January 2, 2003 Tennessee Valley Authority ATTN:
Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
INSPECTION OF SECURITY INTERIM COMPENSATORY MEASURES
Dear Mr. Scalice:
On August 26, 2002, the NRC staff completed its mid-cycle plant performance assessment of the Watts Bar facility and provided you with an inspection plan detailing the inspections scheduled through September 30, 2003. At that time, you were advised that the NRC was in the process of finalizing a Temporary Instruction (TI) that would be used to review implementation of the Security Interim Compensatory Measures (ICMs) required by the Agencys Order issued on February 25, 2002, and you would be informed of the schedule for the TI inspection at a later date.
On September 13, 2002, TI 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued. Subsequently, we conducted a pre-inspection audit utilizing Appendix A of the TI to obtain preliminary information on your implementation of the ICMs. With the completion of the audits at the Region II sites, we have developed an inspection schedule to complete the remaining portion of the TI, Appendices B and C, which will fully examine the details of implementation of the ICMs in the areas of security, operations, emergency planning, and information technology. The schedule for these inspections at Region II sites is enclosed. In addition, the TI is being conducted in lieu of the security baseline inspections in the schedule enclosed with our August 26, 2002 letter; however, additional inspections may be scheduled later in calendar year 2003.
If you have any questions regarding the conduct or schedule of TI 2515/148 inspections, please contact me at 404-562-4653.
Sincerely,
/RA/
Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-390, 50-391 License No. NPF-90 and Construction Permit No. CPPR-92
Enclosure:
TI Inspection Schedule
TVA 2
cc w/encl:
Karl W. Singer Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution James E. Maddox, Acting Vice President Engineering and Technical Services Tennessee Valley Authority Electronic Mail Distribution William R. Lagergren Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution Robert J. Adney, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority Electronic Mail Distribution Paul L. Pace, Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution County Executive Rhea County Courthouse 375 Church Street, Suite 215 Dayton, TN 37321-1300 County Executive Meigs County Courthouse Decatur, TN 37322 Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail Distribution Ann Harris 341 Swing Loop Rockwood, TN 37854 John D. White, Jr., Director Tennessee Emergency Management Agency Electronic Mail Distribution
TVA 3
Distribution w/encl:
M. Podavan, NRR C. Evans (Part 72 Only)
RIDSNRRDIPMLIPB PUBLIC OFFICE RII RII SIGNATURE ATB SJC NAME A Boland S Cahill DATE 01/02/03 12/31/02 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030100340.wpd
TI 2515/148 INSPECTION SCHEDULE Date (Week of)
Site Completed Catawba 01/06/03 Surry 01/13/03 Farley 01/27/03 St. Lucie 02/03/03 Browns Ferry 02/18/03 Brunswick 03/10/03 Summer 03/31/03 Turkey Point 04/07/03 Harris 04/14/03 Crystal River 05/12/03 Hatch 05/19/03 Robinson 06/16/03 Vogtle 06/23/03 Sequoyah 07/14/03 Watts Bar 08/04/03 McGuire 09/08/03 North Anna 09/15/03 Oconee Enclosure