"Exeln.

Exelon Nuclear Limerick Generating Station wwwexeloncorp corn Nuclear PO Box 2300 Sanatoga, PA 19464 T.S. 6.9.1.6 December 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

- Limerick Generating Station,-Units J and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Report for November 2002 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of November 2002 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely,

/-_1 R. C.

Robert C. Braun Plant Manager Attachments cc: H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, LGS USNRC Senior Resident Inspector

1' -,

Unit: Limerick 1 Docket No: 50-352 Date: 12/13/02 Completed by: Greg Lee Telephone: (610) 718-3707 A. OPERATING DATA REPORT REPORTING PERIOD-November 2002 IDesign Electrical Rating (MWe-Net) I1191 i Maximum Dependable Capacity (MWe-Net) 1134 Monnh Ye.ar to Date Cumulative Hours Reactor Critical (Hours) 720.0 7,569.2 129,124.4 Hours Generator On-Line (Hours) 720.0 7,501.0 127,165.1 Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 846,674 , 8,407,256 130,889,255 P iiNiT.HiITflOWN No. Date Type Generator Reason Method Corrective Actions/Comments (yymmdd) Off-line Duration (hrs)

None During November 1 12002 11

SUMMARY

Unit 1 began the month of November 2002 at 100% of rated thermal power (RTP).

There were no changes in reactor power on Unit 1 in November 2002.

Unit 1 ended the month of November 2002 at 100% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. - - SAFETY/RELIEF VALVE OPERATION -.-

Date Valves Actuated No. & Type of Actuation Plant Condition .escription ot Event None During November 2002

Unit: Limerick 2 Docket No: 50-353 Date: 12/13/02 Completed by: Greg Lee Telephone: (610)718-3707 A. OPERATING DATA REPORT REPORTING PERIOD-November 2002 I Design Electrical Rating (MWe-Net) 1191 Maximum Dependable Capacity (MWe-Net) 1134 Mnnth IYear to Date ICumulative Hours Reactor Critical (Hours) 720.0 7,950.5 105,383.5

-'------i IJt-utr nrrntrr fln.i me (Hniir - --------------4---- -720.0-I------ "7:92. - - 1u0j.t,1i.0-i-Net Reserve Shutdown Unit Electrical Hours (Hours)

Energy (MWh) 0.0 844,504 0.0 9,135,251 0.0 110,759,975 B. UNIT SHUTDOWN No. Date Type Generator Reason Method Corrective Actions/Comments (yymmdd) Off-line Duration (hrs)

None during November 2002

SUMMARY

Unit 2 began the month of November 2002 at 100% of rated thermal power (RTP).

On November 12 1 at 23:01 hours, reactor power was reduced to 97% RTP for a deep shallow rod pull.

On November 13'n at 01:29 hours, reactor power was restored to 100% RTP.

Unit 2 ended the month of November 2002 at 100% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

-- F-Administrative-G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. &Type of Actuation Plant Condition Description of Event None During November 2002 I