October 2002 Monthly Operating Report for Palo Verde Units 1 2 & 3
ML023260020
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/14/2002
From: Ide W
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
035-00715-WEI/SMM
Download: ML023260020 (4)


Text

LAMS William E. Ide Mail Station 7602 Palo Verde Nuclear Vice President TEL (623) 393-6116 P 0 Box 52034 Generating Station Nuclear Production FAX (623) 393-6077 Phoenix, AZ 85072-2034 035-00715-WEI/SMM November 14, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 Monthly Operating Reports for OCTOBER 2002 Enclosed are the Monthly Operating Reports for OCTOBER 2002, prepared and submitted pursuant to Specification 5.6.4 of Appendix A, (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV and the NRC Resident Inspector.

If you have any questions, please contact Sue Meyer at (602) 250-3078.

Sincerely, WEI/SMM/cj

Enclosures:

OCTOBER 2002 Monthly Operating Reports cc: E. W. Merschoff (all w/enclosures)

PVNGS Resident Inspector INPO Records Center Utility Data Institute

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: 50-528 UNIT NAME: PVNGS-1 DATE: 11/12/02 COMPLETED BY: S. M.Meyer TELEPHONE: (602) 250-3078 Reporting Period: October 2002

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243 Unit I Generating Statistics This Month Yr. to Date Cumulative
3. Hours Reactor was Critical 24.1 6,504.1 112,735.2
4. Hours Generator was On-Line 5.9 6,485.9 111,373.5
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 0 8,117,508 134,081,066 UNIT SHUTDOWNS Outage Method of Duration Shutting Down 3

Cause and Corrective Action No. Date Type' Hours Reason 2 Reactor to Prevent Occurrence 02-01 9/28 S 791.9 C 1 U1R10 refueling outage ended 10/30/02.

02-02 10/31 F 18.2 F 1 RX was manually shutdown/tripped due to elevated SG#2 sulfate levels.

1F-Forced 2 3 Reason: Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: 50-529 UNIT NAME: PVNGS-2 DATE: 11/12/02 COMPLETED BY: S. M. Meyer TELEPHONE: (602) 250-3078 Reporting Period: October 2002

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243 Unit 2 Generating Statistics This Month Yr. To Date Cumulative
3. Hours Reactor was Critical 744.0 6,546.0 112,447.5
4. Hours Generator was On-Line 744.0 6,517.6 111,115.6
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 937,210 8,157,758 135,082,269 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type' Hours Reason 2 Reactor 3 to Prevent Occurrence No reactor shutdowns occurred during the month of October 2002.

2 IF-Forced Reason: 3 Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip I Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 11/12/02 COMPLETED BY: S. M. Meyer TELEPHONE: (602) 250-3078 Reporting Period: October 2002

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity (Net MWe): 1247 Unit 3 Generating Statistics This Month Yr. to Date Cumulative
3. Hours Reactor was Critical 744.0 7,296.0 108,719.7
4. Hours Generator was On-Line 744.0 7,296.0 107,731.9
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 942,551 9,267,302 131,636,752 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date TypeI Hours Reason 2 Reactor 3 to Prevent Occurrence No reactor shutdowns occurred during the month of October 2002.

2 3 1FForced Reason: Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY