Public Meeting Summary - Plant Performance and Planned Major Projects - Watts Bar
ML030070380
Person / Time
Site: Watts Bar  
Issue date: 01/03/2003
From: Cahill S
Reactor Projects Region 2 Branch 6
To: Scalice J
Tennessee Valley Authority
Shared Package
ML030070366 List:
References
Download: ML030070380 (5)


Text

January 3, 2003 Tennessee Valley Authority ATTN: Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

- PLANT PERFORMANCE AND PLANNED MAJOR PROJECTS - WATTS BAR DOCKET NOS.: 50-390, 50-391

Dear Mr. Scalice:

This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia, on December 18, 2002, at 1:30 p.m. The meetings purpose was to discuss Watts Bar plant performance and planned major projects. Enclosed are a list of attendees and the presentation handout.

The discussions included the following topics: Plant Performance Summary, Site Focus Areas, Performance Indicators, and Major Projects. The meeting was informative and a useful general exchange of information. It did not result in specific action items or decisions.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4520.

Sincerely,

/RA/

Stephen J. Cahill, Chief Reactor Projects Branch 6 Division of Reactor Projects

Enclosures:

1. List of Attendees
2. Handout - Watts Bar Nuclear Plant - Plant Performance Docket Nos.: 50-390, 50-391 License Nos.: NPF-90 and Construction Permit No. CPPR-92 cc w/encls: (See page 2)

2 TVA cc w/encls:

Karl W. Singer Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution James E. Maddox, Acting Vice President Engineering and Technical Services Tennessee Valley Authority Electronic Mail Distribution William R. Lagergren Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution Robert J. Adney, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority Electronic Mail Distribution Paul L. Pace, Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution County Executive Rhea County Courthouse 375 Church Street, Suite 215 Dayton, TN 37321-1300 County Executive Meigs County Courthouse Decatur, TN 37322 Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail Distribution Ann Harris 341 Swing Loop Rockwood, TN 37854 John D. White, Jr., Director Tennessee Emergency Management Agency Electronic Mail Distribution Distribution w/encls: (See page 3)

3 TVA Distribution w/encls:

M. Padovan, NRR.

J. Bartley, DRP RII RIDSNRRDIPMLIPB PUBLIC PUBLIC DOCUMENT (circle one): YES NO OFFICE DRP/RII SIGNATURE NAME DATE E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\\WB\\Meetings\\WB Meeting Summary 12-18-02.wpd LIST OF ATTENDEES Nuclear Regulatory Commission L. Reyes, Regional Administrator, Region II (RII)

B. Mallett, Deputy Regional Administrator, (RII)

H. Christensen, Deputy Director, Division of Reactor Safety, RII L. Plisco, Director, Division of Reactor Projects (DRP), RII S. Cahill, Branch Chief, Reactor Projects Branch 6, DRP, RII Tennessee Valley Authority B. Lagergren, Site Vice President L. Bryant, Plant Manager J. Laughlin, Engineering and Support Manager J. Kammeyer, Engineering Manager N. Welch, Work Control Manager T. Wallace, Operations Manager P. Pace, Licensing & Industry Affairs Manager