Meeting Handouts for Palo Verde to Present the Status of Its Programs for Dry Cask Storage, Core Reactivity Management, and Fuel Performance for the Three UnitsML030710616 |
Person / Time |
---|
Site: |
Palo Verde ![Arizona Public Service icon.png](/w/images/9/93/Arizona_Public_Service_icon.png) |
---|
Issue date: |
03/12/2003 |
---|
From: |
Donohew J NRC/NRR/DLPM/LPD4 |
---|
To: |
|
---|
References |
---|
Download: ML030710616 (17) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23090A1392023-04-0404 April 2023 April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017) ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19192A0972019-07-11011 July 2019 License Amendment Request for Emergency Plan, July 11, 2019 ML18299A0722018-09-26026 September 2018 Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their Families ML17320A1932017-11-15015 November 2017 NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML16357A6872016-12-20020 December 2016 One-Time License Amendment Request Unit 3 Train B Diesel Generator ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13308C3402013-11-0404 November 2013 SG Unit 3 Telephone Call ML13025A2832013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Palo Verde ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12243A4382012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT Vs Rt Discussion ML12243A4472012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT in Lieu of Rt for Nuclear Power Plant Applications ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML11188A0722011-07-0606 July 2011 NRC Meeting with NEI and Licensees June 28, 2011 Workshop Engineering Approach Rev F 2024-02-07
[Table view] |
Text
NRC FORM 658 U.S. NUCLEAR REGULATORY COMMISSION (9-1999)
TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed orhand-printed)by the person who announcedthe meeting (i.e., the person who issued the meeting notice). The completed form, and the attached copy of meeting handout materials,will be sent to the Document Control Desk on the same day of the meeting; under no circumstances will this be done later than the working day after the meeting.
Do not include proprietarymaterials.
DATE OF MEETING The attached document(s), which was/were handed out in this meeting, is/are to be placed 03/12/2003 in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:
Docket Number(s) STN 50-528, STN 50-529, and STN 50-530 Plant/Facility Name Palo Verde Nuclear Generating Station TAC Number(s) (ifavailable) None.
Reference Meeting Notice Notice dated 02/25/2003 (ADAMS ML030520009)
Purpose of Meeting (copy from meeting notice) The licensee requested the meeting to present the status of its programs for dry cask storage, core reactivity management, and fuel performance for the three units.
NAME OF PERSON WHO ISSUED MEETING NOTICE TITLE Jack N. Donohew Senior Project Manager OFFICE Office of Nuclear Reactor Regulation DIVISION Division of Licensing Project Management BRANCH Project Directorate IV Distribution of this form and attachments:
Docket File/Central File PUBLIC NRC FORM 658 (9-1999) PRINTED ON RECYCLED PAPER This form was designed using InForms
Nuclear Fuel Update Palo Verde Nuclear Generating Station March 12, 2003 Meeting with US NRC sy/
A!aýw Review of 2002 May 2002 Meeting with NRR Review of Unit 2 Cycle 11 CENTS Implementation Clad Performance Strategy CEA Investigation Dry Cask Storage Update 2
1
Agenda Today
+ Reactivity Management
+ Fuel Performance
- Dry Cask Storage Update Reactivity Management
+ Palo Verde Actions
Overview
- Reactivity Management AFI
"*REACTOR ENGINEERING
"*OPERATIONS Palo Verde Actions
- NFM/Operations/Training Interface
- Operations Single Point of Contact
- Xenon Program
+ Training 6.,,* .
3
Results
+ Standardized Game Plans
+ Improved Inter-Departmental Relationships
- Improved Tools 7 __~imnlm CENTS, RSG, U2 Uprate
- CENTS Implementation Status
CENTS Implementation Status
- U1, U2 Complete - U3 April 2003
- SABD Revision 20% Complete
- SGTR + LOP + SF
- Long Term FWLB (PSV Operability)
U2 RSG & Power Uprate
- Draft SER 3131 -- Final SER 6/30
- SABD Supplement In Progress
- U2C12 Reload Safety Analyses Begun
- Actively Participating in Development of SG Startup Test Program 5
Fuel Performance
- Integrated Fuel Clad Strategy:
- Advanced Clad Alloys
- Primary Chemistry
- CRUD/Oxide Software
- Low Duty Core Designs
+ Long Range Fuel Inspection Plan IOi Advanced Clad Alloys
- Westinghouse Decision: Low Tin Zirlo
- Alloy A LTA in U3C10 (Spring 2003)
- First Batches of Standard Zirlo &
Columbia Fuel Rod
- U2C11, UICll (2002)
- U3ClI In April 2003
- Fuel Handling Accident Rod Pressure 12 6
Primary Chemistry
- Additional RCS Cleaning at EOC Shutdown
+ Early Lithium Injection During Startups
+ Elevated-Coordinated Lithium Strategy
- Currently 7.1 pH
- Hold Until Inconel Corrosion Issue Resolved 13 CRUD/Oxide Software
- Steaming Rate in Core Design Tools
- Screen Patterns Against U3C9 Benchmark
+ APS CRUD/Oxide Model
- Nodal Level/High Duty Ass'y Rod Level
- Vendor Fuel Duty Model
- Safety Grade Oxide and FDI Calculations 14 7
Low Duty Core Designs
- 104 vs 96 Assemblies
- UICIO Visuals of PIM316
- U2 Uprate Corrosion Strategy
- Zirlo Clad
- Re-design Lattice Pattern
~A Re-Designed Lattice
- 2 Enrichments
- 12 High Enrichment Rods on Each Face
+ New Lattice
- 3 Enrichments
- Same Assembly Average Enrichment
- All Peripheral Rods Low Enrichment
- Extensive Design Review 16 8
Long Range Fuel Inspection Plan
- Unit 2, Beginning Fall 2003 Oxidation (R11, R12, R13)
SZirlo
- Lithium 3.5 PPM (R11, R12)
- Higher Burnup Leakers 17~
CPC Replacement
CPC Replacement Overview
- Upgrade to Modern Hardware
- 8 CEA Calculators
- Concurrent Software Language Change
+ Preserve Original Functionality & Timing
- First Installation - Fall 2003 Outage 19 CPC Replacement Licensing
- SER on Westinghouse Common-Q
- No Impact to Safety & Uncertainty Analyses
- PVNGS Supports Joint Meeting 20 10
CEA Replacement
- Determination of New, Conservative Lifetime
- Design of New Replacement CEAs
+ Replacement of PLCEAs 21 Review of CEA History
+ CEA Finger Failures Observed - 2001
- Cracks in High Fluence CEA Tips
- Root Cause - IASCC, Inadequate Testing
- U2/U3 With Small Pellet Less Severe
+ All Full Length CEAs Replaced
- Replaced by Design with Smallest Pellet
- Lifetime Software Abandoned 22 I1
Determination of New Lifetime
- Investigating Various Options
- Monitoring YGN Inspections
- Inconel IASCC Threshold
- Vendor Has Adjusted Software 23 Design of New CEAs
+ Now: Unique Feltmetal Design
+ Want: Industry Standard AglnCd Tips
+ Tip Region Extended 4 Inches
- Hollow AgInCd Slugs 24 B' L 12
Replacement of PLCEAs
- Part Length, Part Strength
- Not Subject to Same Failure Mode
- Reviewing Design Bases
- Full Length, Part Strength
- Transparent to Safety Analysis
- Tech Spec Change Required 13
Dry Cask Storage Update
- Loaded 24 assemblies in first canister March 3
- Shield lid welded March 6
- Completed first vacuum drying period March 8
- March 10 will start 2nd vacuum drying period
- Capturing lessons learned from first loading 26
Fuel Loading Schedule
- Complete first canister loading in March, 2003
- Time out for Unit 3 Refueling outage, ends early May, 2003
- Complete Unit 2 campaign in June
- Load 5 casks in Unit 1 later in 2003
- Plan to load 10 casks per year 27
4 0
a 0
u)
E~
0 U 0 E - 4.
E E 4
> sm UNIONS
-0 C.
I O MIN-0 M SO 0o c'