ML023290004
| ML023290004 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 11/27/2002 |
| From: | Brian Benney NRC/NRR/DLPM/LPD4 |
| To: | Stephen Dembek NRC/NRR/DLPM/LPD4 |
| Benney B, NRR/DLPM, 415-3764 | |
| References | |
| Download: ML023290004 (5) | |
Text
November 27, 2002 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Brian Benney, Project Manager, Section 2
/RA/
Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH ENERGY NORTHWEST DATE & TIME:
Thursday, December 12, 2002 10:00 a.m. - 12:00 noon LOCATION:
U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-14B8 Rockville, Maryland 20852 PURPOSE:
To discuss the recent performance issues associated with the Columbia Generating Station alternate source term submittal. (See attached agenda).
CATEGORY*:
This meeting is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC ENERGY NORTHWEST L. Brown D. Atkison M. Blumberg M. Humphreys B. Benney B. Boyum P. Hearn D. Coleman J. Bongarra R. Lobel Docket No. 50-397
Attachment:
Agenda (Adams Accession No. ML023290004) cc w/att: See next page MEETING CONTACT: Brian Benney at (301) 415-3764 or BJB@nrc.gov.
- Commissions Policy Statement on "Enhancing Public Participation in NRC Meetings,"
67 Federal Register 36920, May 28, 2002
November 27, 2002 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
Brian Benney, Project Manager, Section 2
/RA/
Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH ENERGY NORTHWEST DATE & TIME:
Thursday, December 12, 2002 10:00 a.m. - 12:00 noon LOCATION:
U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-14B8 Rockville, Maryland 20852 PURPOSE:
To discuss the recent performance issues associated with the Columbia Generating Station alternate source term submittal. (See attached agenda).
CATEGORY*:
This meeting is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC ENERGY NORTHWEST L. Brown D. Atkison M. Blumberg M. Humphreys B. Benney B. Boyum P. Hearn D. Coleman J. Bongarra R. Lobel Docket No. 50-397
Attachment:
Agenda (Adams Accession No. ML023290004) cc w/att: See next page DISTRIBUTION: See next page MEETING CONTACT: Brian Benney at (301) 415-3764 or BJB@nrc.gov.
- Commissions Policy Statement on "Enhancing Public Participation in NRC Meetings,"
67 Federal Register 36920, May 28, 2002 Accession No.: ML023290004 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME BBenney:rkb EPeyton SDembek DATE 11/26/02 11/25/02 11/27/02 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML023290004.wpd OFFICIAL RECORD COPY
Columbia Generating Station cc:
Mr. Rodney L. Webring (Mail Drop PE04)
Vice President, Nuclear Generation Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396)
Vice President, Corporate Services/General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)
Manager, Performance Assessment and Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Ms. Christine Perrino (Mail Drop PE20)
Manager, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, WA 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352-0069 Mr. Dale Atkinson (Mail Drop PE08)
Vice President, Technical Support Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Thomas C. Poindexter, Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Mr. Bob Nichols Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113 Ms. Lynn Albin Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
DISTRIBUTION FOR MEETING NOTICE WITH ENERGY NORTHWEST - DECEMBER 12, 2002 Dated: November 27, 2002 HARD COPY PUBLIC PDIV-2 Reading Receptionist OWFN / TWFN E-Mail:
RidsNrrAdpt (BSheron / JTsao)
RidsNrrDlpm(JZwolinski / TMarsh)
RidsNrrDlpmLpdiv (WRuland)
SDembek RidsNrrPMBBenney RidsNrrLAEPeyton RidsNrrAdpt (KJohnson)
RidsOpaMailCenter RidsRgn4MailCenter RidsAcrsAcnwMailCenter RidsOgcMailCenter SMorris (EDO)
BHenderson (OPA)
MKotzalas LBrown MBlumberg JBongarra PHearn RLobel PMNS
AGENDA FOR MEETING WITH ENERGY NORTHWEST ROCKVILLE, MD NRC HEADQUARTERS DECEMBER 12, 2002 1.
Introduction and opening remarks a.
NRC b.
Energy Northwest 2.
Review of submittal errors a.
Meteorological data b.
Main steam line break (MSLB) analysis 3.
Review of submittal issues
- a. X/Q analysis
- b. Control room ingress/egress
- c. Secondary containment drawdown analysis 4.
Actions being taken by Energy Northwest
- a. Meteorological data
- b. X/Q modeling and reanalysis
- c. Drawdown analysis
- d. MSLB analysis 5.
Project schedule 6.
Closing remarks 7.
Public Comment