percent but greater than 20 percent of rated full core power a thermal power measurement uncertainty factor of 1.035.
4.b For measured thermal power greater than 50 percent of rated full core power a thermal power measurement uncertainty factor of 1.020.
3.2.2 Total Planar Radial Peaking Factor (FjyT) (SR 3.2.1.1 and SR 3.2.2.1)
The calculated value of FXT shall be limited to < 1.65.
The allowable combination of thermal power, CEA position, and FXfT are shown on COLR Figure 3.2.2.
3.2.3 Total Integrated Radial Peaking Factor (FFT) (SR 3.2.3.1)
The calculated value of FT shall be limited to < 1.57.
The allowable combinations of thermal power, CEA position, and FT are shown on COLR Figure 3.2.3.
3.2.5 Axial Shape Index (ASI) (SR 3.2.5.1)
The axial shape index and thermal power shall be maintained within the limits established by the Better Axial Shape Selection System (BASSS) for CEA insertions of the lead bank of
< 55% when BASSS is operable, or within the limits of COLR Figure 3.2.5 for CEA insertions specified by COLR Figure 3.1.6.
3.3.1 Reactor Protective System (RPS) Instrumentation - Operating (Reactor Trip Setpoints) (TS Table 3.3.1-1)
The Axial Power Distribution -High trip setpoint and allowable values are given in COLR Figure 3.3.1-1.
The Thermal Margin/Low Pressure (TM/LP) trip setpoint is given in COLR Figures 3.3.1-2 and 3.3.1-3. The allowable values are to be not less than the larger of (1) 1875 psia or (2) the value calculated from COLR Figures 3.3.1-2 and 3.3.1-3.
Calvert Cliffs 2, Cycle 14 COLR Page 7 of 24 Rev. 2 Calvert Cliffs 2, Cycle 14 COLR Page 7 of 24 Rev. 2
3.9.1 Boron Concentration (SR 3.9.1.1)
The refueling boron concentration will maintain the kff at 0.95 or less (including a 1% Ak/k conservative allowance for uncertainties). The refueling boron concentration shall be maintained uniform. For Mode 6 operation the RCS temperature must be maintained
< 140 TF. The 0 Credited CEA requirements shall apply for a Post-Refueling Upper Guide Structure or Reactor Vessel Head Lift.
Refuelin2 Boron Concentration Limits Calvert Cliffs 2, Cycle 14 COLR Page 8 of 24 Rev. 3 60 Credited CEA
> 17775 MWdIMT Burnup
> 17775 MWd/MT BunEup COLRTjech Spec Limit 2150 ppm 2240 ppm 1% Cherustr, Sampling Uncertainty 22 ppm 23 ppm Boron-10 Depletion to 19.40 a/o 44 ppm 45 ppm Refueling Boron Concentration Limit including Chemistry Sampling
> 2216 ppm
> 2308 ppm uncertainty and Boron-1 0 Depletion Dilution of the Refueling Pool between Low and High Level Alarms 73 ppm 73 ppm with Refueling Pool Flooded Temporary Rotations of Fuel 20 ppm 20 ppm Assemblies Refueling Boron Concentration Administrative Limit
> 2309 ppm
> 2401 ppm 60 Credited CEA Calvert Cliffs 2, Cycle 14 COLR Page 8 of 24 Rev. 3
6 51I 0
o z
z 0
D
.I C,,
4 3-1 21 0
BOC EOC TIME IN CYCLE Figure 3.1.1 Shutdown Margin vs. Time in Cycle Calvert Cliffs 2, Cycle 14 COLR Page 9 of 24 Rev. 0 ACCEPTABLE OPERATION REGION (EOC, 4.5 (BOC, 3.5)
MINIMUM SHUTDOWN MARGIN UNACCEPTABLE OPERATION REGION Calvert Cliffs 2, Cycle 14 COLR Page 9 of 24 Rev. 0
(1.53, 60) 978 -600 FrT ALLOWED REGION
(
I I
I I
1.63,0)
V
,'l 1.50 1 55 1.60 1.65 MEASURED PRE-MISALIGNED TOTAL INTEGRATED RADIAL PEAKING FACTOR 1.70 Figure 3.1.4 Allowable Time to Realign CEA Versus Initial Total Integrated Radial Peaking Factor (FrT)
Calvert Cliffs 2, Cycle 14 COLR Page 10 of24 Rev. 0 70 60 <
50 1 40 -
0
.Uj I-
,.,I 30 20 10 +
0-i-I I
I I
I Calvert Cliffs 2, Cycle 14 COLR Page 10 of 24 Rev. 0
1.000 0.900
- 0F 0.800 0.8 0-(.75. G oup 5 @ 500m)
<.70-(0.7% Grou5.@ 0%)
0.7005 (05Grc up 5 85%)
=~.0.600 I0
.56, G -up 4I 50 0) 0.500--
Long Term Steady I State Insertion Limit, 0
i Group 5 25%
S0.400 0
0 I--
=
(0.2% Grou 3
,50%)
L) 0.200 U-Short Term Steady 0.100 State Insertion Limit, 0.100Group 4 @ 20%
( od0 Grou03@ h0%)
Awlowabie BASSS (Group 5 @ 55%)
Operating Region 5
3 0
20 40 60 80 100 0
20 40 60 80 100 0
20 40 60 80 100 136.0 108.8 81.6 54.4 27.2 0.0 136.0 108.8 81.6 54.4 27.2 0.0 136.0 108.8 81.6 54.4 27.2 0.0 I I 1 4 1 i 1 I 12 I 1 1 0
20 40 60 80 100 0
20 40 60 80 100 136.0 108.8 81.6 54.4 27.2 0.0 136.0 108.8 81.6 54.4 27.2 0.0
%CEA INSERTION INCHES CEA WITHDRAWN (ARO is defined in NEOP-23)
Figure 3.1.6 CEA Group Insertion Limits vs. Fraction of Rated Thermal Power Calvert Cliffs 2, Cycle 14 COLR Page 11 of 24 Rev. 0
170 I
Ld ILl "U
_z
- 0.
-j
-J 16.5 0 16.0 0
w 15.5 a
0
+ 15.0
,J + 14.5
.J
-I LL 14.0 13.9 13.5 13.0 BOC EOC TIME IN CYCLE Figure 3.2.1-1 Allowable Peak Linear Heat Rate vs. Time in Cycle Calvert Cliffs 2, Cycle 14 COLR UNACCEPTABLE OPERATION ACCEPTABLE OPERATION Page 12 of 24 Rev. 0
W 0
IL U
0 z 0
I, U
I--
1.100 1.050 1.000 0.950 0.900 0.850 0.800 0.750 0.700 0.650 0.600 0.550 0.500 0.450 0.400 0.350 0.300 0.250 0.200
-0.60 0.60
-0.40
-0.20 0.00 0.20 0.40 PERIPHERAL AXIAL SHAPE INDEX, Yi Figure 3.2.1-2 Linear Heat Rate Axial Flux Offset Control Limits (LCO Limits are not needed below 20% thermal power)
(See NEOP-23 for Administrative Limits)
Calvert Cliffs 2, Cycle 14 COLR Page 13 of24 Rev. 0 Calvert Cliffs 2, Cycle 14 COLR.
Page 13 of 24 Rev. 0
0 I-U l
C,.,1 0
U LL z
4.,
U U1) 1.00 0 90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 1.40 1.45 1.50 1.55 1.60 1.65 T
I-xy 1.70 1.75 1.80 1.85 Figure 3.2.1-3 Total Planar Radial Peaking Factor (FxyT) vs.
Scaling Factor (N-Factor)
(See NEOP-23 for Administrative Limits)
Calvert Cliffs 2, Cycle 14 COLR Page 14 of 24 Rev. 0
W
%-JFL[
I I '.AJ 1 W
REGION 0.. 0.85
- (1.7325,0.80)
W 0.75-T FXY UMT CURVE S0.65 I
ACCEFTABLE:
LL 0.55 OPERAllON 0
-0.45 "LU 0.35 O 0.25,0 0
(1.819,0.2
<': 0.15 0.05 1
I I
I 1.60 1.65 1.70 1.75 1.80 1.85 T
Fxy Figure 3.2.2 Total Planar Radial Peaking Factor (FxyT) vs.
Allowable Fraction of Rated Thermal Power While operating with Fy greater than 1.65, withdraw CEAs to or above the Long Term Steady State Insertion Limits (Figure 3.1.6)
Calvert Cliffs 2, Cycle 14 COLR Page 15 of24 Rev. 0 Calvert Cliffs 2, Cycle 14 COLR Page 15 of 24 Rev. 0
1.05 (1.57, 1.00)
UNACCEPTABLE W 0.95 OPERATION LU 3:
REGION 0 a. 0.85
-J 1.65,080) n 0.75 W
T Fr LIMIT CURVE F
uj 0.65 F
- u. 0.55 0
z ACCEPTABLE F- 0.45 OPERATION C.)
REGION uJ0.35 S0.25
,0 (1.7324, 0.20) 0.15 0.050 1.55 1.60 1.65 1.70 1.75 1.80 T
Fr Figure 3.2.3 Total Integrated Radial Peaking Factor (FrT) VS.
Allowable Fraction of Rated Thermal Power While operating with Fr T greater than 1.57, withdraw CEAs to or above the Long Term Steady State Insertion Limits (Figure 3.1.6)
Calvert Cliffs 2, Cycle 14 COLR Page 16 of24 Rev. 2 Calvert Cliffs 2, Cycle 14 COLR Page 16 of 24 Rev. 2
1.100 1.050 1.000
(-0.08,1.00)
(0.15,1.00)
> 0.950 UNACCEPTABLE UNACCEPTABLE w
90 OPERATION, OPERATION
,, 0.900-REGION REGION 3: 0.850 0 M 0.800 (0.3, 0.80)
.Uj
-j m 0.750 0.750--,ACCEPTABLE 0 0.700
(-0.3, 0.70)
OPERATION REGION 0.650 0.600 S0.550 0.500
(-0.3, 0.50)
LL 0 0.450 0
p: 0.400 g 0.350 0.300 0.250
(-0.42, 0.20)
(0.3, 0.20) 0.200 I
[
0 I
-0.60
-0.40
-0.20 0.00 0.20 0.40 0.60 PERIPHERAL AXIAL SHAPE INDEX, Y, Figure 3.2.5 DNB Axial Flux Offset Control Limits (See NEOP-23 for Administrative Limits)
Calvert Cliffs 2, Cycle 14 COLR Page 17 of 24 Rev. 0
1.300 1.250 1 200 1.150 1.100 1.050 1 000 0.950 0.900 0.850 0 800 0.750 0.700 0.650 0.600 0.550 0.500 0 450 0.400 0.350 0.300 0.250 0.200 0.150
-0.80
-0.60
-0.40
-0.20 0.00 0.20 0.40 PERIPHERAL AXIAL SHAPE INDEX, Yi 0.60 0.80 Figure 3.3.1-1 Axial Power Distribution - High Trip Setpoint Peripheral Axial Shape Index vs. Fraction of Rated Thermal Power Calvert Cliffs 2, Cycle 14 COLR Page 18 of 24 Rev. 0 LU
..U LU
,I I-LL 0
z 0
U 0
ILL Calvert Cliffs 2, Cycle 14 COLPR Page 18 of 24 Rev. 0
1.60 1.50 QDN =A1 x QR1 1.40 1.30
(-06. 1.3) 1.20' Al0.5xSIo
+ 0 1.00 0.9 0 -
-0.60 -0.50 -0.40 -0.30 -0.20 -0.10 0.00 0.10 0.20 0.30 0.40 0.50 0.60 ASI Figure 3.3.1-2 Thermal Margin/Low Pressure Trip Setpoint - Part I (AS[ vs. A1 )
Calvert Cliffs 2, Cycle 14 COLR Page 19 of 24 Rev. 0
S(06 0o85)
P Var =2869.5 x (Al) x (QR1) + 17.98 x Tin - 10820 QDNB= Al x QR1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 FRACTION OF RATED THERMAL POWER Figure 3.3.1-3 Thermal Margin/Low Pressure Trip Setpoint - Part 2 (Fraction of Rated Thermal Power vs. QRI)
Calvert Cliffs 2, Cycle 14 COLR 1.2 1.1 1.0 0.9 08 07 0.6 0.5 04 03 0.2 0.1 0.0
,* i.-',1.2)
Page 20 of 24 Rev. 0
LIST OF APPROVED METHODOLOGIES (1)
CENPD-199-P, Rev 1-P-A, "C-E Setpoint Methodology: C-E Local Power Density and DNB LSSS and LCO Setpoint Methodology for Analog Protection Systems," January 1986 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2, 3.2.3, 3.2.5)
(2)
CEN-1 24(B)-P, "Statistical Combination of Uncertainties Methodology Part 1: C-E Calculated Local Power Density and Thermal Margin/Low Pressure LSSS for Calvert Cliffs Units I and II,"
December 1979 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.2, 3.2.3)
(3)
CEN-124(B)-P, "Statistical Combination of Uncertainties Methodology Part 2: Combination of System Parameter Uncertainties in Thermal Margin Analyses for Calvert Cliffs Units 1 and 2,"
January 1980 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.3, 3.2.5)
(4)
CEN-124(B)-P, "Statistical Combination of Uncertainties Methodology Part 3: C-E Calculated Departure from Nucleate Boiling and Linear Heat Rate Limiting Conditions for Operation for Calvert Cliffs Units 1 and 2," March 1980 (Methodology for Specifications 3.1.6, 3.2.1, 3.2.2, 3.2.3, 3.2.5)
(5)
CEN-191(B)-P, "CETOP-D Code Structure and Modeling Methods for Calvert Cliffs Units 1 and 2," December 1981 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.3, 3.2.5)
(6)
Letter from Mr. D. H. Jaffe (NRC) to Mr. A. E. Lundvall, Jr. (BG&E), dated June 24, 1982, Unit 1 Cycle 6 License Approval (Amendment No. 71 to DPR-53 and SER) [Approval to CEN 124(B)-P (three parts) and CEN-191(B)-P)]
(7)
CEN-348(B)-P, "Extended Statistical Combination of Uncertainties," January 1987 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.3, 3.2.5)
(8)
Letter from Mr. S. A. McNeil, Jr. (NRC) to Mr. J. A. Tieman (BG&E), dated October 21, 1987, Docket Nos. 50-317 and 50-318, "Safety Evaluation of Topical Report CEN-348(B)-P, Extended Statistical Combination of Uncertainties" (9)
CENPD-161-P-A, "TORC Code, A Computer Code for Determining the Thermal Margin of a Reactor Core," April 1986 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.3, 3.2.5)
(10)
CENPD-162-P-A, "Critical Heat Flux Correlation of C-E Fuel Assemblies with Standard Spacer Grids Part 1, Uniform Axial Power Distribution," April 1975 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.3, 3.2.5)
(11)
CENPD-207-P-A, "Critical Heat Flux Correlation for C-E Fuel Assemblies with Standard Spacer Grids Part 2, Non-Uniform Axial Power Distribution," December 1984' (Methodology for Specifications 3.3.1, 3.1.6, 3.2.3, 3.2.5)
(12)
CENPD-206-P-A, "TORC Code, Verification and Simplified Modeling Methods," June 1981' (Methodology for Specifications 3.3.1, 3.1.6, 3.2.3, 3.2.5)
(13)
CENPD-225-P-A, "Fuel and Poison Rod Bowing," June 1983 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.3, 3.2.5)
Calvert Cliffs 2, Cycle 14 COLR Page 21 of 24 Rev. 0
(14)
CENPD-266-P-A, "The ROCS and DIT Computer Code for Nuclear Design," April 1983 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2, 3.2.3, 3.2.5)
(15)
CENPD-275-P-A, "C-E Methodology for Core Designs Containing Gadolinia - Urania Burnable Absorbers," May 1988 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2, 3.2.3, 3.2.5)
(16)
CENPD-382-P-A, "Methodology for Core Designs Containing Erbium Burnable Absorbers," August 1993 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2, 3.2.3, 3.2.5)
(17)
CENPD-139-P-A, "C-E Fuel Evaluation Model Topical Report," July 1974 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2)
(18)
CEN-161-(B)-P-A, "Improvements to Fuel Evaluation Model," August 1989 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2)
(19)
CEN-161-(B)-P, Supplement 1-P, "Improvements to Fuel Evaluation Model," April 1986 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2)
(20)
Letter from Mr. S. A. McNeil, Jr. (NRC) to Mr. J. A. Tiernan (BG&E), dated February 4, 1987, Docket Nos. 50-317 and 50-318, "Safety Evaluation of Topical Report CEN-161 (B)-P, Supplement 1-P, Improvements to Fuel Evaluation Model" (Approval of CEN 161(B), Supplement 1-P)
(21)
CEN-372-P-A, "Fuel Rod Maximum Allowable Gas Pressure," May 1990 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2)
(22)
Letter from Mr. A. E. Scherer (CE) to Mr. J. R. Miller (NRC) dated December 15, 1981, LD-81-095, Enclosure 1-P, "C-E ECCS Evaluation Model Flow Blockage Analysis" (Methodology for Specifications 3.2.1, 3.2.2)
(23)
CENPD-132, Supplement 3-P-A, "Calculative Methods for the C-E Large Break LOCA Evaluation Model for the Analysis of C-E and W Designed NSSS," June 1985 (Methodology for Specifications 3.2.1, 3.2.2 and approval of Letter LD-81-095, dated December 15, 1981)
(24)
CENPD-133, Supplement 5, "CEFLASH-4A, a FORTRAN77 Digital Computer Program for Reactor Blowdown Analysis," June 1985 (Methodology for Specifications 3.2.1, 3.2.2)
(25)
CENPD-134, Supplement 2, "COMPERC-II, a Program for Emergency Refill-Reflood of the Core," June 1985 (Methodology for Specifications 3.2.1, 3.2.2)
(26)
Letter from Mr. D. M. Crutchfield (NRC) to Mr. A. E. Scherer (CE), dated July 31, 1986, "Safety Evaluation of Combustion Engineering ECCS Large Break Evaluation Model and Acceptance for Referencing of Related Licensing Topical Reports (Approval of CENPD 133, Supplement 5 and CENPD-134, Supplement 2)
(27)
CENPD-135, Supplement 5-P, "STRIKIN-Il, A Cylindrical Geometry Fuel Rod Heat Transfer Program," April 1977 (Methodology for Specifications 3.2.1, 3.2.2)
Calvert Cliffs 2, Cycle 14 COLR Page 22 of 24 Rev. 0 Calvert Cliffs 2, Cycle 14 COLR Page 22 of 24 Rev. 0
(28)
Letter from Mr. R. L. Baer (NRC) to Mr. A. E. Scherer (CE) dated September 6, 1978, "Evaluation of Topical Report CENPD-135, Supplement 5" (29)
CENPD-137, Supplement I-P, "Calculative Methods for the C-E Small Break LOCA Evaluation Model," January 1977 (Methodology for Specifications 3.2.1, 3.2.2)
(30)
CENPD-133, Supplement 3-P, "CEFLASH-4AS, "A Computer Program for the Reactor Blowdown Analysis of the Small Break Loss of Coolant Accident," January 1977 (Methodology for Specifications 3.2.1, 3.2.2)
(31)
Letter from Mr. K. Kniel (NRC) to Mr. A. E. Scherer (CE), dated September 27, 1977, "Evaluation of Topical Reports CENPD-133, Supplement 3-P and CENPD-137, Supplement 1-P" (32)
CENPD-138, Supplement 2-P, "PARCH, A FORTRAN-IV Digital Program to Evaluate Pool Boiling, Axial Rod and Coolant Heatup," January 1977 (Methodology for Specifications 3.2.1, 3.2.2)
(33)
Letter from Mr. C. Aniel (NRC) to Mr. A. E. Scherer, dated April 10, 1978. "Evaluation of Topical Report CENPD-138, Supplement 2-P" (34)
Letter from Mr. A. E. Lundvall, Jr. (BG&E) to Mr. J. R. Miller (NRC) dated February 22, 1985, "Calvert Cliffs Nuclear Power Plant Unit 1; Docket No. 50-317, Amendment to Operating License DPR-53, Eighth Cycle License Application" (Section 7.3.2 contains Methodology for Specifications 3.1.1 and 3.1.3 and 3.1.6)
(35)
Letter from Mr. D. H. Jaffe (NRC) to Mr. A. E. Lundvall, Jr. (BG&E), dated May 20, 1985, "Safety Evaluation Report Approving Unit 1 Cycle 8 License Application" (36)
Letter from Mr. A. E. Lundvall, Jr. (BG&E) to Mr. R. A. Clark (NRC), dated September 22, 1980, "Amendment to Operating License No. 50-317, Fifth Cycle License Application" (Section 7.1.2 contains Methodology for Specifications 3.1.1, 3.9.1)
(37)
Letter from Mr. R. A. Clark (NRC) to Mr. A. E. Lundvall, Jr. (BG&E), dated December 12, 1980, "Safety Evaluation Report Approving Unit 1, Cycle 5 License Application" (38)
Letter from Mr. J. A. Tiernan (BG&E) to Mr. A. C. Thadani (NRC), dated October 1, 1986, "Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2, Docket Nos. 50-317 &
50-318, Request for Amendment" (Methodology for Specifications 3.1.4)
(39)
Letter from S. A. McNeil, Jr. (NRC) to Mr. J. A. Tiernan (BG&E), dated July 7, 1987, Docket Nos. 50-317 and 50-318, Approval of Amendments 127 (Unit 1) and 109 (Unit 2)
(Support for Specification 3.1.4)
(40)
CENPD-188-A, "HERMITE: A Multi-Dimensional Space-Time Kinetics Code for PWR Transients," July 1976 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2, 3.2.3, 3.2.5)
Calvert Cliffs 2, Cycle 14 COLR Page 23 of 24 Rev. 0
(41)
The power distribution monitoring system referenced in various specifications and the BASES, is described in the following documents:
- i.
CENPD-153-P, Revision 1-P-A, "Evaluation of Uncertainty in the Nuclear Power Peaking Measured by the Self-Powered, Fixed Incore Detector System," May 1980 (Methodology for Specifications 3.3.1, 3.1.6, 3.2.1, 3.2.2, 3.2.3, 3.2.5) ii.
CEN-1 19(B)-P, "BASSS, Use of the Incore Detector System to Monitor the DNB LCO on Calvert Cliffs Unit 1 and Unit 2," November 1979 (Referenced in Appendix B of Unit 2 Cycle 9 License Application) iii.
Letter from Mr. G. C. Creel (BG&E) to NRC Document Control Desk, dated February 7, 1989, "Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50 318, Request for Amendment, Unit 2 Ninth Cycle License Application" (Appendix B contains Methodologies for Specifications 3.1.4, 3.2.2, 3.2.3, 3.2.5) iv.
Letter from Mr. S. A. McNeil, Jr. (NRC) to Mr. G. C. Creel (BG&E), dated January 10, 1990, "Safety Evaluation Report Approving Unit 2 Cycle 9 License Application" (42)
Letter from Mr. D. G. McDonald, Jr. (NRC) to Mr. R. E. Denton (BGE), dated May 11, 1995, "Approval to Use Convolution Technique in Main Steam Line Break Analysis Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (TAC Nos. M90897 and M90898)"
(Methodology for Specification 3.2.3).
(43)
CENPD-387-P-A, Latest Approved Revision, "ABB Critical Heat Flux Correlations for PWR Fuel" (44)
CENPD-199-P, Supplement 2-P-A, Appendix A, Latest Approved Revision, "CE Setpoint Methodology," June 1998.
Calvert Cliffs 2, Cycle 14 COLK Page 24 of 24 Rev 0 Calvert Cliffs 2, Cycle 14 COLR Page 24 of 24 Rev 0