Category:Code Relief or Alternative
MONTHYEARML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML21130A6012021-05-13013 May 2021 Correction of Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21110A0372021-04-29029 April 2021 Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML19227A1102019-08-26026 August 2019 Alternative Request for the Turbine Driven Auxiliary Feedwater Pumps 10-Year Interval Inservice Testing Program CNL-19-068, Response to Request for Additional Information Regarding the Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for2019-07-22022 July 2019 Response to Request for Additional Information Regarding the Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for .. ML19071A0092019-04-12012 April 2019 Relief Request 1-ISI-21 from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML18227A5992018-08-23023 August 2018 Request to Use a Later Edition of the Asme Boiler and Pressure Vessel Code, Section XI for Containment Inservice Inspection Activities CNL-18-078, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Lnservice Inspection (ISI) Program, Second Ten Year Interval Request for Relief for 1-ISI-212018-05-25025 May 2018 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Lnservice Inspection (ISI) Program, Second Ten Year Interval Request for Relief for 1-ISI-21 ML17292B2952017-10-28028 October 2017 Relief from the Requirements of the American Society of Mechanical Engineers Code (CAC No. MF8515; EPID L-2016-LLR-0003) ML16239A0722016-10-18018 October 2016 Alternative to Inservice Inspection Requirements of the ASME Boiler and Pressure Vessel Code for Examination of Reactor Pressure Vessel Shell-To-Flange Weld ML16238A0432016-10-18018 October 2016 Relief from the Requirements of the ASME Code for Reactor Pressure Vessel Flange Seal Leakoff Piping ML16225A6332016-09-0202 September 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760) ML16084A6902016-04-26026 April 2016 Relief from the Requirements of the ASME Code for Reactor Pressure Vessel Flange Seal Leak-Off Piping ML15215A4842015-08-0808 August 2015 Relief from the Requirements of the ASME Code for the First 10-Year Interval of the Containment Inservice Inspection ML14314A9872014-11-28028 November 2014 Request for Alternative 13-ISI-01 to Extend the Second Reactor Vessel Weld Inservice Inspection Interval CNL-14-139, Request for Alternative ISPT-032014-09-12012 September 2014 Request for Alternative ISPT-03 ML1029302992010-10-11011 October 2010 American Society of Mechanical Engineers Section XI Request for Relief WBN-2/PSI-1 ML1027005272010-09-29029 September 2010 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certification ML0830900462008-10-30030 October 2008 Preservice Inspection Program Plan and Request for Relief No. WBN-2/PDI-4 ML0708003612007-06-11011 June 2007 Request for Relief G-RR-1 Regarding Preemptive Weld Overlays on Pressurizer Nozzles ML0703900102007-02-0707 February 2007 Updated Inservice Inspection Program for Second 10-Year Interval and Requests for Relief Nos. PDI-2, PDI-4, and SNBR-1 ML0615901112006-08-30030 August 2006 Relief, One Time Request for Relief from ASME, Section XI, Code Requirements - Tests Following Repair, Modification, or Replacement ML0617303862006-07-11011 July 2006 Relief, Relief Request No. ISPT-09 for the First Ten-Year Inservice Inspection Interval ML0618701442006-06-30030 June 2006 Inservice Test Program Update and Associated Relief Requests for Second Ten-Year Interval ML0528002312005-10-0404 October 2005 NRC First Revised Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors - Request for Relief ML0517304872005-08-0202 August 2005 Relief, Inservice Inspection Program Relief Request PDI-4 ML0502504152005-02-15015 February 2005 Relief, Use of ASME and Pressure Vessel (PV) Code for VT-2 ML0436305502005-01-25025 January 2005 Relief, Safety Evaluation of Inservice Inspection Relief Nos. 1-ISI-14 and 1-ISI-15 First 10-Year Inspection Interval, MC2368 & MC2369 ML0421504382004-10-0606 October 2004 Relief, Relief Request Re. Maximum Allowable Flaw Width When Planar Flaw Evaluation Rules May Be Applied ML0424300292004-08-27027 August 2004 Relief Request 1-RR-05 Use of Code Case N-597-1 to Evaluate Pipe Wall Thinning, MC1580 ML0329302632003-10-15015 October 2003 American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, Appendix Viii, Supplement 10 - Qualification Requirements for Dissimilar Metal Piping Welds, Request for Relief PDI-3 ML0300906472003-01-0909 January 2003 Relief, Volumetric Examination for Reactor Vessel Head-to-Flange Weld, MB5693 ML0203101852002-02-0606 February 2002 Relief Request, Evaluation of ISI Program 2023-08-28
[Table view] Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:Safety Evaluation
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22293A4082022-11-14014 November 2022 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22070A0022022-03-28028 March 2022 Review of the Fall 2021 Mid Cycle Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Report ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21130A6012021-05-13013 May 2021 Correction of Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21110A0372021-04-29029 April 2021 Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21064A4082021-03-10010 March 2021 Correction of Safety Evaluation for License Amendment Nos. 143 and 50 (EPID L-2020-LLA-0005) (Non-Proprietary) ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants ML20057E2422020-03-30030 March 2020 Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML20024F8352020-02-24024 February 2020 Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML19336C5192019-12-10010 December 2019 Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values 2024-01-29
[Table view] |
Text
January 9, 2003 Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1 EVALUATION OF AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) INSERVICE INSPECTION (ISI) PROGRAM REQUEST FOR RELIEF 1-ISI-13 (TAC NO. MB5693)
Dear Mr. Scalice:
Tennessee Valley Authoritys (TVAs) letter of June 27, 2002, requested relief from ASME Section XI Code-required examinations because TVA could not achieve full inspection coverage due to limitations which were identified in the Unit 1, Cycle 4 refueling outage. TVA submitted this relief request, concerning examination of the reactor vessel head-to-flange weld, in accordance with 10 CFR 50.55a(g)(5)(iii).
The U.S. Nuclear Regulatory Commission staff, has reviewed and evaluated the relief request.
Based on the information provided by TVA, the staff concludes that the request for relief is acceptable. Therefore, TVAs Relief Request No. 1-ISI-13 is granted pursuant to Title 10, Code of Federal Regulations, Section 50.55a(g)(6)(i), for the first 10-year ISI interval on the basis that the full inspection required by the Code is impractical and the examinations performed provide reasonable assurance of structural integrity of the subject welds.
A copy of our safety evaluation is enclosed.
Sincerely,
/RA/
Allen G. Howe, Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosure:
Safety Evaluation cc w/enclosure: See next page
ML030090647 *see previous concurrence OFFICE PDII-2/PM C PDII-2/LA C EMCB/BC* OGC PDII-2/SC NAME MPadovan BClayton SCoffin RHoefling AHowe DATE 12/27/02 1/02/03 12/12/02 12/31/02 1/09/03 Mr. J. A. Scalice Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:
Mr. Karl W. Singer, Senior Vice President Mr. Paul L. Pace, Manager Nuclear Operations Licensing and Industry Affairs Tennessee Valley Authority Watts Bar Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381 Mr. James E. Maddox, Acting Vice President Mr. Larry S. Bryant, Manager Engineering & Technical Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Senior Resident Inspector Mr. William R. Lagergren Watts Bar Nuclear Plant Site Vice President U.S. Nuclear Regulatory Commission Watts Bar Nuclear Plant 1260 Nuclear Plant Road Tennessee Valley Authority Spring City, TN 37381 P.O. Box 2000 Spring City, TN 37381 Rhea County Executive 375 Church Street General Counsel Suite 215 Tennessee Valley Authority Dayton, TN 37321 ET 11A 400 West Summit Hill Drive County Executive Knoxville, TN 37902 Meigs County Courthouse Decatur, TN 37322 Mr. Robert J. Adney, General Manager Nuclear Assurance Mr. Lawrence E. Nanney, Director Tennessee Valley Authority Division of Radiological Health 6A Lookout Place Dept. of Environment & Conservation 1101 Market Street Third Floor, L and C Annex Chattanooga, TN 37402-2801 401 Church Street Nashville, TN 37243-1532 Mr. Mark J. Burzynski, Manager Nuclear Licensing Ms. Ann P. Harris Tennessee Valley Authority 341 Swing Loop Road 4X Blue Ridge Rockwood, Tennessee 37854 1101 Market Street Chattanooga, TN 37402-2801
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FIRST 10-YEAR INTERVAL INSERVICE INSPECTION REQUEST FOR RELIEF NO. 1-ISI-13 WATTS BAR NUCLEAR PLANT, UNIT 1 TENNESSEE VALLEY AUTHORITY DOCKET NUMBER 50-390
1.0 INTRODUCTION
Tennessee Valley Authoritys (TVAs) letter of June 27, 2002, requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components. TVA requested relief from the Code-required examinations because it could not achieve full inspection coverage of the reactor vessel head-to-flange weld due to limitations which were identified in the Unit 1, Cycle 4 refueling outage. TVA submitted this relief request in accordance with Title 10, Code of Federal Regulations (10 CFR), Section 50.55a(g)(5)(iii).
2.0 REGULATORY EVALUATION
Inservice inspection of ASME Code Class 1, 2, and 3 components is to be performed in accordance with Section XI of the ASME B&PV Code and applicable addenda as required by 10 CFR 50.55a(g), except where specific relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). As stated in 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph (g) may be used, when authorized by the U.S. Nuclear Regulatory Commission (NRC), if the licensee demonstrates that: (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The 1989 Edition of the ASME Code,Section XI, is the Code of record for the Watts Bar Nuclear Plant, Unit 1, first 10-year ISI interval.
3.0 TECHNICAL EVALUATION
Code Requirement: ASME Section XI, 1989 Edition, Table IWB-2500-1, Examination Category B-A, Item Number B1.40, examination requirement as defined by Figure IWB-2500-5.
Enclosure
Licensees Code Relief Request: In accordance with 10 CFR 50.55a(g)(5)(iii), TVA requested relief from performing Code-required volumetric examination of essentially 100% of the full volume of the reactor vessel head-to-flange weld.
Licensees Basis for Relief Request: (as stated):
The design configuration of the reactor vessel head-to-flange weld precludes an ultrasonic examination of the required volume for the head-to-flange weld. The design configuration limits ultrasonic examination of the code required examination volume to approximately 75%. This percentage is calculated in accordance with TVA Procedure N-GP-28, Calculation of ASME Code Coverage for Section XI NDE [nondestructive examination] Examinations.
Licensees Proposed Alternative Examination: (as stated):
The code required volumetric examination of the full volume of the reactor vessel head-to-flange weld will be performed on accessible areas to the extent practical given the design configuration of the head-to-flange weld. The code required surface examination will be performed on 100% of the weld length for this weld.
To meet the Inspection Program B minimum/maximum examination requirements for Examination Category B-A as defined in ASME Section XI, IWB-2412, the head-to-flange weld is divided into two sections. One section, W08-09-A, was scheduled for examination during the first period and was examined during the Cycle 2 refueling outage. The other section, W08-09-B, was scheduled for examination during the second period and was examined during the Cycle 4 refueling outage . . . . Request for relief 1-ISI-06 was submitted for weld W08-09-A after examination during the Cycle 2 refueling outage. The request for relief was granted pursuant to 10 CFR 50.55a(g)(6)(i) by NRC letter Watts Bar Nuclear Plant - First 10 Year Interval Inservice Inspection Program Plan Requests for Relief Nos. 1-ISI-5 and 1-ISI-6 (TAC No.
MA6446), dated March 24, 2000.
Staff Evaluation:
ASME Code,Section XI, Examination Category B-A, Item B1.40, requires 100-percent surface and volumetric examination, as defined by Figure IWB-2500-5, for reactor vessel head-to-flange welds. TVA requested relief from the Code-required volumetric examination for reactor vessel head-to-flange weld W08-09-B pursuant to 10 CFR 50.55a(g)(5)(iii). The complete circumferential reactor vessel head-to-flange weld is identified by two weld identifier numbers, W08-09-A and W08-09-B, as described above. TVA inspected weld W08-09-B during the second ISI-inspection interval. However, the geometric curvature of the flange, in combination with restrictions caused by O-ring grooves and locations for recessed O-ring clips limit complete ultrasonic scans of the full volume of this weld. Therefore, the Code-required 100-percent volumetric examination of weld W08-09-B is impractical. To gain access for 100-percent coverage, the component would have to be redesigned and modified. Thus, imposing the Code requirements would be a significant burden on TVA.
TVA was is able to achieve 75 percent of the required volumetric examination coverage. In addition, TVA completed the Code-required 100-percent surface examination. TVA said in the
summary section of the Watts Bar, Unit 1, ASME Section XI ISI Summary Report for the Fourth Refueling Cycle (see TVAs letter of May 2, 2002), that the results of all the examinations met the applicable acceptance standards. Therefore, these examinations provide reasonable assurance of the structural integrity of weld W08-09-B. Accordingly, relief is granted pursuant to 10 CFR 50.55a(g)(6)(i).
3.0 CONCLUSION
The staff evaluated TVAs submittal and concludes that the Code-required 100-percent volumetric examination of weld W08-09-B is impractical and the examinations performed provide reasonable assurance of structural integrity of the subject welds. Therefore, Request for Relief No. 1-ISI-13 is granted pursuant to 10 CFR 50.55a(g)(6)(i) for the first 10-year ISI interval. The NRC staff has determined that granting relief pursuant to 10 CFR 50.55a(g)(6)(i) is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.