ML030080445

From kanterella
Jump to navigation Jump to search
Technical Specification 3.4.16, Revise Reactor Coolant System Specific Activity
ML030080445
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/06/2003
From:
NRC/NRR/DLPM/LPD4
To:
References
Download: ML030080445 (2)


Text

RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity LCO 3.4.16 The specific activity of the reactor coolant shall be within limits.

APPLICABILITY: MODES 1 and 2, MODE 3 with RCS average temperature (Tavg) > 500°F ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT 1-131 ------------ Note-----------

> 0.45 pCi/gm. LCO 3.0.4 is not applicable. I A.1 Verify DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131 within the acceptable region of Figure 3.4.16-1.

AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limit.

(continued)

COMANCHE PEAK - UNITS 1 AND 2 3.4-44 Amendment No. 64, 102

RCS Specific Activity 3.4.16 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE IFREQUENCY SR 3.4.16.2 ---------------- NOTE ---------------

Only required to be performed in MODE 1.

Verify reactor coolant DOSE EQUIVALENT 1-131 specific 14 days activity < 0.45 pCi/gm.

AND Between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a THERMAL POWER change of _>15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period SR 3.4.16.3 ---------------- NOTE -----------------

Not required to be performed until 31 days after a minimum of 2 effective full power days and 20 days of MODE 1 operation have elapsed since the reactor was last subcritical for _>48 hours.

Determine Efrom a sample taken in MODE 1 after a 184 days minimum of 2 effective full power days and 20 days of MODE 1 operation have elapsed since the reactor was last subcritical for > 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

COMANCHE PEAK - UNITS 1 AND 2 3.4-46 Amendment No. 64, 102