ML030650710
| ML030650710 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/21/2003 |
| From: | Sharon Bennett Entergy Nuclear Operations |
| To: | Alexion T NRC/NRR/DLPM/LPD4 |
| Alexion T W, NRR/DLPM, 415-1326 | |
| Shared Package | |
| ML030640090 | List: |
| References | |
| Download: ML030650710 (5) | |
Text
[ ThomasAlexion - Draft Response to NRC RAI on the November 22, 2002 ANO-2 SG ISI submittal From:
To:
Date:
Subject:
"BENNETT, STEVE A" <SBENNE2@entergy.com>
Tom Alexion <twa@nrc.gov>
2/21/03 10:33AM Draft Response to NRC RAI on the November 22, 2002 ANO-2 SG ISI submittal
- Tom, See attached information on the Draft RAI Response steve CC:
"MEATHEANY, DANIEL J" <DMEATHE@entergy.com>
Page 1
DRAFT Request for Additional Information Request to Modify Steam Generator (SG) Tube Inspection Frequency Arkansas Nuclear One, Unit 2 (ANO-2)
NRC RAI 1.
The licensee located and removed a loose part approximately 12 inches above the cold leg tubesheet in the "B" SG. Were any loose parts left in service? If so, summarize the basis, including any analysis performed, for the conclusion that these loose parts will not cause unacceptable wear before the next scheduled inspection (2R17)?
ANO Response There were no other loose parts identified. A 100 % bobbin inspection was performed in both generators. The only loose part identified was the one mentioned above which was removed.
Visual inspections were also performed in both generators along the annulus and the tube lanes.
No other foreign material was identified.
NRC RAI 2 Table 1 of the November 22, 2002, letter indicates that 271 special interest inspections were conducted. Please describe the results of these inspections. (The staff assumes that some of the results in Table 2 arose from the special interest inspections; however, a one-to-one comparison cannot be made.)
ANO Response Table 1 2R15 Eddy Current (ECT) Inspection Scope ECT Examination Type, Inspections Conducted
% Scope A
B Bobbin 10637 10636 Note 1 100 U-bend Plus Point 1&2 181 181 100 Special Interest 128 143 Note 1 One tube was plugged during fabrication due to an equipment failure. An inconel-690 welded plug was installed in both ends of the tube.
Upon review of the database, it was determined that the numbers specified in Table 1 were incorrect in Entergy's November 22, 2002 submittal [The information was improperly transcribed from the preservice inspection and what was significantly higher than the actual 2R15 data]. There were no tests performed that resulted in confirmed indications other than those associated with the loose part and wear at the AVB. The actual special interest inpsections requested in RAI-2 are properly detailed below in Table 2. Instead of "special interest", the more appropriate subject would be bobbin I-codes, which could result in degradation based on confirmation with the plus point.
DRAFT Table 2 2R15 Eddy Current Special Interest ECT Examination Type Inspections Conducted A
B Non-Quantifiable Indication (NQI) 9 5
Distorted Support Indication (DSI) 2 0
Distorted Freespan Indication 4
6 (DFI)
Bobbin I-Codes (Total) 15 11 NRC RAI 2 The licensee indicates that SGs such as those at DC Cook, Farley, and South Texas have not experienced large amounts of wear. The licensee also indicates that these SGs are similar in design to the ANO-2 SGs.
- a. Provide details explaining the similarities and differences between the ANO-2 SGs and the SGs at the referenced plants.
ANO Response:
The new DC Cook 2, Farley 1 & 2, South Texas 1 and ANO-2 steam generators are all Westinghouse designed. All contain Alloy 690 TT tubing with true U-bends and anti-vibration bars for support in the upper bundle. The original ANO-2 generators were CE designed with square bends and 3 /4th inch diameter Alloy 600 mill annealed tubes. All plants were hydraulically expanded full depth in the tubesheet. The following is a summary of the plant information:
Tilhcs nlmmn~indn Cook2 W54F Farleyl W54F Farley2 W54F S Texas WD94 ANO2 WD109 690TT 690TT 690TT 690TT 690TT 0.875 x 0.050 0.875 x 0.050 0.875 x 0.050 0.687 x 0.040 0.687 x 0.040
- b. What process is in place to gain relevant industry operating experience that may affect the operational assessment of ANO-2 during the proposed extended inspection interval?
Response
All of the plants mentioned above are members of the EPRI Technical Advisory Group (TAG). The TAG meets about 3 times a year where industry relevant information is discussed. Additionally, blas9 Broached Broached Broached Broached Broached SS405 SS405 SS405 SS508 SS405 a"
W
ý 011 4
Support plate Support Material RA*rI*I
DRAFT ANO's industry events department tracks and communicates relevant information to the appropriate departments.
'-- -...-
------
-- ',-.,
-
[*C-\\WINDOWS\\TEM P\\GWIO0001.TMP Mail Envelope Properties (3E5646D4.2AC:18 :62124)
Subject:
Creation Date:
From:
Created By:
Draft Response to NRC RAI on the November 22, 2002 ANO-2 SG ISI submittal 2/21/03 10:34AM "BENNETT, STEVE A" <SBENNE2 @entergy.com>
SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFNDO TWA (Thomas Alexion) entergy.com DMEATHE CC (MEATHEANY, DANIEL J)
Post Office owf4_po.OWFNDO Files MESSAGE Part.001 SG ISI RAI Response.doc Mime.822 Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
Route nrc.gov entergy.com Date & Time 02/21/03 10:34AM Size 67 766 48128 68441 None Standard No None No Standard Page 1 I CAWINDOWSUEMP\\GW100001 -TMP