ML030450501
| ML030450501 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/13/2003 |
| From: | Gody A Operations Branch IV |
| To: | Anderson C Entergy Operations |
| References | |
| 50-368/03-301 | |
| Download: ML030450501 (4) | |
See also: IR 05000368/2003301
Text
January 13, 2003
Craig G. Anderson, Vice President,
Operations
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
Russellville, Arkansas 72801-0967
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION NOTIFICATION (EXAMINATION
REPORT 50-368/03-301
In a telephone conversation on January 10, 2003, between Mr. Mayfield, Arkansas Nuclear One,
Unit 2, Operations Training Supervisor, and Mr. Drake, arrangements were made for the
administration of licensing examinations at the Arkansas Nuclear One, Unit 2, during the week of
July 14, 2003.
As agreed during the telephone conversation, your staff and the NRC will prepare the
examinations based on the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The NRC regional office will discuss
with your staff any changes that might be necessary to the portion of the examination prepared
by your staff before the examinations are administered. Your support for onsite validation of the
examinations is required during the week of June 23, 2003. Your staff will be given the
opportunity to review the NRC prepared portion of the examinations during this time.
To meet the above schedule, it will be necessary for your staff to furnish the information for the
examination outlines by March 16, 2003. The written examinations, operating tests, and the
supporting reference materials identified in Attachment 2 of ES-201 and as specified by the chief
examiner will be due by May 15, 2003. Any delay in receiving the required portion of the
examination and reference materials, or the submittal of inadequate or incomplete materials,
may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
Entergy Operations, Inc.
-2-
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on April 30, 2003.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />
per response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail
at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of
information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, its
enclosure(s), and your response will be made available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Mayfield has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Drake at 817-276-6558, Mr. Gage at
817-860-8273 or Mr. Gody at 817-860-8159 .
Sincerely,
/RA/
A.T. Gody, Chief
Operations Branch
Division of Reactor Safety
Dockets: 50-368
Licenses: NPF-6
Entergy Operations, Inc.
-3-
cc:
Executive Vice President
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
Power
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
County Judge of Pope County
Pope County Courthouse
100 West Main Street
Russellville, Arkansas 72801
Winston & Strawn
1400 L Street, N.W.
Washington, DC 20005-3502
Bernard Bevill
Radiation Control Team Leader
Division of Radiation Control and
Emergency Management
4815 West Markham Street, Mail Slot 30
Little Rock, Arkansas 72205-3867
Mike Schoppman
Framatome ANP, Inc.
Suite 705
1911 North Fort Myer Drive
Rosslyn, Virginia 22209
Entergy Operations, Inc.
-4-
Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (RLB3)
Branch Chief, DRP/D (LJS)
Senior Project Engineer, DRP/D (JAC)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
SOE:OB
OE:OB
C:OB
PCGage/lmb
JFDrake
ATGody
/RA/
/RA/
/RA/
1/13/2003
1/13/2003
1/13/2003
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax