ML030370752

From kanterella
Jump to navigation Jump to search
Foreign Ownership, Control, or Influence Information
ML030370752
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/31/2003
From: Springer M
Office of Administration
To: Vonsuskil J
Exelon Generation Co
Moroney B, NRR/DLPM, 415-3974
References
Download: ML030370752 (6)


Text

January 31, 2003 Mr. James D. von Suskil, Site Vice President Braidwood Station, Units 1 & 2 Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, Il 60407

SUBJECT:

BRAIDWOOD STATION, UNITS 1& 2 - FOREIGN OWNERSHIP, CONTROL, OR INFLUENCE INFORMATION

Dear Mr. von Suskil:

We are writing to advise you that your company has not yet submitted its Foreign Ownership, Control, or Influence (FOCI) information that was outlined in our letter of March 22, 2002. As you may recall, the Nuclear Regulatory Commission (NRC) is taking steps to enhance its licensees ability to respond to the continuing heightened security environment by processing personnel security clearances for licensees. In order for the NRC to grant the personnel security clearances that your company requested subsequent to our March 22, 2002, letter, we must first make a Facility Security Clearance determination based on the FOCI information you submit. Currently, the NRC is authorized to disseminate classified information to uncleared persons only under special circumstances when timeliness is critical to mitigating an emergency situation. Under our new clearance program, licensees may have access to classified information under more routine circumstances once personnel security clearances are granted.

However, before we can grant personnel security clearances, the NRC needs to make a successful FOCI determination, which may require several months to complete. Therefore, it is imperative that you provide your FOCI information to us as soon as possible. If you need to review the regulations on FOCI and Facility Security Clearance requirements, an overview can be found in Part 95 of Title 10 of the Code of Federal Regulations.

Questions regarding FOCI packages should be referred to J. Keith Everly of the Office of Nuclear Security and Incident Response at 301-415-7048 or jke@nrc.gov.

Sincerely,

/RA/

Michael L. Springer, Director Office of Administration Docket No(s): 50-456 and 50-457 cc: See next page

January 31, 2003 Mr. James D. von Suskil, Site Vice President Braidwood Station, Units 1 & 2 Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, Il 60407

SUBJECT:

BRAIDWOOD STATION, UNITS 1& 2 - FOREIGN OWNERSHIP, CONTROL, OR INFLUENCE INFORMATION

Dear Mr. von Suskil:

We are writing to advise you that your company has not yet submitted its Foreign Ownership, Control, or Influence (FOCI) information that was outlined in our letter of March 22, 2002. As you may recall, the Nuclear Regulatory Commission (NRC) is taking steps to enhance its licensees ability to respond to the continuing heightened security environment by processing personnel security clearances for licensees. In order for the NRC to grant the personnel security clearances that your company requested subsequent to our March 22, 2002, letter, we must first make a Facility Security Clearance determination based on the FOCI information you submit. Currently, the NRC is authorized to disseminate classified information to uncleared persons only under special circumstances when timeliness is critical to mitigating an emergency situation. Under our new clearance program, licensees may have access to classified information under more routine circumstances once personnel security clearances are granted.

However, before we can grant personnel security clearances, the NRC needs to make a successful FOCI determination, which may require several months to complete. Therefore, it is imperative that you provide your FOCI information to us as soon as possible. If you need to review the regulations on FOCI and Facility Security Clearance requirements, an overview can be found in Part 95 of Title 10 of the Code of Federal Regulations.

Questions regarding FOCI packages should be referred to J. Keith Everly of the Office of Nuclear Security and Incident Response at 301-415-7048 or jke@nrc.gov.

Sincerely,

/RA/

Michael L. Springer, Director Office of Administration Docket No(s): 50-456 and 50-457 cc: See next page

  • See previous concurrence
    • No legal objection ADAMS Accession Number:ML030370752 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosures "E" = Copy with attachments/enclosures "N =

No copy OFFICE INFOSEC INFOSEC ADM/SB OGC**

OGC**

NAME JKEverly ALSilvious*

CMStone*

DFHassell*

JRGoldberg*

DATE 01/ 30/03 01/02/03 01/02/03 12/16/02 12/16/02 OFFICE DLPM/PM DLPM/LA D/DLPM D/DFS D/NSIR D/ADM NAME BMoroney CRosenberg JAZwolinski* TOMartin*

RPZimmerman*

MLSpringer DATE 01/29/03 01/29/03 01/13/03 01/13/03 01/14/03 01/ 31/03 OFFICIAL RECORD COPY

DISTRIBUTION (Letter to licensees regarding submittal of FOCI information)

PUBLIC DCF: LRD 3.00.09 LRD 7.00.09 P.G. Norry, EDO S. A. Morris, EDO S.J. Collins, NRR B.W. Sheron, NRR J.A. Zwolinski/ Tad Marsh, NRR B.A. Boger, NRR R. P. Zimmerman, NSIR M. F. Weber, NSIR G. M. Tracy, D/DNS M.L. Springer, D/ADM T.O. Martin, D/DFS J. K. Everly, NSIR ADM R/F DFS R/F INFOSEC R/F PDIII-2 R/F L. Ragavan A. Mendiola M. Chawla C. Rosenberg A. Stone, RIII ACRS OGC

Braidwood Station Units 1 and 2 cc:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704 Document Control Desk-Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Ms. C. Sue Hauser, Project Manager Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, PA 15230 Joseph Gallo Gallo & Ross 1025 Connecticut Ave., NW, Suite 1014 Washington, DC 20036 Ms. Bridget Little Rorem Appleseed Coordinator 117 N. Linden Street Essex, IL 60935 Howard A. Learner Environmental Law and Policy Center of the Midwest 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Braidwood Resident Inspectors Office 35100 S. Rt. 53, Suite 79 Braceville, IL 60407 Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109 Chairman Will County Board of Supervisors Will County Board Courthouse Joliet, IL 60434 Attorney General 500 S. Second Street Springfield, IL 62701 George L. Edgar Morgan, Lewis and Bockius 1800 M Street, NW Washington, DC 20036-5869 Braidwood Station Manager Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Senior Vice President, Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President Mid-West Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061

Braidwood Station Units 1 and 2 Exelon Generation Company, LLC Regulatory Assurance Manager - Braidwood 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Senior Vice President Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director Licensing Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Counsel, Nuclear Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing Braidwood and Byron Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555