MONTHYEARML19004A3022018-12-19019 December 2018 Emergency Plan Changes Revision 61 to Revision 62 ML17006A3862017-01-0505 January 2017 FEMA - Submittal of After Action Report/Improvement Plan for Susquehanna Steam Electric Station 2016 Plume Exercise Evaluated on October 18, 2016 ML15264A6932015-09-21021 September 2015 SSES EAL Scheme Bases Document Redline Strike-out in Support of 9/23 Public Meeting PLA-7285, Revision (X) to EP-RM-004, EAL Classification Bases2015-03-19019 March 2015 Revision (X) to EP-RM-004, EAL Classification Bases PLA-7279, Submittal of Revision 56 to Emergency Plan2015-01-19019 January 2015 Submittal of Revision 56 to Emergency Plan ML0627801812006-09-22022 September 2006 Rev. 4 to TSB2, Technical Specifications Bases Unit 2 Manual and Rev. 75 to Manual Table of Contents ML0519904452005-07-0707 July 2005 Technical Specification Bases Unit 1 Manual, Revision 1 ML0410505062004-04-0707 April 2004 EP-PS-137, Rev 0, TSC NRC Communicator. ML0410504572004-04-0707 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-126, Control Room (CR) Communicator. ML0410503912004-04-0707 April 2004 Transmittal of EP-PS-135, NRC Communicator: Emergency Plan Position Specific Procedure ML0410504682004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-243, Rev 5, Radiological Liaison. ML0410504632004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-221-1, Nearsite Emergency Monitoring Team: Emergency Plan-Position Specific Procedure. ML0410504602004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-248, Environmental Sample Director. ML0409904242004-04-0101 April 2004 to EP-PS-248, Environmental Sample Director. ML0409004192004-03-23023 March 2004 EP-PS-113, Security Coordinator: Emergency Plan-Position Specific Procedure. ML0408406142004-03-10010 March 2004 EP-PS-101, Emergency Director (Ed). ML0408406122004-03-0808 March 2004 EP-PS-307, Engineering Support Manager. ML0408406062004-03-0808 March 2004 EP-PS-102, Technical Support Coordinator. ML0405503942004-02-16016 February 2004 Revision 10 to EP-PS-351, News Manager. ML0405503912004-02-16016 February 2004 EP-PS-367, General Office Operations Manager. ML0403502512004-01-28028 January 2004 EP-PS-245, Dose Assessment Supervisor. ML0403502642004-01-27027 January 2004 EP-PS-130, Rev 17, HP II Dose Calculator. ML0403502692004-01-27027 January 2004 EP-PS-244, Rev 7, Dose Assessment Staffer. ML0403502602004-01-27027 January 2004 EP-PS-104, Rev 17, Radiation Protection Coordinator (Rpc). ML0403502562004-01-27027 January 2004 EP-PS-105, TSC Dose Calculator. ML0402906032004-01-19019 January 2004 EP-PS-104, Rev. 17, Radiation Protection Coordinator (Rpc). ML0402905562004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-207, Rev. 11, EOF Support Supervisor: Emergency Plan Position Specific Procedure. ML0402905652004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-200, Rev. 16, Recovery Manager: Emergency Plan Position Specific Instruction. ML0402905412004-01-19019 January 2004 Revision 19 to EP-PS-100, Emergency Director/Control Room. ML0402905752004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-127, Rev. 16, TSC Emergency Plan Communicator: Emergency Plan Position Specific Procedure. ML0402905822004-01-19019 January 2004 EP-PS-114, Chemistry Coordinator. ML0402905942004-01-19019 January 2004 EP-PS-248, Environmental Sample Director. ML0402905982004-01-19019 January 2004 EP-PS-243, Radiological Liaison. ML0402906052004-01-19019 January 2004 Revision 19 to EP-PS-101, TSC Emergency Director. ML0402906082004-01-19019 January 2004 Revision 18 to EP-PS-212, EOF Communicator. ML0402905872004-01-19019 January 2004 EP-PS-247, Rev. 2, Field Team Director. PLA-5644, Proposed Emergency Plan Revision Requiring NRC Approval2004-01-16016 January 2004 Proposed Emergency Plan Revision Requiring NRC Approval ML0336405902003-12-19019 December 2003 Transmittal of EP-PS-100, Rev. 19 Emergency Director/Control Room: Emergency Plan-Position Specific Procedure. ML0335703252003-12-12012 December 2003 EP-PS-126, Revision 19, Control Room Communicator ML0335702972003-12-12012 December 2003 EP-PS-100, Emergency Director/Control Room. ML0335702992003-12-12012 December 2003 EP-PS-354, Media Operations Center (MOC) Communicator. ML0335703002003-12-12012 December 2003 EP-PS-212, Rev 18, EOF Communicator. ML0335703012003-12-12012 December 2003 EP-PS-207, Rev 11, Site Support Manager. ML0335703212003-12-12012 December 2003 EP-PS-137, Rev 0, TSC NRC Communicator. ML0335703232003-12-12012 December 2003 EP-PS-135, Rev 0, NRC Communicator. ML0335703242003-12-12012 December 2003 EP-PS-127, Rev 16, Technical Support Center (TSC) Communicator. ML0335703292003-12-12012 December 2003 EP-PS-114, Rev 10, Chemistry Coordinator: Emergency Plan-Position Specific Procedure. ML0335703302003-12-12012 December 2003 EP-PS-111, Rev 4, TSC Lead Engineer. ML0335703322003-12-12012 December 2003 EP-PS-103, Rev 6, Operations (OPS) Coordinator. ML0335703342003-12-12012 December 2003 EP-PS-102, Rev 23, Technical Support Coordinator. 2018-12-19
[Table view] |
Text
Jan. 09, 2003
"> Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-148/t USER INFORMATION:
EMPL#:23244 CA#: 0363 TRANSMITTAL INFORMATION:
01/09/2003 LOCATION: DOCUMENT CONTROL DESK PROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
ýfHE
.-.-- FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
350 - 350 - PUBLIC INFORMATION MANAGER: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 09/25/2002 ADD MANUAL TABLE OF CONTENTS DATE: 01/08/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-350 REPLACE: REV:14 REPLACE: REV:14 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
Tab 14 EP-PS-350-14 PREVIOUS EMERGENCY DECLARATIONS AT SUSQUEHANNA DATE CLASSIFICATION DESCRIPTION 09/22/82 ALERT A small electrical fire in the ESW pump house on the plant site. The fire was out within 10 minutes. The emergency was downgraded to UNUSUAL EVENT an hour later and ended 30 minutes after that. This event occurred before the plant went commercial.
06/22/83 UNUSUAL EVENT Bomb threat phoned to plant security. A thorough search turned up no explosives. The event lasted nine hours.
07/26184 UNUSUAL EVENT Failure of diesel generators to start during a planned test on Unit 2. The unit was in start-up testing and had not begun commercial operation. A problem in the electrical system was corrected, and power restored. The event lasted 40 minutes.
03/21/86 UNUSUAL EVENT Injured and contaminated worker.
05/24/86 ALERT Erosion discovered in pumps for one of the ESW loops. A second ESW loop was operable. PPL shut down the plant to inspect all ESW pumps. The alert lasted 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> while the units were being shut down.
09/23/87 UNUSUAL EVENT A main steam line plug dislodged during a Unit I refueling outage. The plug was suspended over the reactor core by three air hoses. Plant crews placed a net under the plug and removed it from the reactor vessel. The event lasted 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.
"01/13/88 UNUSUAL EVENT Injured and contaminated worker.
04/10189 UNUSUAL EVENT Injured and contaminated worker.
02/03/90 ALERT Loss of a shutdown cooling system on Unit 1 resulted in an increase in reactor water temperature. An alternate system was used to stabilize the water temperature until PPL could restore a circuit breaker that disabled the cooling system. The alert lasted six hours.
01/18/92 UNUSUAL EVENT A small hydrogen explosion in the basement of the plant's turbine building injured two workers, one of whom was contaminated with radioactive dust. The event lasted about an hour and a half.
08/23/01 UNUSUAL EVENT Plant Security apprehended a man inside the vehicle access area at the plant's North Gatehouse. He did not gain entry to the plant's protected area.
8/23/01 UNUSUAL EVENT An unarmed individual scaled the outer perimeter fence and was apprehended by plant security. The individual did not enter the Protected Area. The event lasted about 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 10/03/02 UNUSUAL EVENT A fire in the Unit two start-up transformer. The fire was extinguished by an automatic fire suppression system. The event lasted about 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.