ML023540127

From kanterella
Jump to navigation Jump to search

November 2002 Monthly Operating Report for Limerick Units 1 & 2
ML023540127
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/13/2002
From: Braun R
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
T.S. 6.9.1.6
Download: ML023540127 (3)


Text

"Exeln.

Exelon Nuclear Limerick Generating Station PO Box 2300 Sanatoga, PA 19464 wwwexeloncorp corn Nuclear T.S. 6.9.1.6 December 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

- Limerick Generating Station,-Units J and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Report for November 2002 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of November 2002 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Robert C. Braun Plant Manager Attachments cc:

H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, LGS USNRC Senior Resident Inspector

/-_1 R. C.

Unit:

Docket No:

Date:

Completed by:

Telephone:

Limerick 1 50-352 12/13/02 Greg Lee (610) 718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-November 2002 IDesign Electrical Rating (MWe-Net)

I1191 i

Maximum Dependable Capacity (MWe-Net) 1134 Monnh Ye.ar to Date Cumulative Hours Reactor Critical (Hours) 720.0 7,569.2 129,124.4 Hours Generator On-Line (Hours) 720.0 7,501.0 127,165.1 Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 846,674,

8,407,256 130,889,255 P

iiNiT.HiITflOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off-line Duration (hrs)

None During November 1 12002 11

SUMMARY

Unit 1 began the month of November 2002 at 100% of rated thermal power (RTP).

There were no changes in reactor power on Unit 1 in November 2002.

Unit 1 ended the month of November 2002 at 100% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. -

SAFETY/RELIEF VALVE OPERATION 1'

Date Valves Actuated No. & Type of Actuation Plant Condition

.escription ot Event None During November 2002

Unit:

Docket No:

Date:

Completed by:

Telephone:

Limerick 2 50-353 12/13/02 Greg Lee (610)718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-November 2002 I Design Electrical Rating (MWe-Net) 1191 Maximum Dependable Capacity (MWe-Net) 1134 Mnnth IYear to Date ICumulative Hours Reactor Critical (Hours) 720.0 7,950.5 105,383.5

-'------i IJt-utr

nrrntrr fln.i me (Hniir

-


4---- -720.0-I------

"7:92. -

1u0j.t,1i.0-i-Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 844,504 9,135,251 110,759,975 B.

UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off-line Duration (hrs)

None during November 2002

SUMMARY

Unit 2 began the month of November 2002 at 100% of rated thermal power (RTP).

On November 12 1 at 23:01 hours, reactor power was reduced to 97% RTP for a deep shallow rod pull.

On November 13'n at 01:29 hours, reactor power was restored to 100% RTP.

Unit 2 ended the month of November 2002 at 100% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

-- F-Administrative-G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During November 2002 I