E-mail from H. Nieh, Oedo, to Reactor Tas, Fwd: Davis-Besse Head Update W/Att 05/03/02 e-mail Form D. Pickett, NRR, to A. Hiser, NRR, Et AlML023570347 |
Person / Time |
---|
Site: |
Davis Besse ![Cleveland Electric icon.png](/w/images/7/78/Cleveland_Electric_icon.png) |
---|
Issue date: |
05/06/2002 |
---|
From: |
Ho Nieh NRC/EDO |
---|
To: |
NRC/OCM |
---|
References |
---|
Download: ML023570347 (2) |
|
|
---|
Category:E-Mail
MONTHYEARML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19106A2512019-04-16016 April 2019 NRR E-mail Capture - Davis-Besse - Proposed License Condition and Draft Safety Evaluation for the License Amendment Request to Adopt NFPA 805 ML19073A1112019-03-14014 March 2019 NRR E-mail Capture - Davis-Besse - Acceptance of License Amendment Request for Permanently Defueled License and Technical Specifications ML19043A6962019-02-0808 February 2019 NRR E-mail Capture - Davis-Besse License Amendment Request for the Post-Shutdown Emergency Plan ML18320A1272018-11-16016 November 2018 NRR E-mail Capture - Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions ML18282A1482018-10-0909 October 2018 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Exemption Related to the Suspension of Security Measures in an Emergency or During Severe Weather, EPID L-2018-LLL-0016 ML18282A2422018-10-0808 October 2018 OEDO-18-00160, FENOC Fleet, 2.206 Petition, Submission of Supplement Dated October 8, 2018, from the Petitioners - PRB and Petitioners (Elpc), Includes Email, Cover Letter from Elpc, and the Attachments to the Email 2023-05-08
[Table view] |
Text
, .ael Tschiltz - Fwd: Davis-Besse Head Update iaelTscilt - wd:Davs-BsseHea "
UpatePage Pag From: Ho Nieh & 00IZ 211 To: Reactor TAs Date: Mon, May 6, 2002 6:26 AM
Subject:
Fwd: Davis-Besse Head Update Latest on Davis-Besse repair options...see attached.
Also public meetings this week...
5/7, at HQ, to discuss techinical issues related to the root cause analysis 5/9, in Oak Harbor, OH, 0350 panel public meeting Ho 0c-o0 -o04
M;chael Tschiltz - Davis-Besse Head Update Page From: Douglas Pickett To: Allen Hiser; Andrea Lee; Anthony Mendiola; Beth Wetzel; Bill Bateman; Brian Sheron; Bruce Boger; Carol Moyer; Chia-Fu Sheng; Dale Thatcher; Edward Andruszkiewicz; Ho Nieh; James Davis; Jay Collins; Jin Chung; John Zwolinski; Jon Hopkins; Keith Wichman; Kenneth Chang; Kenneth Karwoski; Michael Switzer; Richard Barrett; Satwant Bajwa; Stephanie Coffin; Stephen Sands; Steven Bloom; Steven Long; Tad Marsh; Terence Chan; Theodore Quay;, Timothy Steingass; William Cullen; William Dean Date: Fri, May 3, 2002 5:29 PM
Subject:
Davis-Besse Head Update To all:
The Davis-Besse licensee has informed us that replacement of the reactor pressure vessel head has taken priority over their previous plans to repair the existing head. However, during the interim period, they plan to continue both activities in parallel.
During a phone call with the licensee this afternoon, they presented the following:
- Consumers Power has offered a 30-day option to purchase the Midland head. They indicated they are currently in day 3 of this understanding.
- Their plan is to have Framatome purchase the RPV head and the service structure housing the CRDMs.
Framatome would ensure the paperwork is appropriate to meet NRC regulations and then sell the RPV head to FirstEnergy. This supercedes a former plan of shipping the RPV head to B&W Canada.
- The Midland reactor vessel has undergone a full system hydro test. However, it is not clear how to factor this into post-repair acceptance testing.
- The Midland and Davis-Besse reactor vessels are nearly identical. The Midland head has the same materials and susceptibilities of CRDM cracking.
- The licensee believes the original N-stamp of the RPV head is still valid. The licensee agreed that certification would be key to staff approval. While evidence exists to show that all appropriate paperwork was originally inplace, the licensee indicated that some paperwork may no longer be available.
- The Midland head has been observed by FirstEnergy and some rust exists on the head. The licensee plans to perform non-destructive examinations to augment paperwork.
- The licensee wants to continue telecons with the NRR staff over the next week to increase their confidence that there will be no regulatory surprises. We have tentative plans for a conference call sometime after 2:00 p.m. on Monday.
- We indicated that a replacement head appears to be a more desirable alternative. Also, to ensure public confidence, we indicated our desire to hold a public meeting on this subject (in addition to conference calls) in the near term.
- Finally, we indicated that continuing the parallel paths of RPV repair and replacement are putting a strain on our resources. The licensee has established separate repair and replacement teams and intends to' make a final decision in the near future.
CC: Christine Lipa; Douglas Simpkins; James Gavula; John Grobe; Laura Collins; Melvin Holmberg; Ronald Gardner