AM ;
A subsidiary of Pinnacle West Capital Corporation David M. Smith Operations Director Palo Verde Nuclear Generating Station Tel. 602-393-2656 Fax 602-393-1806 e-mail:
David M Smith(aapsc.com Mail Station 7294 PO Box 52034 Phoenix, Arizona 85072-2034 February 13, 2003 219-02836-DMS/JMM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JANUARY 2003 Enclosed are the Monthly Operating Reports for JANUARY 2003, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.
If you have any questions, please contact Judy Mellody at (623) 393-6422.
DMS/JMM/mb
Enclosures:
Sincerely, JANUARY 2003 Monthly Operating Reports cc:
E. W. Merschoff PVNGS Resident Inspector INPO Records Center Utility Data Institute (all w/enclosures)
L
'r
Page Two NRC Monthly Operating Report Distribution List 219-02836-DMS/JMM February 13, 2003 bcc:
J. E. Orsborn D. M. Smith M. Van Dop J.
Simpkins D. L. Sills G. R. Overbeck File Copy C. D. Mauldin M. K. Banks C. R. Emmett D. G. Marks C. K. Seaman B. J. Hansen C. L. Jury J. E. McDonald S. M. Foote J. M. Levine W. L. Stewart (3146) (all w/enclosures)
(7294)
(7512)
(7512)
(7565)
(7602)
(7602)
(7605)
(7615)
(7615)
(7636)
(7636)
(7693)
(8983)
(8508)
(8508)
(9046)
(9082)
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Reporting Period:
50-528 PVNGS-1 02/11/03 J. M. Mellody (623) 393-6422 January 2003
- 1.
Design Electrical Rating (Net MWe):
1265
- 2.
Maximum Dependable Capacity (Net MWe):
1243
- 3.
- 4.
- 5.
6.
Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 744.0 114,905.2 Hours Generator was On-Line 744.0 744.0 113,527.4 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 922,284 922,284 136,590,868 UNIT SHUTDOWNS Reason 2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of January 2003.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
1 -
No.
Date Outage Duration Hours Type 1 1F-Forced S-Scheduled
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-529 PVNGS-2 02/11/03 J. M. Mellody (623) 393-6422 Reporting Period:
January 2003
- 1.
Design Electrical Rating (Net MWe):
1265
- 2.
Maximum Dependable Capacity (Net MWe):
1243 Unit 2 Generating Statistics This Month Yr. To Date Cumulative
- 3.
Hours Reactor was Critical 744.0 744.0 114,655.5
- 4.
Hours Generator was On-Line 744.0 744.0 113,323.6
- 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6.
Net Electrical Energy Generated (MWh) 946,489 946,489 137,890,170 UNIT SHUTDOWNS Outage Duration Method of Shutting Down No.
Date TypeI Hours Reason 2 Rel No reactor shutdowns occurred during the month of January 2003.
actor3 Cause and Corrective Action to Prevent Occurrence 2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- IF-Forced S-Scheduled
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Reporting Period:
50-530 PVNGS-3 02/11/03 J. M. Mellody (623) 393-6422 January 2003
- 1.
Design Electrical Rating (Net MWe):
1269
- 2.
Maximum Dependable Capacity (Net MWe):
1247
- 3.
- 4.
- 5.
6.
UNIT SHUTDOWNS Reason2 Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of January 2003.
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)
SUMMARY
- Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 744.0 110,927.7 Hours Generator was On-Line 744.0 744.0 109,939.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 950,655 950,655 134,457,814 No.
Date Outage Duration Hours Type' 1F-Forced S-Scheduled I 1 -1