March 3, 2003 LICENSEE:
Nuclear Management Company, LLC FACILITY:
Point Beach Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF FEBRUARY 6, 2003, MEETING REGARDING THE SELECTIVE SCOPE APPLICATION OF AN ALTERNATIVE SOURCE TERM FOR THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 On February 6, 2003, a meeting was held between the Nuclear Regulatory Commission (NRC) and the Nuclear Management Company, LLC (NMC), regarding the selective scope application of an alternative source term (AST) for the Point Beach Nuclear Plant, Units 1 and 2. The meeting agenda is available in the Agency Documents Access and Management System (ADAMS) via Accession No. ML030160143. Enclosure 1 provides a list of meeting participants.
Representatives from NMC made a presentation and provided the NRC staff with slides (Enclosure 2). The NMC staff discussed its plan to adopt the AST for the fuel handling accident (FHA) only (at this time). Although an FHA has a low probability of occurrence, it could conceivably involve uncontrolled releases of radioactive materials to the environment. A source term is the amount and composition of fission products postulated to be released, which is used in modeling releases of radionuclides to the environment. In addition to adopting the AST, NMC proposes to conduct refueling operations with the containment open (thus the equipment hatch and the personnel air lock would be open). It is the position of NMC that by adopting the AST, the analysis indicates that radiation doses from an FHA with the containment open is within acceptable limits.
No commitments were made by the NRC staff or by the NMC representatives. However, some of the issues discussed were as follows:
The FHA accident analysis does not take credit for the use of potassium iodide (KI) for the control room operator dose assessment.
The FHA analysis will be based on the uprated power level of 1683 megawatts thermal.
Verification of the NMC assumption of 500 cubic feet per minute unfiltered air inleakage to the control room. (The current licensing basis is 10 cfm).
Determination of the current inleakage and performance of a control room unfiltered air inleakage test. Conducting a sensitivity analysis to determine the maximum inleakage rate meeting the dose criteria specified in Point Beach-specific General Design Criterion 19.
Contingency plans (administrative controls) for closing the hatch if an FHA occurred.
By March 31, 2003, NMC plans to submit an amendment request pertaining to the selective implementation of an AST for the FHA.
/RA/
Deirdre W. Spaulding, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Enclosures:
- 1. Meeting Attendees
- 2. NMC Handouts cc w/encls: See next page
Point Beach Nuclear Plant, Units 1 and 2 cc:
Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037-1128 Mr. Richard R. Grigg President and Chief Operating Officer Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 Site Licensing Manager Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Mr. Roy A. Anderson Executive Vice President and Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Nuclear Asset Manager Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 October 2002
ML030440109 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME DSpaulding RBouling LRaghavan DATE 02/27/03 02/27/03 03/03/03
ENCLOSURE 1 LIST OF ATTENDEES MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION AND THE NUCLEAR MANAGEMENT COMPANY, LLC REGARDING THE SELECTIVE SCOPE APPLICATION OF AN ALTERNATIVE SOURCE TERM FOR THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 FEBRUARY 6, 2003 NAME ORGANIZATION L. Brown NRC/NRR J. Lee NRC/NRR E. Forrest NRR/NRR J. Pulsipher NRC/NRR H. Walker NRR/NRR L. Raghavan NRR/NRR D. Spaulding NRR/NRR J. Gadzala NMC L. Schofield NMC S. Scott NMC NRR = Office of Nuclear Reactor Regulation