Brunswick Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/04/2003 11:27:10 Report 22 1
EB1
- POWER UPRATE INSPECTION Supplemental Program 03/10/2003 03/14/2003 Power Uprate IP 71004 1, 2 2
PS-RP
- RADIATION PROTECTION Baseline Inspections 03/10/2003 03/14/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/10/2003 03/14/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/10/2003 03/14/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/10/2003 03/14/2003 Performance Indicator Verification IP 71151 1, 2 1
EB2-ISI
- INSERVICE INSPECTION-U2 Baseline Inspections 03/17/2003 03/21/2003 Inservice Inspection Activities - BWR IP 7111108G 2
2 PS-RP
- RADIATION PROTECTION Baseline Inspections 03/24/2003 03/28/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/24/2003 03/28/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/24/2003 03/28/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/24/2003 03/28/2003 Performance Indicator Verification IP 71151 1, 2 1
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 07/07/2003 07/11/2003 Safety System Design and Performance Capability IP 7111121 1, 2 6
EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI Baseline Inspections 08/11/2003 08/15/2003 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 08/25/2003 08/29/2003 Safety System Design and Performance Capability IP 7111121 1, 2 1
EB2-MR
- MAINTENANCE RULE Baseline Inspections 10/14/2003 10/17/2003 Maintenance Effectiveness IP 7111112B 1, 2 3
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 11/03/2003 11/07/2003 Identification and Resolution of Problems IP 71152 1, 2 Baseline Inspections 11/17/2003 11/21/2003 Identification and Resolution of Problems IP 71152 1, 2 1
- EP INSPECTION Baseline Inspections 12/01/2003 12/05/2003 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Performance Indicator Verification IP 71151 1, 2 2
- REQUAL INSPECTION Baseline Inspections 12/01/2003 12/05/2003 Licensed Operator Requalification IP 7111111B 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.