ML030430079
| ML030430079 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/31/2003 |
| From: | Becker J Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| DCL-03-009, TAC MB1203, TAC MB1204 | |
| Download: ML030430079 (1) | |
Text
Pacific Gas and Electric Company Diablo Canyon Power Plant P0 Box 56 Avila Beach. CA 93424 January 31, 2003 800545 6000 PG&E Letter No. DCL-03-009 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Inservice Inspection (ISI) Program Plan, Revision 2
Dear Commissioners and Staff:
Enclosed for your information is the Diablo Canyon Power Plant Units I and 2 second 10-year interval ISI Program Plan, Revision 2. Submittal of the ISI Program Plan is in accordance with ASME Section Xl, IWA-1400(C).
Revision 2 of the IS! Program Plan updates the Table of Second Interval Request for Relief and incorporates the Risk Informed ISi relief approved by the NRC November 8, 2002 (TAC Nos. MB1203 and MB1204).
Other changes include editorial corrections and updates to the ISI Program Plan.
- Sincerel, James R. Be ker Vice President - Diablo Canyon Operations and Station Director ddm/469 Enclosure cc:
Ellis W. Merschoff David L. Proulx Diablo Distribution cc/enc:
Girija S. Shukla State of California A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway a Comanche Peak
- Diablo Canyon e Pato Verde e South Texas Project a Wolf Creek