Inspection/Activity Plan 03/01/03 - 03/31/04 for H. B. Robinson
ML030650351
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/04/2003
From: Fredrickson P
NRC/RGN-II/DRP/RPB4
To: Moyer J
Carolina Power & Light Co
Shared Package
ML030650340 List:
References
IR-03-001
Download: ML030650351 (1)


Text

Page 1 of 1 Robinson 03/04/2003 09:00:32 Inspection / Activity Plan Report 22 03/01/2003 - 03/31/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1SSDPC - SAFETY SYS DESIGN & PERFMANCE CAPABILI 6 2 IP 7111121 Safety System Design and Performance Capability 03/10/2003 03/14/2003 Baseline Inspections LIC RENE - FIRST LICENSE RENEWAL INSPECTION 5 2 IP 71002 License Renewal Inspection 03/31/2003 04/04/2003 Other Routine PS-SEC - SECURITY - TI/ICM 3 2 IP 2515/148 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures 05/19/2003 05/23/2003 Safety Issues LIC RENE - SECOND LICENSE RENEWAL INSPECTION 4 2 IP 71002 License Renewal Inspection 06/09/2003 06/27/2003 Other Routine PS-RP - RAD PROTECTION - ONSITE PREP AND ISFSI 1 2 IP 7112101 Access Control to Radiologically Significant Areas 07/14/2003 07/16/2003 Baseline Inspections PS-RP - RADIATION PROTECTION 3 2 IP 7112101 Access Control to Radiologically Significant Areas 08/18/2003 08/22/2003 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/18/2003 08/22/2003 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/18/2003 08/22/2003 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program 08/18/2003 08/22/2003 Baseline Inspections 2 IP 71151 Performance Indicator Verification 08/18/2003 08/22/2003 Baseline Inspections OL EP - EMERGENCY EXERCISE 2 2 IP 7111401 Exercise Evaluation 10/07/2003 10/10/2003 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/07/2003 10/10/2003 Baseline Inspections 2 IP 71151 Performance Indicator Verification 10/07/2003 10/10/2003 Baseline Inspections EB2-ISI - INSERVICE ISPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/08/2004 03/12/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.