NRC Corporate Notification Ltr Dtd 11/5/02
ML023090133
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/05/2002
From: Conte R
NRC/RGN-I/DRS/OSB
To: Skolds J
Exelon Generation Co, Exelon Nuclear
Shared Package
ML021290026 List:
References
Download: ML023090133 (5)


Text

November 5, 2002 Mr. Jack Skolds President and CNO Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road 5th Floor Warrenville, IL 60555

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -

THREE MILE ISLAND NUCLEAR STATION, UNIT 1

Dear Mr. Skolds:

In telephone conversations on November 4, 2002 between Mr. Joseph DAntonio, Examiner/Inspector, and Mr. Russell Gumbert, Operations Training Manager, arrangements were made for the administration of licensing examinations at Three Mile Island Nuclear Station, Unit 1, during the week of February 17, 2002.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by December 9, 2002. The written examinations, operating tests, and the supporting reference materials requested by Mr. DAntonio will be due by January 6, 2003. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

Mr. Jack Skolds To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Gumbert has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. DAntonio at (610) 337-5085, or me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-289 License No. DPR-50

Mr. Jack Skolds cc w/encl:

AmerGen Energy Company - Correspondence Control Desk President and CNO, Exelon Nuclear Vice President TMI Unit 1 Manager, Regulatory Assurance Plant Manager Director-Licensing Licensing and Regulatory Affairs- Vice President, Exelon Corporation Operations Training Manager TMI-Alert (TMIA)

R. Janati, Chief, Division of Nuclear Safety D. Allard, PADER M. Schoppman, Framatome

Mr. Jack Skolds Distribution w/encl:

Region I Docket Room (with concurrences)

J. Orr, DRP - Senior Resident Inspector H. Miller, RA J. Wiggins, DRA J. Rogge, DRP R. Barkley, DRP H. Nieh, OEDO S. Richards, NRR T. Colburn, PM, NRR Tam, Backup PM, NRR J. DAntonio, DRS, Chief Examiner C. Buracker, DRS (OL Facility File)

R. Conte, DRS DRS Master Exam File DRS File DOCUMENT NAME: G:\OSB\Dantonio\TMIExamFeb2003\120DAYEXAMLTR.WPD ADAMS PKG: ML021290026 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker JDAntonio RConte/DSilk for DATE 11/04/02 11/05/02 11/05/02 09/ /03 09/ /03 OFFICIAL RECORD COPY