SuTHERN CALIFORNIA A. Edward Scherer EDISOManager of Nuclear Regulatory Affairs An EDISON INTERNATIONAL Company March 3, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Southern California Edison Response to NRC Order Issued February 11, 2003, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors San Onofre Nuclear Generating Station, Units 2 and 3
Reference:
NRC Order issued February 11, 2003, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.
Dear Sir or Madam,
The Southern California Edison (SCE) Company consents to the referenced NRC Order establishing interim inspection requirements for reactor pressure vessel heads at pressurized water reactors for San Onofre Nuclear Generating Station (SONGS)
Units 2 and 3. At this time SCE is evaluating the need to submit relaxation requests as provided for in Section IV.F of the Order.
If you have any questions or need additional information regarding this matter, please feel free to contact Mr. Jack Rainsberry at (949) 368-7420.
Sincerely, cc:
E. W. Merschoff, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2, and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.0 Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575
State of California County of San Diego Subscribed and sworn to (or affirmed) before me this "3 CL-day of k A QU~AC-2003