NRC C Omments on Initial Examination Submittal Written Examination Worksheet, Es - 401 - 9 and Review of Operating Test for the Kewaunee Initial Examination - August / September 2002
ML023460256
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/11/2002
From: Bielby M
NRC/RGN-III/DRS/OLB
To:
Nuclear Management Co
References
50-308/02-301
Download: ML023460256 (14)


Text

NRC COMMENTS ON INITIAL EXAMINATION SUBMITTAL WRITTEN EXAMINATION WORKSHEET, ES-401-9 AND REVIEW OF OPERATING TEST FOR THE KEWAUNEE INITIAL EXAMINATION - AUG/SEP 2002

FORM ES-40i-9

7.

ExlaOn D

MOD. mNRC 1t297 INPO Bank) d c

,B H

2 U

NEW. NRC: DisCgatong t & t indicate use of manual steam dump H 2 controller following control room evacuation. If manual steam dump controler unavailable outside control room can eliminate B and D.

LICENSEE: No manual steam dump outside control room, will change B or D to make it a creditable disaactor.

4B F

U BANK. NRC: Change disitractor 'C' to match sesntence structure of others.

In '0' find a way to rephrase term lost.'

LICENSE: Agree to changes, also Identified that B.- could also be correct, FW 12 isolation valve would also be affected. Will rewrite dlstractors.

5B H

3 S

BANK. NRC:Knowledgeoftrpsandinterlocksisfundamental.

LICENSEE: Have to know long term effects, normal lineup, control of Pzr change, what happened when faulted.

Instructions (Refer to Section D of ES-401 and Appendix B for additional Information regarding each of the following concepts.]

1.

Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognItive level.

2.

Enter the level of difficulty (LOD) of each question using a I -5 (easy - difficult) rating scale (questions In the 2 - 4 range are acceptable).

3.

Check the aprrit box Ifa1 sconhi flow is ldentltled:

3. C Teth mle ar ck5.-*

Uret focuues to elicit the correct answer (e.g., unclear Intent, more In-formatio is needed, or too much needless Information).

The sten or distractors contain cues i.e., clues, specific determiners, phrasing, length, etc).

The answer choices area collection of unrelated true/false statements.

More than one dlstractoir Is niot credible.

one or more distractorI is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4.

Check the a box If a mob content error Is Identified:

T qu~esto Is not linked to the job requirements Q.e. the question has a valid I(JA but, as written, is not operatioalI content) ec for the cosed r test mode (i.e., it Is not reIred to be known from memoy).

The question r n dsunrealisc level of accuracy or Inconsistent units (e.g., panel meter in percent wtth question In gallons).

The question requires reverse logic or applIcon compared to the job requirements.

5.

Check questios that are sampled for conformance with the approved K/A and those that are designated SRO-mny (K/A and license levl mismatches are unacceptable).

6.

Based on the reviewer's judgment, is the question as written (U)nacceptable (requiring repair or replacement), In need of (E)dltorlal enhancement, or (S)atIsfactory?

7.

Atamrinimum, eRan~an U1rati (e.,how the Ar ndB rhmetric attributes are

= met.

I I

S

SXNV, (NItC 6197 PQ S

NEW.

S BANK (NRC 12197 Wng RO to Identify a procedure transition S

NEW. NRC--')QuWWisas 5Ro function. 2) Questlon is Fnot vlhich is an f W to recognize procedure transition Points LICENSEE* ROs are trairw normally performs that function.

plans

).,MxWh an STA and 186-51M (parameters,

leaming obotves NRC-Licensee Provided appropriate to ZýýOrt S

NEW.

S BANK (NRC &" PT S

NEW.

S MOD. (NRC 9198 IN, PO tractor's appear to be parameter signals out E

BANK NRC.. All of the dio porot vAthin the system, thus stands vvtweas the answer is acom

)e. (NRC stge INPO ViBRI because, of its differen( nd avg power are, averaged by a cornPOnent LICENSEE-The,,a,4g a as a component (Summer) to balance (circuit), ;,j %%iil list B or D distralctors.

S NEW. I NRC. E). stands Out because it is a generic statement, distmdOs U

BANK ecific components.

are actions applied to 9, 0 to apply to comport", e I'ý n.

LICENSEE'. Wit rewrite S

NEW.

S NEW.

S NEW.

-page 4 of 10

Explanation NEW.

BANK (NRC 1102 PB)

BANK BANK NEW. NRC: Question is asidng RO to Identify a procedure transition which Is an SRO function.

s rctdr e

i LICENSEE: ROs are trained to recognize (parameWNRCa iso ee an STA no efally performs that function.

ofa NRC: Licensee provided averonithe Warning objectives and lesson Is to suppor K/A"-'

BANK-NRC: include statement in stem about availability Of steam tables.

(NRC 2196 CC )

BANK (NRC 12100 KEW)

S NEW. NRC: Capitalize "ony in distractor.

LICENSEE: Agreed.

NEW.

NEW.

NEW. NRC" K/A is *Kowledge of the effect of a loss or malfunctio', nofthe following (pumps) wil h ave on the ArFW "opne

. Ths question I about impact on S/G Blowdown not AFW components.SGbodn LICENSEE: Could not writ a.....arabl qusint-etK Kwl change to KJA K4.

,= BANK. {NRC 1/M2 PS) 3 BANK. {NRC 112/00 KEW)

S NEW.

Page 5 of 10

1.
2.
3. Psychometric Flaws
4. Job Content Flaws
5. Other
6.
7.

Q#

LOK LOD (F/H)

(1-5)

FcStem Cues TIF Cred. Partial Job-Minutia

  1. V Back-Q=

SRO U/E/S Explanation

.1 Focus DistD.

Link j units jward K/A9 Ony 65B F H 3

E BANK NRC: LOK listed is F, I believe it requires analysis. Applicant could assume that CS was just actuated then reach a different conclusion.

LICENSEE: Will add "large break LOCA" to stem which would indicate that CS has been running for some time.

NRC: Agree 66B FH 2

/

/

U BANK NRC: Is thls materal that an operator ls expected to know from memory? Not RO responsibility. Question doesnt meet KA for "predicting Impact.

LICENSEE: Provided objective and lesson plans. Operations agreed. Will rewrite question to Include "prediction."

NRC: If "predict..." incorporated, would make question H.

67B H

2 S

BANK NRC: (NRC 12/7 Kew) 68B H

3 S

BANK 0B H

3 E

NEW. NRC: Correct answer "C" stands out, add "...and test should be terminated." to "C" to balance distractors.

LICENSEE: Agreed.

70B H

3 E

NEW. NRC: See question page for change to stem.

LICENSEE: Agreed.

71B H

3 S

BANK 72R 4 F 2

/

U BANK NRC: LOK listed Is H, I belleve it is fundamental memory based on knowledge of interlocks. Question #75 supplies answer to Q #72.

LICENSEE: Will write new question.

73B H

2 S

BANK 74B F

3 S

BANK NRC: Operation of the toggle switch goes beyond the K/A and requires Implementing/recall of Abnormal procedure subsequent steps from memory.

LICENSEE: Provided objective and Lesson Plan reference.

75B F

2 S

NEW. NRC: Question #75 supplies answer to Q #72 LICENSEE: Q#72 will be replaced.

Page 7 of 10

1.
2.
3. Psychometric Flaws
4. Job Content Flaws
5. Other
6.
7.

Q#

LOK LOD (F/H)

(1-5)

Stem Cues T/F Cred. Partial Job-Minutia

  1. t tBack-Q=

SRO U/E/S Explanation Focus Dist.

Link

=

units ward K/A Only 76B F

3 S

MOD.

77B F H 3

/

U NEW. NRC: Question LOK listed Is F, I believe it requires analysis.

Selected KIA is an A2, which has two parts: 1) predict Impacts and 2) use procedures to mitigate etc. Question does not predict Impact.

LICENSEE: Will rewrite.

78R H

3 S

MOD.

79R F

2 S

BANK 80B H

2 S

BANK (NRC 5/01 Kew) 81R H

3 V,'

U NEW. NRC: Make answers consistent, A&B are diagnosis of problem; C&D are actions to take.

LICENSEE: Agreed.

82B F

3 S

NEW.

83R H

3 S

NEW.

84B F

3 S

BANK 85B F

3 S

NEW.

86B F

3 S

NEW.

87B H

3 S

NEW.

88B F

2

/

U NEW. NRC: Stem is not required to answer question, replace/rewrite.

LICENSEE: Rewrite choices and stem so that it Isn't T/F.

89R F

2 S

BANK (NRC 1/02, PB) 90B H

3 S

NEW.

91B H

3 S

MOD.

92R F

3 E

NEW.

Page 8 of 10

Page 9 of 10

1.
2.
3. Psychometric Flaws
4. Job Content Flaws
5. Other
6.
7.

Q#

LOK LOD (F/H)

(1-5)

Stem ICues IT/F ICred. Partial Job-Minutia V 1 Back-IQ= ISRO UEI Explanvation Focus Dist.

Link units ward IKA Only

,9Br' F

2 S

NEW.

tR F

2 S

NEW.

95B F

2 S

MOD. (NRC 1/02 PB) 11B F

2 S

NEW.

SH 2

S BANK 98B F

3 S

BANK (NRC 102 PB) 99B F

3 S

NEW.

IOOB H

3 S

NEW.

49 H

2 S

NEW.

2S H

3 S

MOD. (NRC 2/02 Kew)

H 3

S NEW.

45 H

2 S

NEW.

5S F

2 S

NEW.

6S F

2 S

NEW.

S H

3 S

NEW.

8S F

3 S

MOD. (NRC 1/02 PB)

SrS F

2 S

BANK (NRC 1/02 PB) 10S F

3 S

MOD. (NRC 10/97 Bw)

Sr, H

3 S

NEW.

12S F

2 S

NEW.

13S H

3 S

NEW.

1.
2.
3. Psychometric Flaws
4. Job Content Flaws
5. Other
6.
7.

Q#

LOK LOD (FIH)

(1-5)

Stem Cues TIF Cred.

Partial Job-Minutia

  1. / 1Back Q= 1SRO UiE/S Explanation Focus Dist.

Link units ward WKA I Only 14S H

2 S

NEW.

-1ý6S F

2 S

NEW.

16S H

2 S

NEW.

S4 F

2 S

NEW.

18S H

2 S

NEW.

9*

H 3

S NEW.

20S H

3 S

BANK 21S H

2 S

NEW.

22S F

2 S

NEW.

23S H

3 S

NEW.

24S H

3 S

NEW.

S H

2 S

NEW.

Page 10 of 10 Higher Fundamental New Bank Modified RO 14+42=56 11+33=44 54 9+28--37 3+10=13 SRO 17+42=-59 8+33=41 58 1+28=29 3+10=13

Kewaunee Station Operating Exam Comments Suggest using colored (ie, yellow...) paper for the JPMs and white for the applicant procedures/handouts...

JPMs: NUREG 1021, ES-301, D.3.b, states that for each system selected for evaluation, select one task from the applicable KA catalog or site task list for which a JPM exists or can be developed.

Administrative JPMs:

JPM A. 1.a Perform Pre-critical Checklist:

NRC: No comments.

JPM A. 1.b Perform Manual Estimated Critical Position Calculation:

NRC: No comments.

JPM A.2:

NRC: No comments.

JPM A.3 (SRO) Emergency RWP Approval:

NRC: No comments.

JPM A.3 (RO) Perform Radiation Monitor Functional Test:

NRC:

1) Replace JPM. The JPM was not a Administrative JPM topic Category A.3 task, but rather a B.1 task, "Control Room Systems."

LICENSEE:

1) Facility will look at replace/rewrite.

JPM A.4 (SRO) Classify An Event per the Emergency Plan:

NRC:

1) Item 4 on the Event Notice form was identified as critical, but does not appear to be.

LICENSEE:

1) Agree, not critical.

JPM A.4 (RO) Manually Start the CRPA Recirculation System:

NRC:

(1) Replace JPM. The JPM was not a Administrative JPM topic Category A.4 task, but rather a B. 1 task, "Control Room Systems."

LICENSEE:

1) Facility will look at replace/rewrite.

System JPMs:

JPM B.1.a Perform Actions to Stop a CRW:

NRC:

1) Both B.1.a and B.1.g require applicants to recognize an abnormal condition and trip the reactor. The alternate path resolution is too similar, need to change one of the JPM end points. Suggest modifying B.l.a as follows: Have the farthest rod stop once rod control switch placed in Manual, diagnose the problem, and restore the rod configuration. In addition, the SROs could assess the TS LCO for misaligned rods.
2) Step 5 is not critical.

Page 1 of 3

LICENSEE:

1) Look at rewrite.

JPM B.1.b With a Fire in a Dedicated Zone-Restore RCS Inventory Using the Sl System:

NRC:

1) JPM Step 5 should be critical.
2) JPM Step 7 should be critical.

LICENSEE:

1) Look at rewrite.

JPM B.1.c Start a Reactor Coolant Pump:

NRC: No comments.

JPM B.1.d Secure Containment Spray Pumps:

NRC:

1) Do applicants perform this evolution during the scenarios?

LICENSEE:

1) Not scheduled to perform.

JPM B.1.e Shift Bus 5 from TAT to RAT:

NRC:

1) Combine JPM Steps 6 and 7 into one critical step.

LICENSEE:

1) Will do.

JPM B.1.f Place an Excore NI Channel OOS:

NRC:

1) JPM Step 7 is not critical.

LICENSEE:

1) Will look at.

JPM B.1.g Shift CCW Pumps:

NRC:

1) JPM Step 1 is critical.

In-Plant JPMs:

JPM B.2.a Perform Actions for CR Evacuation-Establish LD from DSDP:

NRC: No comments.

JPM B.2.b Locally Operate the SG PORV:

NRC:

1) No alternate path identified. Need to rewrite/replace with alternate path.

LICENSEE:

1) Incorrect JPM was sent, will submit correct JPM during validation week.

JPM B.2.c Locally Operate the DG:

NRC:

1) JPM Step 10 is not critical.
2) JPM Step 11 is not critical.

LICENSEE:

1) Will look at.
2) Will look at.

Page 2 of 3

Scenarios 1. 2. & 3):

Scenario 1:

NRC:

1) Event 4, RCS leak, will accept as C failure providing we can get adequate evaluation of applicant (ie, diagnose leak, determine leak size, take action address leak such as increase charging... If we can't get adequate evaluation, we will not count as a C.
2) The reactor trip occurs after the leak becomes larger, and should be part of the M.

LICENSEE:

1) Will rewrite event, such that RCS leak is an event, but the increased leak size with reactor trip is part of the major transient.

Scenario 2:

NRC:

1) Event 4 will only count as a C for the RO if he performs substantive actions to diagnose the location of the leak and determine the size of the leak; otherwise, it will count as part of the M.

LICENSEE:

1) Understand.

Scenario 3: No comments.

Page 3 of 3