MONTHYEARIR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 L-24-025, Submittal of the Updated Final Safety Analysis Report, Revision 352024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 L-24-221, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) 2024-09-06
[Table view] |
Text
A FRAMATOME ANP An AREVA and Siemens company FRAMATOME ANP, Inc.
January 16, 2003 NRC:03:008 Document Control Desk ATTN: Chief, Planning, Program and Management Support Branch U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Evaluation of a Potential Safety Concern Pursuant to IOCFR21(a)(2)
Ref.: 1. Letter, J. F. Mallay (Framatome ANP) to Document Control Desk (NRC), "Interim Report on the Evaluation of a Potential Safety Concern Pursuant to 1 OCFR21 (a)(2),"
NRC:02:058, November 26, 2002.
Framatome ANP initiated a potential safety concern (PSC 4-02) on September 30, 2002, as a result of findings from a limited set of chemical samples taken at Davis Besse that may be indicative of reactor coolant leakage from a source other than the upper reactor vessel head.
After conducting a critical evaluation of the available data, Framatome ANP concluded it did not have adequate information to determine whether this finding constituted a reportable defect under the provisions of Part 21 (Reference 1).
PSC 4-02 was written to apply to all reactor vessels included in nuclear steam systems supplied by B&W. Only the owners of these reactor vessels can make a final determination of reportability under Part 21. Therefore, the responsibility for addressing this concern has been transferred to the members of the B&WOG, who will make their own determinations. A copy of the letter turning over this responsibility is enclosed.
PSC 4-02 has been closed by Framatome ANP.
Very truly yours, James F. Mallay, DirectorV Regulatory Affairs Enclosure cc: D. G. Holland Project 728
/
FRAMATOME ANP, Inc.
2101 Horn Rapids Road - Richland, WA 99352 Tel.: 509-375-8100 Fax: 509-375-8402 www.us.framatome-anp.com
A An AREVA and Siemens company FRAMATOME ANP FRAMATOME ANP, Inc.
January 15, 2003 JFM:03:001 B&WOG Licensing Managers Ref.: 1. Letter, J. F. Mallay to B&WOG Members, October 17, 2002 (JFM:02:017)
- 2. Letter, J. F. Mallay to B&WOG Licensing Working Group, "Preliminary Safety Concern Related to Chemical Samples Taken from the Lower Reactor Vessel Head at Davis Besse," November 12, 2002 (JFM:02:020)
- 3. Letter, J. F. Mallay to the NRC, "Interim Report on the Evaluation of a Potential Safety Concern Pursuant to IOCFR21(a)(2)," November 26, 2002 (NRC:02:058)
On September 30, 2002, Framatome ANP initiated a preliminary safety concern (PSC 4-02) concerning the results of limited chemical samples taken from the lower reactor vessel head at Davis Besse. The B&WOG has been kept informed of this situation in letters of October 17 and November 12 (References I and 2). In addition, a copy of Framatome ANP's letter to the NRC that enclosed an interim report on the situation was distributed to members of the B&WOG (Reference 3). All three letters state that each licensee should assume responsibility for Interpreting this situation for its own units because the concern raised in the PSC applies to all reactor vessels provided with B&W-supplied nuclear steam systems.
Framatome ANP has determined that it has insufficient information to determine whether the concern identified is reportable under the provisions of 10CFR21. Therefore, this matter is being transferred to the members of the B&WOG so they can evaluate the concern under their own procedures and individually make their own determinations.
Framatome ANP is notifying the NRC that PSC 4-02 is being closed because members of the B&WOG will make their own decisions on whether action is required under the provisions of Part 21. Framatome ANP will appreciate being informed of your determination for our records.
Very truly yours, James F. Mallay, Director Regulatory Affairs FRAMATOME ANP, Inc.
2101 Horn Rapids Road - Richland WA 99352 Tel.: 509-375-8100 Fax: 509-375-8402 www.us.freomatorme-onP.COm
I B&WOG Licensing Managers JFM:03:001 January 15,2003 Page 2 Distribution:
(sent by US mail)
Duke Energy Company Mr. Larry Nicholson Duke Energy Company Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 Progress Energy Florida Mr. Jim Terry, Manager of Engineering Progress Energy Florida Crystal River Energy Complex 15760 West Power Line St.
Crystal River Florida 34428-6708 FENOC Mr. Patrick J. McCloskey Manager of Regulatory Affairs FirstEnergy Nuclear Operating Company 5501 N. State Route 2 Oak Harbor OH 43449 EOI Mr. Glenn R. Ashley Manager of Licensing Entergy Operations Inc.
1448 State Route 333 Russellville AR 72802 Exelon Mr. John Hufnagel TMI-1 Licensing Manager Exelon Nuclear 200 Exelon Way Suite 330 Kennett Square PA 19348
B&WOG Licensing Managers JFM:03:001 January 15, 2003 Page 3 cc (by email):
B&WOG Licensing Working Group:
S. A. Bennett - Entergy Operations Inc.
Sbenne2f.enterav.com P. E. Infanger - Florida Power Corporation Paul.InfanaeraOfl:nmail.com Noel Clarkson - Duke Energy Corporation ntclarks(&-duke-enerQv.com John Hufnagel - Exelon Nuclear John.hufnagelexeloncorp.com Dale Wuokko - FirstEnergy Nuclear Operating Company Date R. Wuokko(@Wirsteneraycor.coom Michael Leisure - FirstEnergy Nuclear Operating Company mkleisure(-firstenemycorp.com R. J. Schomaker - Framatome ANP Bob.Schomaker('framatome-anfp.com M. A. Schoppman - Frarnatome ANP MasO-nel.ora Sid Powell - Progress Energy Florida (by US mail)
D. J. Firth - Framatome ANP Dave.FirthOframatome-ano.com