January 2003 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2
ML030550786
Person / Time
Site: Point Beach  
Issue date: 02/11/2003
From: Cayia A
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2003-0013
Download: ML030550786 (5)


Text

Nac Committed to Nuclear Excellence~

Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0013 GL 97-02 February 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant fbr the calendar month of January 2003.

Sincerely, Site Presi nt KmL Attachment cc:

J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager 6590 Nuclear Road 0 Two Rivers, Wisconsin 54241 Telephone: 920 755 2321

/

OPERATING DATA REPORT DOCKET NO.

50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 02/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD January - 2003 DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVED SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH)

MONTH 744.0 744.0 0.0 375,190.0 YEAR TO DATE 744.0 744.0 0.0 375,190.0 CUMULATIVE 232,343.4 228,802.5 846.9 105,926,499.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

1.

2.

515.0 510.0

3.
4.
5.

6.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-301 Point Beach, Unit 2 2/04/2003 Kim M. Locke 755-6420 REPORTING PERIOD:

January 2003 (Month/Year)

(1) Reason A. Equipment Failure (Explain)

B.

Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)

(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram

4. Continuation
5. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of January was 508.6 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC in January:

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A

OPERATING DATA REPORT DOCKET NO.

50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 02/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD January - 2003 DESIGN ELECTRICAL RATING (MWE-NET)

MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVED SHUTDOWN HOURS NET ELECTRICAL ENERGY (MWH)

MONTH 744.0 744.0 0.0 378,421.0 YEAR TO DATE 744.0 744.0 0.0 378,421.0 CUMULATIVE 226,497.1 223,509.7 302.2 105,166,224.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

1.

2.

515.0 512.0

3.
4.
5.

6.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-266 Point Beach, Unit 1 2/04/2003 Kim M. Locke 755-6420 (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction

4. Continuation E.

Operator Training/license Examination F.Administrative

5. Other (Explain)

G. Operational Error (Explain) H.Other (Explain)

SUMMARY

Unit 1 average daily power for the month of January was 504.3 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC in January:

REPORTING PERIOD:

January 2003 (MonthlYcar)

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A