Letter Sequence Other |
---|
|
|
MONTHYEARML0232204442003-01-0202 January 2003 Environmental Assessment & Finding of No Significant Impact Related to License Amendment Request to Change Appendix B Project stage: Other ML0306207972003-04-0404 April 2003 License Amendments, Revision to Appendix B Project stage: Other ML0313501872003-05-22022 May 2003 Issuance of Amendments, the Amendments Revise Appendix B, Environmental Protection Plan. Project stage: Approval ML0313501702003-05-22022 May 2003 Correction to Issuance of Amendments Revision to Appendix B Project stage: Approval 2003-04-04
[Table View] |
Similar Documents at Byron |
---|
Category:Letter
MONTHYEARML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion 2024-09-06
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML22305A6992022-12-28028 December 2022 Issuance of Amendment Nos. 231 and 231 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22210A0312022-08-30030 August 2022 Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22145A5862022-06-0303 June 2022 R. E. Ginna Correction to Pages Issued for Amendments Nos. 225, 225, 227, 227, & 148, Respectively, Regarding Issues Identified in Westinghouse Documents ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22115A2122022-05-12012 May 2022 Summary of April 11, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding a Future Amendment to Place One High Burnup Lead Test Assembly Into the Byron, Unit 2, Reactor ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22098A0512022-04-11011 April 2022 2 Cycle 25 High Burnup Lead Test Assembly NRC Pre-Submittal Meeting on April 22, 2022 (EPID L-2022-LRM-0022) (Slides) ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21054A0082021-03-10010 March 2021 Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML20246G8652020-09-21021 September 2020 Issuance of Amendment Nos. 222 and 222 One-Time Extension of Unit No. 2 Steam Generator Inspections (COVID-19) ML20163A0462020-09-18018 September 2020 Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20149K6982020-09-10010 September 2020 Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications ML19190A0812019-08-28028 August 2019 Issuance of Amendments Regarding Limiting Condition of Operation for Inoperability of Snubbers ML19170A3112019-06-19019 June 2019 Redacted Braidwood Station, Units 1 & 2, and Byron Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Appendix 5.1 (Public Version Pages 1-76 and 129-287) ML19168A2162019-06-17017 June 2019 Redacted Byron Station, Units 1&2, Amendment 28 to Fire Protection Report, Chapter 2.4, Safe Shutdown Analysis (Public Version Pages 1-20 and 1626-1643) RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML19038A0172019-04-0303 April 2019 Issuance of Amendment No. 207 Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML18302A2272018-12-12012 December 2018 Issuance of Amendments No. 200 and 205 Regarding Axial Flux Difference Technical Specifications ML18264A0922018-10-22022 October 2018 Issuance of Amendment Nos. 198, 198, 204, and 204, Respectively, Regarding Adoption of Title 10 of the Code of Federal Regulations Section 50.69 CAC Nos. MG0201, MG0202, MG0203, and MG0204; EPID-L 2017-LLA-0285) ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18065A5292018-06-27027 June 2018 Issuance of Amendments Regarding Clarification of Rod Position Requirements (CAC Nos. MF9951-9954; EPID L-2017-LLA-0249) ML18067A1812018-06-0404 June 2018 Correction to Technical Specification Amendment Identification Format ML18054B4362018-04-30030 April 2018 Issuance of Amendments Regarding Control Room Ventilation Temperature Control System (CAC Nos. MF9932, MF9933, MF9934, and MF9935; EPID L-2017-LLA-0247) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17188A1552017-08-10010 August 2017 Issuance of Amendments Regarding Use of Tormis for Assessing Tornado Missile Protection ML17088A7032017-07-0505 July 2017 Issuance of Amendments to Regarding Request to Delete Obsolete License Conditions and Make Administrative Changes to Technical Specifications (CAC Nos. MF9338-MF9341) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML16180A2512016-08-0101 August 2016 Issuance of Amendments Regarding Use of Optimized Zirlo as Fuel Cladding Material ML15307A7762015-12-21021 December 2015 Braidwood - Issuance of Amendments Regarding Installation of New Low Degraded Voltage Relays and Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses (CAC Nos. MF4051 - MF4054) ML15293A5892015-12-17017 December 2015 Issuance of Amendments Regarding Diesel Generator Load Rejection Surveillance Requirement ML15280A2972015-11-30030 November 2015 Bryon Station, Unit Nos. 1 and 2 - Issuance of Amendments 2024-05-23
[Table view] Category:Safety Evaluation
MONTHYEARML24194A0222024-07-22022 July 2024 Issuance of Relief Proposed Alternative Request Associated with Pressurizer Examinations ML24131A0072024-06-20020 June 2024 Authorization and Safety Evaluation for Alternative Request No. I4R-24 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code ML23241A9092023-09-19019 September 2023 Enclosure 2 - Non-Proprietary - Review of License Renewal Commitment Number 10 Safety Evaluation ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML22305A6992022-12-28028 December 2022 Issuance of Amendment Nos. 231 and 231 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) ML22210A0312022-08-30030 August 2022 Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21076A3712021-08-17017 August 2021 Approval of Certified Fuel Handler Training and Retraining Program ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) ML21166A1682021-06-25025 June 2021 ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21054A0082021-03-10010 March 2021 Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20246G8652020-09-21021 September 2020 Issuance of Amendment Nos. 222 and 222 One-Time Extension of Unit No. 2 Steam Generator Inspections (COVID-19) ML20163A0462020-09-18018 September 2020 Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20149K6982020-09-10010 September 2020 Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19190A0812019-08-28028 August 2019 Issuance of Amendments Regarding Limiting Condition of Operation for Inoperability of Snubbers ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19038A0172019-04-0303 April 2019 Issuance of Amendment No. 207 Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements ML19035A2942019-02-25025 February 2019 Relief from the Requirements of the ASME Code ML18302A2272018-12-12012 December 2018 Issuance of Amendments No. 200 and 205 Regarding Axial Flux Difference Technical Specifications ML18264A0922018-10-22022 October 2018 Issuance of Amendment Nos. 198, 198, 204, and 204, Respectively, Regarding Adoption of Title 10 of the Code of Federal Regulations Section 50.69 CAC Nos. MG0201, MG0202, MG0203, and MG0204; EPID-L 2017-LLA-0285) 2024-07-22
[Table view] |
Text
April 4, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS (TAC NOS. MB6389 AND MB6390)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 132 to Facility Operating License No. NPF-37 and Amendment No. 132 to Facility Operating License No. NPF-66 for the Byron Station, Unit Nos. 1 and 2, respectively. The amendments are in response to your application dated September 27, 2002.
The amendments revise Appendix B, Environmental Protection Plan (Non-Radiological), of the licenses to remove a parenthetical reference to a superseded section of 10 CFR Part 51.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Mahesh Chawla, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-455
Enclosures:
- 1. Amendment No. 132 to NPF-37
- 2. Amendment No. 132 to NPF-66
- 3. Safety Evaluation cc w/encls: See next page
Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON NUCLEAR POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS (TAC NOS. MB6389 AND MB6390)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 132 to Facility Operating License No. NPF-37 and Amendment No. 132 to Facility Operating License No. NPF-66 for the Byron Station, Unit Nos. 1 and 2, respectively. The amendments are in response to your application dated September 27, 2002.
The amendments revise Appendix B, Environmental Protection Plan (Non-Radiological), of the licenses to remove a parenthetical reference to a superseded section of 10 CFR Part 51.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Mahesh Chawla, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-455
Enclosures:
- 1. Amendment No. 132 to NPF-37
- 2. Amendment No. 132 to NPF-66
- 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC RDennig, (DRIP/RORP)
PD3-2 r/f OGC, O15B18 AMendiola ACRS, T2E26 MChawla GDick GHill (4), T5C3 PCoates AStone, RIII ADAMS Accession Number: ML030620797 *see previous concurrences OFFICE PM:LPD3-2 LA:LPD3-2 OGC SC:LPD3-2 NAME MChawla PCoates RWeisman* AMendiola DATE 3/26/03 3/26/03 3/20/03 4/4/03 OFFICIAL RECORD COPY
Byron Station Units 1 and 2 cc:
Regional Administrator, Region III Mrs. Phillip B. Johnson U.S. Nuclear Regulatory Commission 1907 Stratford Lane 801 Warrenville Road Rockford, IL 61107 Lisle, IL 60532-4351 Attorney General Illinois Department of Nuclear Safety 500 S. Second Street Office of Nuclear Facility Safety Springfield, IL 62701 1035 Outer Park Drive Springfield, IL 62704 Byron Station Manager Exelon Generation Company, LLC Document Control Desk-Licensing 4450 N. German Church Road Exelon Generation Company, LLC Byron, IL 61010-9794 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Byron Exelon Generation Company, LLC Ms. C. Sue Hauser, Project Manager 4450 N. German Church Road Westinghouse Electric Corporation Byron, IL 61010-9794 Energy Systems Business Unit Post Office Box 355 Senior Vice President - Nuclear Services Pittsburgh, PA 15230 Exelon Generation Company, LLC 4300 Winfield Road Joseph Gallo Warrenville, IL 60555 Gallo & Ross 1025 Connecticut Ave., NW, Suite 1014 Vice President Washington, DC 20036 Mid-West Operations Support Exelon Generation Company, LLC Howard A. Learner 4300 Winfield Road Environmental Law and Policy Warrenville, IL 60555 Center of the Midwest 35 East Wacker Drive Senior Vice President Suite 1300 Mid-West Regional Operating Group Chicago, IL 60601-2110 Exelon Generation Company, LLC 4300 Winfield Road U.S. Nuclear Regulatory Commission Warrenville, IL 60555 Byron Resident Inspectors Office 4448 North German Church Road Chairman Byron, IL 61010-9750 Will County Board of Supervisors Will County Board Courthouse Ms. Lorraine Creek Joliet, Illinois 60434 RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061
Byron Station Units 1 and 2 Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness 110 East Adams Street Springfield, Illinois 62701-1109 Director Licensing Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Senior Counsel, Nuclear Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Braidwood and Byron Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-454 BYRON STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 132 License No. NPF-37
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (the licensee) dated September 27, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-37 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 132 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 4, 2003
EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-455 BYRON STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 132 License No. NPF-66
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (the licensee) dated September 27, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-66 is hereby amended to read as follows:
2 (2) Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 132 and the Environmental Protection Plan contained in Appendix B, both of which were attached to License No. NPF-37, dated February 14, 1985, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 4, 2003
ATTACHMENT TO LICENSE AMENDMENT NOS. 132 AND 132 FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 DOCKET NOS. STN 50-454 AND STN 50-455 Replace the following page of Units 1 and 2, Appendix B of Technical Specifications with the attached page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Pages Insert Pages 3-2 3-2
A proposed change, test or experiment shall be deemed to involve an unreviewed environmental question if it concerns: (1) a matter which may result in a significant increase in any adverse environmental impact previously evaluations in the FES-OL, environmental impact appraisals, or in any decisions of the Atomic Safety and Licensing Board; or (2) a significant change in effluents or power level or (3) a matter, not previously reviewed and evaluated in the l documents specified in (1) of this Subsection, which may have a significant adverse environmental impact.
The licensee shall maintain records of changes in facility design or operation and of tests and experiments carried out pursuant to this Subsection. These records shall include written evaluations which provide bases for the determination that the change, test, or experiment does not involve an unreviewed environmental question or constitute a decrease in the effectiveness of this EPP to meet the objectives specified in Section 1.0. The licensee shall include as part of the Annual Environmental Operating Report (per Subsection 5.4.1) brief descriptions, analyses, interpretations, and evaluations of such changes, tests and experiments.
3.2 Reporting Related to the NPDES Permit and State Certification Changes to, or renewals of, the NPDES Permit or the State certification shall be reported to the NRC within 30 days following the date the change or renewal is approved. If a permit or certification, in part or in its entirety, is appealed and stayed, the NRC shall be notified within 30 days following the date the stay is granted.
3-2 Amendment No. 132/132
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 132 TO FACILITY OPERATING LICENSE NO. NPF-37 AND AMENDMENT NO. 132 TO FACILITY OPERATING LICENSE NO. NPF-66 EXELON GENERATION COMPANY, LLC BYRON STATION, UNIT NOS. 1 AND 2 DOCKET NOS. STN 50-454 AND STN 50-455
1.0 INTRODUCTION
By application dated September 27, 2002, Exelon Generation Company, LLC (Exelon, the licensee) requested changes to Appendix B of the licenses for the Byron Nuclear Power Station, Units 1 and 2. The staffs proposed no significant hazards consideration determination was published in the Federal Register on October 29, 2002 (67 FR 66009).
The proposed changes would revise Appendix B, Environmental Protection Plan (Non-Radiological), of the licenses to remove a parenthetical reference to a superseded section of 10 Code of Federal Regulations (CFR) Part 51. The proposed changes will eliminate a superseded CFR reference and provide consistency with the current Nuclear Regulatory Commission (NRC) recommended Appendix B format. Specifically, the proposed changes would revise Appendix B by deleting the term, (in accordance with 10 CFR Part 51.5(b)(2)), in the third paragraph of Section 3.1.
2.0 REGULATORY EVALUATION
The non-radiological Environmental Protection Plan (EPP) provides for protection of environmental parameters during operation of the station. The principal objectives of the plan are to (1) verify the plant is operated in a environmentally acceptable manner, (2) coordinate NRC requirements and maintain consistency with other Federal, State, and local requirements for environmental protection, and (3) keep NRC informed of the environmental effects of facility construction and operation and of actions taken to control those effects.
Byron Station Units 1 and 2 Operating License Appendix B, the non-radiological EPP, Section 3.1, Plant Design and Operation, provides requirements to obtain prior approval from the NRC when a proposed change, test, or experiment is deemed to involve an unreviewed environmental question. The third paragraph of the section states that, A proposed change, test or experiment shall be deemed to involve an unreviewed environmental question if it concerns: (1) a matter which may result in a significant increase in any adverse environmental impact previously evaluated in the FES-OL, environmental impact appraisals, or in any decisions of the Atomic Safety and Licensing Board; or (2) a significant change in effluents or power level [in accordance with 10 CFR Part 51.5(b)(2)] or (3) a matter, not previously reviewed and evaluated in documents specified in (1) of this Subsection, which may have a significant adverse environmental impact.
The staff finds that the licensee in Section B of Attachment A of its submittal identified the applicable regulatory requirements. The regulatory requirements which the staff considered in its review are 10 CFR Part 51 and Operating License Appendix B.
3.0 TECHNICAL EVALUATION
The staff has reviewed the licensees regulatory and technical analyses in support of its proposed license amendment, which are described in Sections D and F of Attachment A of the licensees submittal.
The proposed change is editorial in nature. The current parenthetical reference to 10 CFR 51.5(b)(2) in Appendix B is no longer applicable, since this CFR reference was superseded in 1984 by a complete revision of 10 CFR Part 51 (49 FR 9381). The subject matter of the original referenced portion of the CFR was not carried over into the reformatted regulations during the revision. The proposed change is consistent with the Appendix B format used in more recently licensed facilities, such as Clinton Power Station, Braidwood Station, and Limerick Generating Station. The removal of this reference does not change the intent of Section 3.1 of Appendix B and does not affect plant safety. Therefore, removal of the parenthetical reference to 10 CFR 51.5(b)(2) in Appendix B is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Illinois State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
Pursuant to 10 CFR 51.21, 51.32, and 51.35, an environmental assessment and finding of no significant impact was prepared and published in the Federal Register on January 8, 2003 (68 FR 1069), for the proposed amendment. Accordingly, based on the environmental assessment, the Commission has determined that the issuance of the amendment will not have a significant effect on the quality of the human environment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: M. Chawla Date: April 4, 2003