NRC 2003-0013, January 2003 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2
ML030550786 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 02/11/2003 |
From: | Cayia A Nuclear Management Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
GL-97-002, NRC 2003-0013 | |
Download: ML030550786 (5) | |
Text
Nac Committed to Nuclear Excellence~ Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0013 GL 97-02 February 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant fbr the calendar month of January 2003.
Sincerely, Site Presi nt KmL Attachment cc: J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager 6590 Nuclear Road 0 Two Rivers, Wisconsin 54241
/
Telephone: 920 755 2321
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 02/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD January - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 510.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 232,343.4
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 228,802.5
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 375,190.0 375,190.0 105,926,499.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 2/04/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: January 2003 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G .Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 2 average daily power for the month of January was 508.6 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in January:
OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 02/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD January - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 512.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 226,497.1
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 223,509.7
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
- 6. NET ELECTRICAL ENERGY (MWH) 378,421.0 378,421.0 105,166,224.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 2/04/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: January 2003 (MonthlYcar)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G. Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 1 average daily power for the month of January was 504.3 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in January:
Text
Nac Committed to Nuclear Excellence~ Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0013 GL 97-02 February 11, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant fbr the calendar month of January 2003.
Sincerely, Site Presi nt KmL Attachment cc: J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager 6590 Nuclear Road 0 Two Rivers, Wisconsin 54241
/
Telephone: 920 755 2321
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 02/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD January - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 510.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 232,343.4
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 228,802.5
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
- 6. NET ELECTRICAL ENERGY (MWH) 375,190.0 375,190.0 105,926,499.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 2/04/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: January 2003 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G .Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 2 average daily power for the month of January was 508.6 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in January:
OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 02/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD January - 2003
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 512.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 226,497.1
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 223,509.7
- 5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
- 6. NET ELECTRICAL ENERGY (MWH) 378,421.0 378,421.0 105,166,224.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 2/04/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: January 2003 (MonthlYcar)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G. Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 1 average daily power for the month of January was 504.3 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC in January: