January 2, 2003 Carolina Power & Light Company ATTN:
Mr. J. W. Moyer Vice President H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550
SUBJECT:
INSPECTION OF SECURITY INTERIM COMPENSATORY MEASURES
Dear Mr. Moyer:
On August 26, 2002, the NRC staff completed its mid-cycle plant performance assessment of the H. B. Robinson facility and provided you with an inspection plan detailing the inspections scheduled through September 30, 2003. At that time, you were advised that the NRC was in the process of finalizing a Temporary Instruction (TI) that would be used to review implementation of the Security Interim Compensatory Measures (ICMs) required by the Agencys Order issued on February 25, 2002, and you would be informed of the schedule for the TI inspection at a later date.
On September 13, 2002, TI 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued. Subsequently, we conducted a pre-inspection audit utilizing Appendix A of the TI to obtain preliminary information on your implementation of the ICMs. With the completion of the audits at the Region II sites, we have developed an inspection schedule to complete the remaining portion of the TI, Appendices B and C, which will fully examine the details of implementation of the ICMs in the areas of security, operations, emergency planning, and information technology. The schedule for these inspections at Region II sites is enclosed. In addition, the TI is being conducted in lieu of the security baseline inspections in the schedule enclosed with our August 26, 2002 letter; however, additional inspections may be scheduled later in calendar year 2003.
If you have any questions regarding the conduct or schedule of TI 2515/148 inspections, please contact me at 404-562-4653.
Sincerely,
/RA/
Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-261 License No. DPR-23
Enclosure:
TI Inspection Schedule
CP&L 2
cc w/encl:
Chris L. Burton Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution T. P. Cleary Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Terry C. Morton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Electronic Mail Distribution C. T. Baucom, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution B. L. Fletcher III, Manager Regulatory Affairs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
S. C. Department of Health and Environmental Control Electronic Mail Distribution Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution William D. Johnson Vice President & Corporate Secretary Carolina Power & Light Company Electronic Mail Distribution John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211
CP&L 3
Distribution w/encl:
R. Subbaratnam, NRR C. Evans (Part 72 Only)
RIDSNRRDIPMLIPB PUBLIC OFFICE RII RII SIGNATURE ATB NAME A Boland P Fredrickson DATE 01/02/03 12/31/02 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030090617.wpd
TI 2515/148 INSPECTION SCHEDULE Date (Week of)
Site Completed Catawba 01/06/03 Surry 01/13/03 Farley 01/27/03 St. Lucie 02/03/03 Browns Ferry 02/18/03 Brunswick 03/10/03 Summer 03/31/03 Turkey Point 04/07/03 Harris 04/14/03 Crystal River 05/12/03 Hatch 05/19/03 Robinson 06/16/03 Vogtle 06/23/03 Sequoyah 07/14/03 Watts Bar 08/04/03 McGuire 09/08/03 North Anna 09/15/03 Oconee Enclosure