ML023250188
| ML023250188 | |
| Person / Time | |
|---|---|
| Site: | Indian Point (DPR-026, DPR-064) |
| Issue date: | 11/21/2002 |
| From: | Conte R NRC/RGN-I/DRS/OSB |
| To: | Barrett R Entergy Nuclear Operations |
| Shared Package | |
| ML023010488 | List: |
| References | |
| Download: ML023250188 (5) | |
Text
November 21, 2002 Mr. Robert J. Barrett Vice President - Operations Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating, Units 2 and 3 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -
INDIAN POINT STATION, UNITS 2 AND 3
Dear Mr. Barrett:
In telephone conversations on November 18, 2002, between Mr. T. Fish, Senior Examiner, and Mr. F. Wilson, arrangements were made for the administration of licensing examinations at Indian Point Station, Units 2 and 3, during the weeks of March 10 and 17, 2003.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by December 30, 2002. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by January 27, 2003.
Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
Mr. Robert J. Barrett 2
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Wilson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. J. Caruso at (610) 337-5389 for questions regarding Unit 2 examinations, Mr. T. Fish at (610) 337-5369 for questions regarding Unit 3 examinations, or me at (610) 337-5183.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos.
50-247, 50-286 License Nos. DPR-26, DPR-64
Mr. Robert J. Barrett 3
cc:
J. Yelverton, Chief Executive Officer M. R. Kansler, Senior Vice President and Chief Operating Officer J. Herron, Senior Vice President R. J. Barrett, Vice President - Operations C. Schwarz, General Manager - Operations D. Pace, Vice President - Engineering J. Knubel, Vice President Operations Support J. McCann, Manager, Nuclear Safety and Licensing J. Kelly, Director of Licensing E. Libby, Manager - Operations Training F. Wilson, Manager - Operations Training C. Faison, Manager - Licensing, Entergy Nuclear Operations, Inc.
H. Salmon, Jr., Director of Oversight, Entergy Nuclear Operations, Inc.
J. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.
J. DeRoy, General Manager of Plant Operations F. Dacimo, Vice President - Operations J. Comiotes, Director, Nuclear Safety Assurance W. Flynn, President, New York State Energy, Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. Eddy, Electric Division, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law T. Walsh, Secretary, NFSC, Entergy Nuclear Operations, Inc.
Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Executive Chair, Four County Nuclear Safety Committee S. Lousteau, Treasury Department, Entergy Services, Inc.
M. Slobodien, Director Emergency Programs B. Brandenburg, Assistant General Counsel P. Rubin, Operations Manager Assemblywoman Sandra Galef, NYS Assembly County Clerk, Westchester County Legislature A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizens Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt R. Schwartz, SRC Consultant R. Toole, SRC Consultant C. Hehl, SRC Consultant
Mr. Robert J. Barrett 4
Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions C. Terry, Niagara Mohawk Power Corporation J. Riccio, Greenpeace Congresswoman Sue W. Kelly Congressman Ben Gilman Congresswoman Nita Lowey Senator Hilary Rodham Clinton Senator Charles Schumer A. Matthiessen, Executive Director, Riverkeepers, Inc.
M. Kapolwitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates M. Jacobs, Director, Longview School D. Katz, Executive Director, Citizens Awareness Network P. Gunter, Nuclear Information & Resource Service P. Leventhal, The Nuclear Control Institute K. Copeland, Pace Environmental Litigation Clinic R. Witherspoon, The Journal News
Mr. Robert J. Barrett 5
Distribution w/encl:
Region I Docket Room (with concurrences)
P. Drysdale, SRI, IP3 - NRC Resident Inspector P. Habighorst, SRI, IP2 - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA H. Nieh, RI EDO Coordinator R. Laufer, NRR J. Andersen, NRR P. Milano, PM, NRR G. Vissing, Backup PM, NRR P. Eselgroth, DRP W. Cook, DRP R. Junod, DRP R. Martin, DRP W. Lanning, DRS R. Crlenjak, DRS R. Conte, DRS J. Caruso, DRS, Chief Examiner for Unit 2 T. Fish, DRS, Chief Examiner for Unit 3 C. Buracker, DRS (OL Facility File)
DRS File DOCUMENT NAME: G:\\OSB\\Fish\\IP2&3ExamMar2003\\120dayexamltr.wpd ADAMS PKG: ML023010488 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker TFish RConte DATE 11/20/02 11/20/02 11/20/02 11/ /02 11/ /02 OFFICIAL RECORD COPY