November 2002 Monthly Operating Report for Palo Verde Nuclear Generating Station, Units 1, 2, & 3
ML023570168
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/10/2002
From:
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
219-002831-DMS/SMM
Download: ML023570168 (6)


Text

AA subsidiary of Pinnacle West Capital Corporation David M. Smith Operations Director Tel. 602-393-2656 Mail Station 7294 Palo Verde Nuclear Fax 602-393-1806 PO Box 52034 Generating Station e-mail:

Phoenix, Arizona 85072-2034 David M Smith(@apsc.com December 10, 2002 219-002831-DMS/SMM U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 Monthly Operating Reports for NOVEMBER 2002 Enclosed are the Monthly Operating Reports for NOVEMBER 2002, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

Also included, is a corrected page for Unit 1. On-Line and Critical Hours were revised after this report was initiated and sent out.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Sue Meyer at (602) 250-3078.

Sincerely, DMS/SMM/cj

Enclosures:

NOVEMBER 2002 Monthly Operating Reports cc:

E. W. Merschoff (all w/enclosures)

PVNGS Resident Inspector INPO Records Center Utility Data Institute

Page Two NRC Monthly Operating Report Distribution List 219-002831-DMS/SMM December 9, 2002 bcc:

J. E. Orsborn G. R. Overbeck File Copy C. D. Mauldin D. M. Smith M. K. Banks C. R. Emmett D. G. Marks C. K. Seaman D. L. Sills B. J. Hansen M. Van Dop J.

Simpkins GADS Copy J. M. Levine

, W. L. Stewart J. E. McDonald S. M. Foote (3146) (all w/enclosures)

(7602)

(7602)

(7605)

(7294)

(7615)

(7615)

(7636)

(7636)

(7565)

(7693)

(7512)

(7512)

(8983)

(9046)

(9082)

(8508)

(8508)

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-528 PVNGS-1 12/09/02 S. M. Meyer (602) 250-3078 November 2002

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 Unit I Generating Statistics'-

This Month Yr. to Date Cumulative Hours Reactor was Critical 682.1 7,186.1 113,417.2 Hours Generator was On-Line 666.0 7,151.8 112,039.4 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 673,574 8,791,082 134,754,640 UNIT SHUTDOWNS Method of Shutting Down Reactor 3 Cause and Corrective Action to Prevent Occurrence 02-02 10/3 02-03 11/1(

IF-Forced S-Scheduled 1

0 F

29.6 F

42.8 F

B 2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

I I

RX was manually shutdown/tripped due to elevated SG#2 sulfate levels. Returned to power on 11/01 RX was manually tripped to repair vibrations on SIA-UV-651. Returned to power on 11/12.

3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip I Scram 4-Continuation 5-Other-(Explain)

SUMMARY

-1I-

3.
4.
5.

6.

No.

Date Outage Duration Hours Type 1 Reason2

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

50-529 PVNGS-2 12/09/02 S. M. Meyer (602) 250-3078 November 2002

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 Unit 2 Generating Statistics This Month Yr. To Date

-Cumulative' Hours Reactor was Critical 720.0 7,266.0 113,167.5 Hours Generator was On-Line 720.0 7,237.6 111,835.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 914,376 9,072,134 135,996,645 UNIT SHUTDOWNS No.

Date Type 1 Outage Duration Hours Reason 2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of November 2002.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training t License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

3.
4.
5.

6.

1F-Forced S-Scheduled

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-530 PVNGS-3 12/09/02 S. M. Meyer (602) 250-3078 Reporting Period:

November 2002

1.

Design Electrical Rating (Net MWe):

1269

2.

Maximum Dependable Capacity (Net MWe):

1247 Unit 3 Generating Statistics This Month Yr. to Date Cumulative

3.

Hours Reactor was Critical 720.0 8,016.0 109,439.7

4.

Hours Generator wasiOn-Line 720.0 8,016.0 108,451.9

5.

Unit Reserve Shutdown'Hours 0.0 0.0 0.0

6.

Net Electrical Energy Generated (MWh)I 918,844 10,186,146 132,555,596 UNIT SHUTDOWNS Outage Duration Method of Shutting Down No.

Date Type 1 Hours Reason 2 React No reactor shutdowns occurred during the month of November 2002.

or3 Cause and Corrective Action to Prevent Occurrence 2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training I License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

1F-Forced S-Scheduled J

2

DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period:

NRC MONTHLY OPERATING DATA REPORT

- REVISED 50-528 PVNGS-1 11112/02 S. M. Meyer (602) 250-3078 October 2002

1.

Design Electrical Rating (Net MWe):

1265

2.

Maximum Dependable Capacity (Net MWe):

1243 Unit I Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 24.0 6,504.0 112,735.1 Hours Generator was On-Line 5.8 6,485.8 111,373.4 Unit Reserve Shutdown Hou-rs -

0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 0 8,117,508 134,081,066 UNIT SHUTDOWNS Method of Shutting Down Reactor3 1 1 Cause and Corrective Action to Prevent Occurrence UIRIO refueling outage ended 10/30/02.

RX was manually shutdown/tripped due to elevated SG#2 sulfate levels.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method:

1-Manual 2-Manual Trip / Scram 3-Automatic Trip / Scram 4-Continuation 5-Other-(Explain)

SUMMARY

3.
4.
5.

6.

No.

02-01 02-02 Date 9/28 10/31 Outage Duration Hours 791.9 18.2 Type 1 S

F Reason 2 C

F IF-Forced S-Scheduled