ML030730278

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Rochester Gas and Electric Corporation (Rg&E) Ginna Re Nrc'S Annual Assessment of the Safety Performance at the R. E. Ginna Nuclear Power Plant for the Period of January 1, 2002 Through December 31, 2002
ML030730278
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/14/2003
From: James Trapp
Reactor Projects Branch 1
To:
Shared Package
ML030620063 List:
References
03-014
Download: ML030730278 (4)


Text

March 14, 2003 U.S. NUCLEAR REGULATORY COMMISSION REGION I No.03-014 NOTICE OF LICENSEE MEETING Licensee: Rochester Gas and Electric Corporation (RG&E)

Facility: R.E. Ginna Nuclear Power Plant Docket No. 50-244 Time and Date: 1:00 p.m. on April 2, 2003 Location: Ontario Golf Club 2101 Country Club Lane Ontario, NY 14519

Purpose:

The NRC staff and RG&E management will discuss the results of NRCs annual assessment of the safety performance at the R.E. Ginna Nuclear Power Plant for the period January 1, 2002 through December 31, 2002.

An annual meeting to discuss plant performance is a requirement of NRC Inspection Manual 0305, Operating Reactor Assessment Program.

NRC Attendees: A. Randolph Blough, Director, Division of Reactor Projects, Region I J. Trapp, Chief, Branch 1, Division of Reactor Projects, Region I K. Kolaczyk, Senior Resident Inspector, Ginna Licensee Attendees: R. Mecredy, Vice President - Nuclear Operations J. Widay, Vice President, Plant Manager T. Marlow, Department Manager, Nuclear Engineering Services R. Watts, Department Manager, Nuclear Training

2 NOTE: This meeting is open to the public for observation (Category 1 meeting in accordance with NRCs Public Meeting Policy). The NRC staff will be available at the end of the meeting to answer questions from the public. The NRC encourages public participation by observation of this annual safety performance assessment meeting and by providing questions and comments to the NRC staff following the meeting either in person or in writing. Comments can be provided to James M. Trapp, Chief, Reactor Projects Branch 1, Division of Reactor Projects (610-337-5186 E-mail JMT1@nrc.gov) or at the following address:

US Nuclear Regulatory Commission - Region I 475 Allendale Road King of Prussia, PA 19406-9866 Information relative to this annual safety performance assessment meeting and the Annual Assessment Letter can be found at website addresses:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/GINN/ginn_chart.html Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known no later than two business days prior to the meeting.

/RA/

Approved by: ____________________________

James M. Trapp, Chief Projects Branch 1 Division of Reactor Projects

3 Distribution:

Robert C. Mecredy, Vice President, Nuclear Operations P. Wilkens, President, Rochester Gas and Electric P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, State of New York, Department of Law N. Reynolds, Esquire W. Flynn, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority D. Stenger, Ballard Spahr Andrews and Ingersoll. LLP T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network J. Trapp, DRP N. Perry, DRP Regional Administrator, Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist NRC Resident Inspector Region I Docket Room (w/concurrences)

State of New York

4 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

W. Kane, Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

S. Collins, Director, Office of Nuclear Reactor Regulation, NRR C. Grimes, Director, Division of Regulatory Improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR F. Congel, Director, Office of Enforcement Deputy Director, Office of Nuclear Regulatory Research (NRR/OD)

J. Zwolinski, Director, Division of Licensing Project Management T. McGinty, RI EDO Coordinator, OEDO R. Laufer, Project Directorate I-1 (PD1/2), NRR R. Clark, NRR P. Milano, NRR, (Backup)

W. Lanning, DRS R. Crlenjak, DRS D. Screnci, Public Affairs, RI N. Sheehan, Field. Public Affairs Officer, RI R. Bores, ORA K. Kolaczyk, SRI - Ginna B. Fuller - Acting SRI - Ginna PMNS WEBWORK OEWEB OEMAIL DOCUMENT NAME: G:\Branch1\\2003 Annual Assessment Meetings\Ginna Annual Assessment Meeting Notice.WPD After declaring this document An Official Agency Record it will/will not be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP N NAME NPerry/NSP JTrapp/JT DATE 03/14/03 03/14/03 OFFICIAL RECORD COPY