Forthcoming Meeting with Pacific Gas and Electric Company, Pg&Es Resolution of Steam Generator Issues from Current Refueling Outage 2R11 of Diablo Canyon, Unit 2
ML030580504
Person / Time
Site: Diablo Canyon 
Issue date: 02/27/2003
From: Shukla G
NRC/NRR/DLPM/LPD4
To: Stephen Dembek
NRC/NRR/DLPM/LPD4
Shukla G, NRR/DLPM/LPDIV-2/415-8439
References
Download: ML030580504 (6)


Text

February 27, 2003 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

Girija Shukla, Project Manager, Section 2

/RA/

Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY DATE & TIME:

Tuesday, March 4, 2003 9:00 a.m. - 5:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-5 B 4 Rockville, Maryland PURPOSE:

To present PG&Es resolution of steam generator issues from the current refueling outage 2R11 of the Diablo Canyon Power Plant Unit 2.

CATEGORY*:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC PG&E Girija Shukla Herb Berkow L. Womack J. Tomkins Bill Bateman Louise Lund P. Nugent S. Ketelsen Emmett Murphy Cheryl Khan R. Exner D. Beals Dwight Chamberlain Charles Marschall A. Afzali R. Keating (Westinghouse)

Steve Long Jim Davis, et al.

T. Pitterle (Westinghouse)

E. Begley (Framatome)

J. Fleck (Framatome)

J. Riley (NEI), et al.

S. Dembek Docket Nos. 50-275 and 50-323

Attachment:

Agenda (Accession No. ML030580504) cc w/att: See next page MEETING CONTACT: Girija Shukla (301) 415-8439 Gss@nrc.gov

  • Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, 67 FR 36920, May 28, 2002.

ML030580504 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC PDIV:D NAME GShukla MMcAllister for EPeyton SDembek HBerkow DATE 2/27/03 2/27/03 2/27/03 2/27/03 DOCUMENT NAME: G:\\PDIV-2\\DiabloCanyon\\Diablo Meeting Notice 3-4-03.wpd

February 27, 2003 DISTRIBUTION FOR MEETING NOTICE WITH PACIFIC GAS AND ELECTRIC COMPANY ON MARCH 4, 2003 Hard Copy:

PUBLIC PDIV-2 Reading GShukla Receptionist OWFN / TWFN E-Mail:

RidsNrrAdpt (BSheron / RAuluck)

RidsNrrDlpm (JZwolinski / TMarsh)

RidsNrrDlpmLpdiv (WRuland)

HBerkow SDembek RidsNrrPMGShukla RidsNrrLAEPeyton RidsNrrAdpt (KJohnson)

RidsOpaMail RidsOgcMailCenter RidsAcrsAcnwMailCenter WBateman (NRR/DE/EMCB)

LLund (NRR/DE/EMCB)

EMurphy (NRR/DE/EMCB)

CKhan (NRR/DE/EMCB)

SLong (NRR/DSSA/SPSB)

JDavis (NSIR/PMDA)

AHsia (RES/DET/ERAB)

MMayfield (RES/DET)

MKotzalas (NRR/PMAS)

PMNS

AGENDA MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY MARCH 4, 2003 1.

Introduction and

Background:

a.

Primary to secondary leakage b.

Pressure test results c.

Initial inspections and findings 2.

Technical Issues:

a.

U Bend Circumferential Indications i.

Inspection expansion scope ii.

Results of eddy current tests and visual inspections iii.

Results of in-situ leak and pressure tests iv.

Results of growth analysis v.

Root cause evaluation vi.

Operational Assessment b.

Outside Diameter Stress Corrosion Cracking Growth i.

Inspection scope and results ii.

Probability of Detection calculational methodology iii.

Startup calculations and 120 day Operational Assessment iv.

Plans for cycle beyond 120 days v.

Update on locked Tube Support Plate analysis vi.

Risk assessment vii.

Root cause evaluation viii.

Other PG&E actions 3.

Unit 1s Operability Evaluation 4.

Conclusion

5.

PUBLIC COMMENTS

Diablo Canyon Power Plant, Units 1 and 2 cc:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, CA 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Christopher J. Warner, Esq.

Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 Mr. David H. Oatley, Vice President and General Manager Diablo Canyon Nuclear Power Plant P.O. Box 56 Avila Beach, CA 93424 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 Mr. Ed Bailey, Radiation Program Director Radiologic Health Branch State Department of Health Services P.O. Box 942732 (MS 178)

Sacramento, CA 94234-7320 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814 Mr. James R. Becker, Vice President Diablo Canyon Operations and Station Director Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, CA 93424