ML030660012

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan - Vogtle Electric Generating Plant, 03/01/03 - 03/31/04
ML030660012
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/04/2003
From:
NRC/RGN-II/DRP/RPB2
To:
Shared Package
ML030660007 List:
References
Download: ML030660012 (2)


Text

Page 1 of 2 Vogtle 03/04/2003 07:53:33 Inspection / Activity Plan Report 22 03/01/2003 - 03/31/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - EXAM RETAKE 2 1 V23221 VOGTLE/RETAKE EXAMS AT POWER FACILITIES 05/05/2003 05/09/2003 Not Applicable OL EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 06/16/2003 06/20/2003 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 06/16/2003 06/20/2003 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/16/2003 06/20/2003 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/16/2003 06/20/2003 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/16/2003 06/20/2003 Baseline Inspections PS-SEC - SECURITY - TI/ICM 3 1, 2 IP 2515/148 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures 06/16/2003 06/20/2003 Safety Issues PS-RP - RADIATION PROTECTION 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/28/2003 08/01/2003 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/28/2003 08/01/2003 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/28/2003 08/01/2003 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 07/28/2003 08/01/2003 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/28/2003 08/01/2003 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification 08/04/2003 08/08/2003 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 1, 2 IP 7111121 Safety System Design and Performance Capability 09/08/2003 09/12/2003 Baseline Inspections 2515/150 - 2515/150 REV1 UNIT 1 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 09/22/2003 09/26/2003 Safety Issues EB2-ISI - INSERVICE INSPECTION-U1 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/29/2003 10/03/2003 Baseline Inspections BR2-FP - FLOOD PROTECTION 1 1, 2 IP 7111106 Flood Protection Measures 11/03/2003 11/07/2003 Baseline Inspections EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI 5 1, 2 IP 7111121 Safety System Design and Performance Capability 11/03/2003 11/07/2003 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 11/17/2003 11/21/2003 Baseline Inspections PS-RP - RADIATION PROTECTION-@ENV LAB 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program 11/19/2003 11/21/2003 Baseline Inspections EB2-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 01/12/2004 01/16/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Vogtle 03/04/2003 07:53:33 Inspection / Activity Plan Report 22 03/01/2003 - 03/31/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-MR - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 02/09/2004 02/13/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.